6 April 2006, LGStatus Report Beam Working Group1 Beam Working Group Status Report 6 April 2006 Presented by Lau Gatignon  Cedar status  MNP33-2  Outgassing.

Slides:



Advertisements
Similar presentations
FDWAVE : USING THE FD TELESCOPES TO DETECT THE MICRO WAVE RADIATION PRODUCED BY ATMOSPHERIC SHOWERS Simulation C. Di Giulio, for FDWAVE Chicago, October.
Advertisements

Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
Performance of MPPC using laser system Photon sensor KEK Niigata university, ILC calorimeter group Sayaka IBA, Hiroaki ONO, Paul.
Ian Bailey Cockcroft Institute/ Lancaster University October 30 th, 2009 Baseline Positron Source Target Experiment Update.
Pair Spectrometer Design Optimization Pair Spectrometer Design Optimization A. Somov, Jefferson Lab GlueX Collaboration Meeting September
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
The Tagger Microscope Richard Jones, University of Connecticut Hall D Tagger - Photon Beamline ReviewJan , 2005, Newport News presented by GlueX.
Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Timing Counter july 2004.
Impact of synchrotron radiation in LEPTON COLLIDER arcs
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
RF background, analysis of MTA data & implications for MICE Rikard Sandström, Geneva University MICE Collaboration Meeting – Analysis session, October.
Measurement of the absolute efficiency,
CIEMAT ACTIVITIES ON STRIPLINE KICKERS I. Rodríguez.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Magnet designs for Super-FRS and CR
Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet C. Mühle GSI Task leader: G. Moritz /GSI.
Measurement of 'intrinsic' properties of scintillating fibers H. Sakamoto Osaka University, Japan A.Sato M. Yoshida Y. Kuno Osaka Univ. K. Yoshimura KEK.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
The MPPC Study for the GLD Calorimeter Readout Introduction Measurement of basic characteristics –Gain, Noise Rate, Cross-talk Measurement of uniformity.
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
Muon Detector Jiawen ZHANG Introduction The Detector Choices Simulation The structure and detector design The Expected performance Schedule.
Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet C. Mühle GSI Task leader: G. Moritz /GSI.
Hongyu Fu, Trigger group The Monte Carlo for Trigger Design of BES3 Scintillating Fibre BEMC Outline: Introduction to BES3 Scin-fibre BEMC Trigger.
Status Report Beam Working Group 11 February 2005 Alternative optics MAMUD CEDAR Fluka simulations Main topics treated since December:
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
GlueX Two Magnet Tagger G. Yang University of Glasgow Part 1, 3 D Tosca analysis. Part 2, Preliminary Drawings. Part 3, Proposed Assembly Procedures (i)
Initial (FLUKA) calculations for synchrotron radiation at TLep April 4 th, 2013 F. Cerutti, A. Ferrari, L. Lari* *BE Dept.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Status of photon sensor study at Niigata University -- SiPM and MPPC -- Photon sensor mini workshop 05/9/16 University Niigata University.
Use LL1 & LL6 to detect microwave radiation equipping the empty pixels with microwave radio receivers Pixels without photomultipliers (removed to be installed.
EMMA: Pulsed magnets Kiril Marinov MaRS group, ASTeC, Daresbury Laboratory 1.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, May 25, 2004 Purpose:  Provide pion – muon separation (muon veto)
MAMUD Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, March 29, 2005 Purpose:  Provide pion – muon separation.
TIMING COUNTER: status report Giorgio CECCHET, PSI July 11th, 2003.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
SBS Magnet and Support Status Robin Wines June 2013.
Comparison of different km3 designs using Antares tools Three kinds of detector geometry Incoming muons within TeV energy range Detector efficiency.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
Basic Measurement of the Hamamatsu 10 inch PMT at –40 degree –40 degree Hiroko Miyamoto Dept. of Physics CHIBA University The Uniformity measurement of.
Rotated by ≈ 45 degrees Beam Diaphragm Many PMT’s Light condensor Mirror geometry:
Measurement of the Electron Cloud Density in a Solenoid Field and a Quadrupole Field K. Kanazawa and H. Fukuma KEK June 2009 CTA09 1.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
Date of download: 7/8/2016 Copyright © 2016 SPIE. All rights reserved. (a) The cross sectional plot of the normalized pressure distribution p¯=p∕p0 in.
A new QF1 magnet for ATF3 Alexey Vorozhtsov
Design ideas for a cos(2q) magnet
PreShower Characterisations
One plane dipole corrector for the CLIC MBQ TYPE 1
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Some Design Considerations and R &D of CEPCB Dipole Magnet
CEDAR PROJECT STATUS FROM BEAM WG
PROGRESS REPORT OF A NLNS-FFAG ADS MAGNET
CHEN, Fusan KANG, Wen November 5, 2017
Main magnets for PERLE Test Facility
Update on out-gassing tests
Jim Crittenden Electron Cloud/Impedance Meeting 27 May 2015
Status of the TOF Detector
Chris Smith California Institute of Technology EPS Conference 2003
Timing Counter Sept CSN I, Assisi 2004 Giorgio Cecchet.
The Pixel Hybrid Photon Detectors of the LHCb RICH
Power Magnetic Devices: A Multi-Objective Design Approach
MEG II実験 液体キセノン検出器の建設状況
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
The MPPC Study for the GLD Calorimeter Readout
Presentation transcript:

6 April 2006, LGStatus Report Beam Working Group1 Beam Working Group Status Report 6 April 2006 Presented by Lau Gatignon  Cedar status  MNP33-2  Outgassing studies  Beam design

6 April 2006, LGStatus Report Beam Working Group2 CEDAR (plur R.Malleyran), picture from 1976:

6 April 2006, LGStatus Report Beam Working Group3 CEDAR internal structure (+ Claude Bovet)

6 April 2006, LGStatus Report Beam Working Group4 Part of diaphragm

6 April 2006, LGStatus Report Beam Working Group5 Beam Diaphragm Many PMT’s Light condensor Cedar design: Use ellipsoidal mirrors (tilted at 45 o ) to produce larger light spot Use segmented photon detectors to lower rate per channel Simulation includes: absolute  production rate according to N pe = N o L sin 2  with N o = 370 eV -1 cm -1 e  E over range Å parabolic approximation of quantum efficiency: 25% at 4000 Å, 9% at 2000, 6000 Å 10x10 mm 2 PMT’s with 8x8 mm 2 sensitive area Cedar without ‘nose’, realistic beam parameters, scattering in H 2

6 April 2006, LGStatus Report Beam Working Group6

6 April 2006, LGStatus Report Beam Working Group7 100 transverse,140 radial  [2800,4400 A] 60x30 mm 2 light spot! X of seen p.e. at PM location [mm] X at PM [mm] Y at PM [mm]

6 April 2006, LGStatus Report Beam Working Group8

6 April 2006, LGStatus Report Beam Working Group9 OR at each PMT location, ‘old logic’ : 50 MHz * 23 PMT out of 8 * 6*3 = 144  8 MHz per PMT

6 April 2006, LGStatus Report Beam Working Group10 Define symmetry of cells hit: Symmetry = 1-(Asym X * Asym Y ) Cut Symmetry Symmetry * #cells hit

6 April 2006, LGStatus Report Beam Working Group11

6 April 2006, LGStatus Report Beam Working Group12 For 1.5 mm diaphragm gap, cut at Symm*Nr cells > 7:

6 April 2006, LGStatus Report Beam Working Group13 Laser +attenuator assembly Alfredo Placci

6 April 2006, LGStatus Report Beam Working Group14 R x10mm2 Specs Alfredo Placci

6 April 2006, LGStatus Report Beam Working Group15 Hamamatsu R2248 Divider HV 1200 V Pulser laser 30 MHz Noise(1 p.e.) 13 mV average, 5 mV sigma Pulse height 66 mV average, 28 mV sigma Alfredo Placci

6 April 2006, LGStatus Report Beam Working Group16 Alfredo Placci

6 April 2006, LGStatus Report Beam Working Group17 MAPM H6568 HV 1000V Left: Pulse rate 30 MHz p.h. 147 mV,sigma 45 mV Right:Pulse rate 50 MHz, p.h. 140 mV, sigma 40 mV Alfredo Placci

6 April 2006, LGStatus Report Beam Working Group18 MAPM pulse height vs laser frequency(1.5 ns width, 0.8 ns rise-time) for various HV’s: move 800 V, yellow 900V,blue 1000 V, upper 1100V Alfredo Placci

6 April 2006, LGStatus Report Beam Working Group19 MNP33-2 requires a field integral times higher ( 1.2 Tm ) with a similar field distribution in between the 2.4 m pole vertical aperture. This can be obtained with a slight increase of the magnet length. The design aim is also to keep the maximum current at a value not too far from that of MNP33-1, for obvious reason of cost optimization the available power is (from J.P. Burnet information): NR A / 600V DC NR31-07+ND A / 600V DC Marcello Losasso

6 April 2006, LGStatus Report Beam Working Group m 4.4 m 4 m 2.5 m MNP33-2 upgraded; how it could be Marcello Losasso

6 April 2006, LGStatus Report Beam Working Group21 Bdl is 1.1 Tm in a range -2.5 m to 2.5 m Bdl is 1.2 Tm in a range -4 m to 4 m Bmax = 0.36 T Marcello Losasso Marcello will provide field map at straw planes – is this acceptable for straws?

6 April 2006, LGStatus Report Beam Working Group22 Total weight of iron is around 130 ton A cost of 3 ckf/Kg (including machining) can be reasonably expected Iron price can be estimated around 400 Kchf Marcello Losasso

6 April 2006, LGStatus Report Beam Working Group23 Coil Cross section: 0.29 m x 0.29 m Current is 2.3 KA Conductor is 21 x 21 mm (with 10 mm cooling hole) Total number of turns x coil is 196 x coil Current density in Cu is about 7 A/mm2 Total length of conductor x coil is about 3 Km (10 ton) Marcello Losasso

Update on outgassing measurements 1. Blue tube 2005 test2006 test Duration of pumping, days1015 Vacuum reached, mbar3 · · Average outgassing, (mbar l)/(sec cm 2 )1.6 · · High vacuum outgassing, (mbar l)/(sec cm 2 )3 · · Outgassing load (high vacuum), (mbar l)/sec1 · Worst (dynamic) outgassing, (mbar l)/(sec cm 2 )6.5 · Worst outgassing load (dynamic), (mbar l)/sec4.8 · Preliminary mass spectrometer measurement shows that the main gas component is water Valeri Falaleev

6 April 2006, LGStatus Report Beam Working Group25 Valeri Falaleev

6 April 2006, LGStatus Report Beam Working Group26 2. Scintillator 20 plate proto in big tank 2 plates in small tank CKM Number of days to reach stable pressure days of pumping Average outgassing, (mbar l)/(sec cm 2 )7 · · ·10-9 Worst outgassing, (mbar l)/(sec cm 2 )2 · Valeri Falaleev

6 April 2006, LGStatus Report Beam Working Group27 Valeri Falaleev

6 April 2006, LGStatus Report Beam Working Group28 3. Blue tube + Scintillator Reasonable case Worst case Blue tube outgassing load (mbar l)/sec1 · · Scintillator outgassing load (mbar l)/sec5.1 · · Total outgassing load (mbar l)/sec6.1 · · Pump power needed to reach 1 · mbar (100% conductance), l/sec 6.1 · · 10 4 Blue tubeScintillator “Reasonable” outgassing, (mbar l)/(sec cm 2 )1.35 · · Surface, cm · · 10 7 Reminder: 5 · 10 4 l/sec pumps are available on the market Valeri Falaleev

6 April 2006, LGStatus Report Beam Working Group29 Niels This is of some importance already now because it impacts on the design of the TAX and the choice of holes

6 April 2006, LGStatus Report Beam Working Group30 Niels

6 April 2006, LGStatus Report Beam Working Group31 Niels

6 April 2006, LGStatus Report Beam Working Group32 Niels

6 April 2006, LGStatus Report Beam Working Group33 Niels