2001 Final Presentation. The Atlantic Team JARED Georgia Tech Construction Manager PETER Georgia Tech Construction Manager HANS Georgia Tech Owner KIM.

Slides:



Advertisements
Similar presentations
Loads and Load Paths "Architecture is inhabited sculpture."
Advertisements

Finding Errors in Structural Designs How is it Typically Done? James Hanson, Ph.D., P.E. Rose-Hulman Institute of Technology Voted #1 Eight Consecutive.
Skyscraper Construction
Express Team University of New Mexico February 24, 2006.
Architect: Greg Miller, Georgia Tech Engineer: Stratton Newbert, Stanford Construction: Lori Huneryager, Stanford Apprentice: Forest Flager, Stanford Owner:
Bay team’s Output Engineer Yang, Yao-Hung Construction Manager David Walthall Architect Cindy Chan.
Picture Lake Geneva, Switzerland Surrounded by the Alps 20°C mean temperature in summer Annual snow fall – 30in Site Context.
W a v e Mildred van der ZwanArchitect - TUDelft Valerie OuEngineer – Stanford Diego AvilesConstruction Manager - Stanford Daniel KwonApprentice.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
2001 Winter Presentation. Site Location Site View.
Mountain Ridge Project - winter presentation - AEC The making of Ridge University Engineering Building E ngineerMartha Del Campo, Stanford, CA A rchitectKatrin.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
Reading Structural Drawings
RAHINAH IBRAHIM Stanford University Architect CRAIG LONG Kansas University Engineer JORGE FUENTES Stanford University Construction Manager ROXANNE ZOLIN.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Kenneth G. Langone Athletic and Recreation Center Kyle Oberdorf Structural Option Thesis April 2007.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
Team Central Winter Presentationslide 1 of 65 Winter Presentation AEC Global Team Class 2002 Winter presentation Team Central.
First Baptist Church of Doylestown Senior Thesis Structural Emphasis James Chester Preliminary Phase II Design.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
Pacific Team Winter Quarter Presentation AMaria Zapata, Georgia Tech, Atlanta EAmir Kavousian, Stanford U, Stanford Xin.Zheng Lu, Tsinghua U, Beijing CKarthik.
Wood Construction CTC-375.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Mildred van der ZwanArchitect - TUDelft Valerie OuEngineer – Stanford Diego AvilesConstruction Manager - Stanford Daniel KwonApprentice – Stanford Brooke.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Reinsurance Group of America (RGA) Global Headquarters Natasha Beck Structural Option Faculty Advisor: Heather Sustersic Images courtesy of Gensler & Tom.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Swedish American Hospital Heart and Vascular Center Philip Frederick Structural Option AE Senior Thesis 15 April 2008.
Senior Thesis 2006 The Pennsylvania State University
Project Introduction  New high-tech classroom and lab facility  Area : 30,000sq.ft.  Function –To provide a home for innovative courses that take a.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Winter Presentation Island Introducing ISLAND 2000.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Architect (K.U.) ADAM GUMOWSKI V p A c i e w Engineer (S.U.) JASON STONE C.M. (S.U.) BOB FARMAN Winter Quarter Presentation acific P niversity.
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
Hunter Woron Spring 2012 Structural Professor Parfitt.
The Mountain Ridge Team Mountain Ridge Team Final Presentation The Ridge University Engineering Building May 15, 1998 Architect: Humberto Cavallin Engineer:
Structural Systems Design of the Lincoln Fire Department Headquarters Michelle Burback Structural Engineering Capstone and Senior Honors Project.
TeamMembers Team members of the Team members of the Angela Ribas
Lesson 5: Gravity Load Path
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Computer Integrated A/E/C
Lucas Pettinati Rafael Monzon Andreas Dinopoulos
Team Introduction Collaboration in Cyberspace
PACIFIC TEAM SPRING QUARTER PRESENTATION
The Mountain Ridge Team
Mountain Ridge Project
Mississippi Riverbank Project (Final Presentation) May 14, 1999
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
Lesson 5: Gravity Load Path
Presentation transcript:

2001 Final Presentation

The Atlantic Team JARED Georgia Tech Construction Manager PETER Georgia Tech Construction Manager HANS Georgia Tech Owner KIM Georgia Tech Architect YIP Stanford Engineer

Our Site - Boston

Site Location

 Peninsula  Area of in-filled land  Winter snow Site Constraints

Design Evaluation Architect: Concept fits local area Less visually pleasing Engineer: Rigid diaphragm problem Construction Managers: Best budget Architect: Best looking building Engineer: Girders have deflection problem Sloped roof helps snow load Construction Managers: Very constructable & best schedule Alternative 1Alternative 2

Design Choice Alternative 2 Best combination of strengths vs. weaknesses Wood / Steel Hybrid Combine the attractiveness / interest of 2W with the cost and schedule benefits of 2S Keep wood exterior structure of 2W, but incorporate the steel interior structure of 2S

Architectural Design Kim Ferraro

Design Vision Concepts  Box in a box  Simple, double structure  Advantageous use of sloped classroom and auditorium floors  Flow of light to below grade level  Exterior wood structure to gesture towards trees

Floor Plans Auditorium Classrooms, seminar rooms, labs Student offices Faculty offices, facilities, administration

Sections Special Auditorium and Classroom Section Typical Section

3D Model

Structural Design Wai Yip Chan

Engineering Constraints Soil Properties Compactable Soil 4000 psf bearing capacity Capacity, silt/clay and sand mixture 20’ water table Loading Live Load50 psf Dead Load70 psf Wind Load35 psf Roof Load28 psf

Engineering Design 3 Timber Steel Hybrid System

Evolution & Process Evolution TIE V Brace

Inside Frame Plan Typ Beam: W14X30 Typ Girder: W24X55 Typ Col: W12X40

Outside Frame Plan Pre-fabricated wood truss with knee brace Prefab wood truss 24” Column 12"DIA Knee brace 2"X6" Joist 2"X4"

ETAB Model Large drift in the top floor Maximum moment at the mid-height of the timber columns

Load Path Structure Load Path Gravity Load Lateral Load

Typical Connection Steel Bracing Wood / Steel Plate & Bolts

Construction Jared Ford Peter Knobel

Site Layout Crane: Arm Length = 106 ft Construction Road: 280 Feet Long Trailers: Located at Entrance Safety: Trailers & Toilets Not in Crane’s Radius

Constructions Methods Simultaneous Erection of Interior and Exterior Structure Prefabrication of Roof Trusses Work Sequence From the Center of the Building to the Two Outside Parts of the L-Shape -> Better Material Flow -> Simultaneous Work Opportunities

Budget Information

Cost Estimate

Cost Summary Total Means Cost = $2,920,500

Schedule

Schedule Summary Total Length of Construction: 160 work days = 33 weeks Evaluation: Completion 5 weeks earlier than required

Structure Sequencing Graded Site ExcavationFootingsFoundationBasement WallsBackfillInterior ColumnsExterior ColumnsInterior BeamsSlabsRoof TrussesRoof BracesRoof Decking

Construction Sequencing Complete Building

Equipment Selection Steer Loader Truck Crane Excavator Telescopic Handler

Team Dynamics ANYBODY OUT THERE?

A-E: Location of Auditorium E-C: Embedding of Exterior Columns in the Foundation A-C: Size and Scale of Glass Storefront A-E-C: Material Selection (Weather Constraints) A-E-C: Roof Shape and Structure A-E-C: Excavation Constraints (Infilled Land, Water) A-Owner: Building Height C-Owner: Budget and Schedule Iteration Issues THINKING DISCUSSION COMPROMISE CHANGE SOLUTION DECISION

Team Process “The process can be frustrating. We should always bear in mind that the other parties are not our enemies. We have the same goal, to design the building. Don’t let it get too personal, use the communication tools provided in this class, and then less frustration will occur.” “After getting to know the other’s expectations and concerns better, we handled all issues much easier, faster and more effective during the spring quarter by anticipating everybody’s opinions and, therefore, avoiding problems even before they arose.” “This spring we not only worked more thoroughly but understood that every detailed decision in one discipline in turn impacted the other two disciplines...Continuously iterating as we proceeded with the project”

Lessons Learned Cross-Discipline Knowledge Objectives and Concerns Different and Discipline-Based Development Habits Teamwork Efficiency Reliability Organization / Work Habits Technology New Hardware & Software More Effective Use

2001 Winter Presentation Questions?