DOC ID © Chevron 2007 Chemical EOR Implementation for the Captain Field, UK 30 th IEA EOR Symposium and Workshop September 2009 Anette Poulsen, Chevron.

Slides:



Advertisements
Similar presentations
Mariner – a project in the making 20 December
Advertisements

Predicting Future Gas Lift Performance in a Mature Water Flooded Field
DESIGNING A WATERFLOOD Designing a water flood involves both technical and economic consideration. Economic analysis are based on estimates of water.
Rejuvenation of a mature oil field: Underground Gas Storage and Enhanced Oil Recovery, Schönkirchen Tief Field, Austria IEA-EOR Conference 2009 Torsten.
Importance of Effective Sand Management - DTI View Colin Cranfield Reservoir Engineer Licensing & Consents Unit, Aberdeen.
Unlocking the potential from UKCS low deliverability reservoirs Colin Cranfield (DTI) Pete Naylor (ECL Technology)
Innovations in Reservoir Surveillance DTI Perspective on Reservoir Surveillance Colin Cranfield Reservoir Engineer Licensing and Consents Unit Aberdeen.
Outline of Presentation
SAND CLEANING STATFJORD C FIELD TEST Stavanger 18 – 19 January 2006 Henrik Dannström, MATOR AS.
Rising to the Deepwater Challenges:
Parliamentary Committee Presentation CNR International Presented by: Steve O’Reardon, General Manager September 2013.
Preformed Particle Gel (PPG) for Conformance Control
Kuwait Gulf Oil Company (K.S.C.) A Subsidiary of Kuwait Petroleum Corporation Enhancing Reservoir Performance and Production Capability of Divided Zone.
Technology Programme Competitions Oil and Gas Technologies.
The Business Value of Using Sensors Atul Arya, BP plc Presented at the 2008 IBM Almaden Institute.
Deepwater Improved Oil Recovery Can Technology Overcome Economics? Gavin Longmuir – Knowledge Reservoir Gulf of Mexico Deepwater Technical Symposium –
DESIGN AND IMPLEMENTATION OF A CO2 FLOOD UTILIZING ADVANCED RESERVOIR CHARACTERIZATION AND HORIZONTAL INJECTION WELLS IN A SHALLOW SHELF CARBONATE APPROACHING.
Downhole Oil/Water Separation Part of the Oil Industry’s Future
Classification: Internal Status: Draft WAG Mechanisms at macroscopic/ field level Presentation at FORCE WAG Seminar Stavanger, 18 Mar 2009 Anders Gjesdal.
Petroleum & Natural Gas Eng. Dept.
Hydro-Impact TM Stimulation Services Applied Seismic Research Corporation.
BrightWater® – A Step Change in Sweep Improvement
CHEMICAL EOR FIELD EXPERIENCE Oil Chem Technologies, Inc
OVERVIEW OF PETROLEUM ENGINEERING.
CO2 Enhanced Oil Recovery and Storage in Reservoirs
Injection of Gas and Improved Oil Recovery - the Norwegian Experience By Steinar Njå, Norwegian Petroleum Directorate.
Upstream solutions kazpetro technology ltd. Statement of Capability kazpetro technology ltd (Kazakhstan) delivers innovative exploration techniques, reservoir,
EOR: Promesa Incumplida o un Gran Futuro?
Research Perspectives: Maximizing Oil Recovery by IOR/EOR
Deepwater drilling challenges Gm, Drilling – murphy malaysia
Microgel Technology for Water Shutoff Applications Alain Zaitoun, Poweltec Guido Poggesi, REP WorkShop EOR, IAPG, Neuquen, 3-5 November 2010.
Williston Basin Petroleum Conference Advances in Technology Panel Efficient Fracture Stimulation Rick Ross – Whiting Petroleum Corporation 1.
National Geophysical Research Institute, Hyderabad.
UNFC–2009 – Purpose of Resource Classification David MacDonald Houston 21 November 2013.
07/ This document is the property of SNF. It must not be reproduced or transfered without prior consent Enhanced Oil Recovery Optimizing Molecular.
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
Classification: Internal Status: Draft Low Salinity Waterflooding: Opportunities and Challenges for Field Pilot Tests Dagmar Spangenberg, Peimao Zhang.
OIL RECOVERY MECHANISMS AND THE MATERIAL BALANCE EQUATION
Reserve Evaluation for Enhance Oil Recovery Purposes Using Dynamic Reserve Evaluation Model Woodside Research Facility GPO Box U 1987 Perth West Australia.
Improved Recovery Demonstration for Williston Basin Carbonates DE-FC22-93BC14984 Luff Exploration Company Mark Sippel, Consulting Engineer.
CBE 555: Chemical EngineeringConnections: Impact of Chemical Engineering on the Outside World Tertiary Oil Recovery Steve Ng Kim Hoong 16 October 2007.
Growth Management Legislative Discussion March 20, 2012.
Classification: Statoil internal Status: Draft
Reservoir Simulation Study
2003 ASME/API GAS-LIFT WORKSHOP Dual Gas Lift – EMEPMI Experience
Wytch Farm Field Development Project
Tom Beebe Project Manager
WP4: Assessing capacity for CO 2 storage in selected regions of China Jonathan Pearce 23 rd October 2008.
PACIFIC PARADYM ENERGY INC. Investor Presentation / Summer 2010.
Classification: Internal Status: Draft Gullfaks Village 2010 IOR Challenges.
Independent, integrated thinking.
Adel Sharif University of Surrey
FIELD SERVICE upstream solutions. statement of capability We deliver reservoir, well, and integrated field management services to the upstream oil and.
1 1 Presenter / date if required Independent, integrated thinking.
Waterflood Management Case Study - Goal  Change waterflood strategy early in waterflood to maximize recovery: 12 months of waterflood performance Predicted.
Schlumberger / Client Confidential
0 International Joint Study on CO2-EOR - Study on Applicability of CO2-EOR to Rang Dong Field, offshore Vietnam - Sunao Takagi, Komei Okatsu IEA Collaborative.
Lecture 11 Oilfield Development
GSE - Gas Storage Europe1 GSE Investment Workshop “ Physical specificities of gas storage” Brussels, 24 May 2007.
MarketsandMarkets Presents Global Specialty Oilfield Chemicals Market worth $10.9 Billion by 2016
IOR in the North Sea Average recovery around 45% Remaining 55% Half due to non swept volumesHalf due to residual oil saturation 1 % increase in oil recovery.
Occidental Oman Oman Economic forum
10/18/20161 Reserves Estimation and Classification.
© 2016 Global Market Insights. All Rights Reserved Mooring System Market Growth Trend & Forecast by Mooring System Market.
COREX Offshore Europe 2017.
Unconventional Reservoirs
”ZERO DISCHARGE” Opportunities and Challenges
New perspectives on ionic control of produced water and low sulphate seawater: Wettability insights from MFT Average water-wet fraction presented by Dan.
Presentation transcript:

DOC ID © Chevron 2007 Chemical EOR Implementation for the Captain Field, UK 30 th IEA EOR Symposium and Workshop September 2009 Anette Poulsen, Chevron Upstream Europe, Aberdeen, Scotland September 2009

Outline 1.Background 2.Project Definition 3.Strategy 4.Pilot Objectives and Deliverables

3 Location: Block 13/22a, UK North Sea. First Oil 1997: 12 years production history Current gross oil production: 40,000 bbls/ day. Equity: 85% 15% Captain Field Location

Captain Development Discovered 1977 Early development challenges Multiple platforms and over 300 vertical wells! Early 1990ies technology advances Horizontal drilling and ESP development Successful EWT – installed WPP & FPSO, first oil 2000 expansion project: BLP and subsea Area B template installed 2006 Captain Area C - further 2 subsea well development 4km east of Area B template Polymer injection facilities installed as part of original development

Captain Infrastructure

Captain Reservoir X-Section Upper Captain Sandstone : Sheet-like deepwater sandstone, Lower Captain Sandstone : Channelised deepwater sandstone, Ross/Burns Sandstone : Fluvial/ shallow marine sandstone.

Captain Waterflood Performance Volumetric sweep Injection water slumps down, under-running oil column Water cones up to producers from OWC or under-running water Significant hydrocarbon volumes by-passed Microscopic sweep Poor SCAL data (unconsolidated rock) Large uncertainty in ROS and Sorw

Outline 1.Background 2.Project Definition 3.Strategy 4.Pilot Objectives and Deliverables

Captain Long Term Development Project

Long Term Development Sub-Projects – Chemical EOR Positives Exceptionally high permeability Low temperature, moderate salinity Medium to high oil acidity Challenges Heavy/viscous oil High hardness (Ca, Mg ions in formation water) Offshore (impact on facilities, brown field modifications) Key Issues Incremental sweep Chemical compatibility and chemical performance Offshore space/weight/POB constraints Existing equipment suitability/conditions

Project Definition Opportunity Statement: To develop an integrated Chemical EOR Field and Reservoir strategy and timely implementation plans to increase ultimate recovery in order to develop P4– P6 resources into the proved developed reserves category. Success Vision: Economically implement chemical EOR in Captain to achieve at least 50% recovery factor in all reservoirs where chemical EOR will be applied

Impact on Life of Field

Outline 1.Background 2.Project Definition 3.Strategy 4.Pilot Objectives and Deliverables

EOR Strategy Evaluate suitable chemicals (polymer and ASP) for Captain Implement pilot polymer flood project using existing equipment on the Captain facilities Follow by ASP flood if viable Develop reliable forecasting tools and evaluate full field implementation Implement EOR scheme on Captain

Outline 1.Background 2.Project Definition 3.Strategy 4.Pilot Objectives and Deliverables

Pilot Objectives Demonstrate polymer flood technical feasibility in Captain field Early identification of potential showstoppers Provide data to evaluate economic viability for further expansion Reduce range on key uncertainties Meet above objectives within desired timeframe

Key Uncertainties Ability to ship, mix, filter and inject polymer offshore, in the North Sea Well injectivity Increase in sweep efficiency, oil cut and oil production rate Chemical usage Impact on production efficiency Operability of facility

Pilot Strategy Table

Project Milestones Injectivity test 2Q10 Polymer pilot results 2Q11 Expansion decision 3Q11 ASP pilot 4Q11 Commence field wide polymer (& ASP) flood 2015 Water injection baseline 4Q09

The Last Slide