SSR1 Tuner studies (work in progress) 1 L. Ristori – 29 Nov 2011 With slides from I. Gonin, M. Hassan and D. Passarelli.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

References Which were useful? Sources Fluid Power with Applications; Anthony Esposito Basics of Hydraulic Systems Qin Zhang Hydraulic and Pneumatics.
SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
1 Sensor and Actuator Slides Seth Young Mecatronics March 2006.
1 Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud Orsay cedex Tél. : Fax :
Juliette PLOUIN – CEA/SaclayCARE’08, 3 December /21 Superconducting Cavity activities within HIPPI CARE ‘08 CERN, 2-5 December 2008 Juliette PLOUIN.
325 MHz RF Cave and SC Spoke Cavity Tests Robyn Madrak – Accelerator Physics Center (APC) for the HINS/Project X Group.
D. Passarelli, M. Merio, L. Ristori, B. Wands March 29, 2012
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Target Specifications & History (to avoid reinventing a broken wheel!) 2 nd December 2009 Chris Booth The University of Sheffield.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Allan DeMello Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008 RFCC Module and Subcomponents Mechanical Design.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
D. Passarelli, M. Merio, L. Ristori, B. Wands March 13, 2012
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
ESS cavities interfaces
Page 1 Jean Delayen HyeKyoung Park Center for Accelerator Science Department of Physics, Old Dominion University and Thomas Jefferson National Accelerator.
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
Blade Tuner assembly Instruction for tuner assembly on a cryomodule May
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH September 19th 2008 VST Meeting1.
The design of elliptical cavities Gabriele Costanza.
Cavity support scheme options Thomas Jones 25/06/15 to 06/07/15 1.
SPOKE TUNER STATUS M. Merio, D. Passarelli, L. Ristori.
COSMOSMotion Slides.
Analysis of Microphonics in SSR1 for Project-X M. Hassan, D. Passarelli, I. Gonin, S. Barbanotti, L. Ristori, and S. Yakovlev 9/27/2011 PXIE Meeting.
Blade Tuner L. Lilje for the INFN colleagues. Disclaimer The slides were prepared by R. Paparella and N. Panzeri for Carlo Pagani who could not attend.
A preliminary approach to the needs of open loop control of the Lorentz Force Detuning is to generate a custom piezo control signal with proper and tunable.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Shuichi NoguchiHayama ILC Lecture, Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance 
Carlo Pagani University of Milano & INFN Milano - LASA WP8 Tuner Status & Perspective ILC-HiGrade Kick-Off Meeting DESY, Hamburg 29 August 2008 Material.
Cavity support scheme options Thomas Jones 1. Introduction Both cavities will be supported by the fundamental power coupler and a number of blade flexures.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
56 MHz SRF Cavity and Helium vessel Design
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
HiLumi-LHC/LARP Crab Cavity System External Review – May Work partly supported by the EU FP7 HiLumi LHC grant agreement No and by the.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
The Superconducting cavities of the European Spallation Source Superconducting Technologies Workshop CERN – 4 & 5 December 2012 Sébastien Bousson (CNRS/IN2P3/IPN.
Hayama ILC Lecture, , Shuichi Noguchi 1 Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
LCLS II Tuner Mechanics; Accessibility/Replacement E. Borissov, Yu.Pischalnikov SRF cavity Tuner Workshop, FNAL, Oct. 13.
Adam Carreon July 19, 2012 Technical Division SRF Department Dressed SSR1 Cavities.
Development of Cryo-Module Test System (CMTS-1) S.B. Jawale Head, Centre for Design and Manufacture BARC, Trombay, Mumbai Cryo-Module Test System.
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
TUNERS FOR SRF CAVITIES A Comparative Study – Mechanical Characteristics Presented by N. Dhanaraj.
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
Tuners for 1.3 GHz Elliptical Cavities Warren Schappert Fermilab TD/I&C Thursday May 29, 2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Engineering Design of Raon SC Cavities Myung Ook Hyun SCL Team Myung Ook Hyun SCL Team.
Cavity Supporting Scheme Paulo Azevedo, CERN – TE/MSC SPL Conceptual Review, 04/11/2010.
Microphonics Suppression in SRF cavities for Project X Yuriy Pischalnikov Warren Schappert Project X Collaboration Meeting Berkeley, April 11, 2012.
Shuichi Noguchi, KEKTTC Meeting at IHEP Beijin, Slide Jack Tuner.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
S. Posen and M. Liepe, Cornell University CW TTC Meeting 2013, Ithaca, NY 12 June 2013 S. Posen and M. Liepe. “Mechanical optimization of superconducting.
Piezo Tuning System (PTS)
PIP-II SSR1 Cryomodule Technical Issues Leonardo Ristori TTC Meeting
TDR guideline discussion on Cavity Integration
Spoke Resonators at Fermilab
Power Couplers, HOM Couplers and Tuners for the XFEL
Present status of the flux return yoke design
Tuner system Zhenghui MI 2017/01/17
CRAB cavities Cryomodule review Tuner
Mechanical setups Lorentz Force Detuning System Setup
Cavity + He Vessel interface
19th Catia/SmarTeam Users’ Forum
Tuner system for CEPC MI Zhenghui 2016/09/14
the angular speed is zero. the angular speed is constant.
Presentation transcript:

SSR1 Tuner studies (work in progress) 1 L. Ristori – 29 Nov 2011 With slides from I. Gonin, M. Hassan and D. Passarelli

Overview  Reduce the sensitivity to He pressure fluctuations of the system cavity+vessel+tuner.  Allow access for maintenance to motor and piezos through access port move piezos away from beam pipe  Guarantee an acceptable tuning efficiency (stroke of beam pipe / stroke of motor+piezos, >50%). High rigidity of tuner and/or low rigidity of cavity Mechanical advantage as close to 1:1 as possible (we had 1:5 in the prototype)  Guarantee a tuning Range of 200 kHz Avoid yield Limit the forces required 2

3  Cavity + vessel design was developed for df/dP≈0  The movable beam pipe (left in picture) was left free (conservative approach).  A Ring couples the cavity end walls with the helium vessel end walls brazed joint will be developed at ANL Comsol multiphysics df/dp ~ 4.9 Hz/Torr Ansys multiphysics df/dp ~ -1 Hz/Torr Ansys mechanical df/dp ~ 2.6 Hz/Torr

 The Diameter of the Ring has influence on several aspects.  Of major importance is the robustness of the df/dP value, how stable it is for small variations of the actual cavity+vessel shape.  We can predict (Passarelli) the df/dP value by looking at the deformations of the helium vessel at the connection points with the cavity (here called dRing and dBP).  Ring D=125 mm, df/dP= dRing – 0.53 dBP + 23 (Hz/torr)  Ring D=140 mm, df/dP= dRing – 0.52 dBP + 21 (Hz/torr)  Ring D=158 mm, df/dP= dRing – 0.57 dBP (Hz/torr)  Ring D=192 mm, df/dP = 0.07 dRing – 0.71 dBP (Hz/torr)  Lower coefficients for deformations at the Ring and Beam Pipe give a more stable df/dP 4

Study with Ring D = 158 mm  Df/dP = 5 Hz/torr (free BPs), 7 Hz/torr (fixed BPs) df/dP= dRing – 0.57 dBP (Hz/torr). 5 Deformations induced on the cavity+vessel with ring D=158 mm, due to 1 atm He pressure. Beam pipes deformations in the order of few μm.

 If we introduce a tuner similar to the lever prototype, the cavity deforms in an unwanted way.  The G3 vessel is more flexible than the prototype 6 Interface areas: A: tuning forces on cavity B: motor reaction forces C: pivoting point reaction forces When subject to an arbitrary tuning force, the beam pipe area appears to rotate (a) more than translate. Also, the end-wall shape is distorted (b) due to the reactions on the vessel wall (c) (a) (b) (c)

 If we change the leverage layout for the tuner: Translation of Beam Pipe Mechanical advantage reduced to 1:2 (lower is better for piezo stroke requirements) Reduced stiffness of cavity (increased tuning efficiency) ○ Vessel wall and cavity wall move in the same direction, the reaction forces do not “fight” the tuning forces 7 Motor +piezos Actuation points Pivot point

 2 nd option – pivot between motor and beampipe: Similar to prototype Translation of Beam Pipe Freedom of selecting the optimal mechanical advantage (1:1 – 1:5) Pivot bridge may be the weak link 8 M Actuation points Pivot point

9 motor Harmonic drive Screw nut arm F cav F nut l l e e piezo

Performance (TBC):  Motor maximum torque 12.5 N mm  Maximum force at drive nut (12.5 x 100) x 2pi / 1.5 = 52 kN  Piezo blocking force 4 kN / piezo  Example Cavity kc = 60 N/um e/l = 2 F nut = 22 kN / 2 = 11 kN Need 4 piezos of this kind Drive nut at 20% of max force 10 motor Harmonic drive Screw nut arm F cav l l e e piezo F nut

Ahead:  Optimal diameter for the Ring Low df/dp Stability of df/dp to manufacturing variations Low cavity spring constant  Tuning forces on cavity+vessel, do they alter the df/dP? If yes, can we minimize this effect by design?  Tuner design Identify the optimal interface locations Evaluate the required stiffness of the lever arm to guarantee an acceptable tuning efficiency (beam pipe stroke/ motor+piezo stroke ) Integrate piezo capsules between drive nut and lever arm Allow easy removal/installation of Motor+Piezos block from cryomodule access port 11