Texas Commission on Environmental Quality Environmental Trade Fair & Conference May 5-6, 2015 Kellie Crouch-Elliott Phone: (512) 239-2435

Slides:



Advertisements
Similar presentations
Certification of Compliance By Evita Lagard
Advertisements

The Region of Halton Biosolids Management into the Future Regional Municipality of Halton Ontario, Canada.
Definition of Solid Waste Final Rule Public Meeting Charlotte Mooney Office of Resource Conservation and Recovery U.S. Environmental Protection Agency.
Livestock and the Environment Johanna Davis A.Agricultural Concerns Federal & State Environmental Laws Endangered Species Act.
Springs Protection Options Septic System Evaluation Program Board of County Commissioners Meeting November 13 th 2012.
Jeff Hutton Permit Section, Division Of Water Pollution Control
1 Land Application of Wastewater Sludge Susan A. Murphy – Kansas City, MO Jeff Waszgis – Crete, NE Alan Ygsi – Denison, IA.
“Fertilizer Strategies to Conserve Energy on the Farm” Southern Maryland Crops Conference Waldorf, MD December 8, 2006 R. David Myers Extension Educator.
Kara Denney Industrial Wastewater Permit Writer Water Quality Division.
Water Quality Division Updates David W. Galindo, Director.
1 CITY OF LOS ANGELES BIOSOLIDS MANAGEMENT PROGRAM IN KERN COUNTY, CALIFORNIA LEA/CIWMB ANNUAL CONFERENCE AUGUST 1-3, 2006 MONTEREY, CA Diane Gilbert Jones.
Susan Palachek TCEQ Pollution Prevention & Education.
Biosolids Regulatory Compliance 2004 Joint RMSAWWA/RMWEA Annual Conference September 12-15, 2004 Wesley Carr, Environmental Protection Specialist CDPHE/WQCD.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Medical Waste Management Rulemaking Open Participation Meeting Texas Commission on Environmental Quality Waste Permits Division August 18, 2015, Austin.
Waste Management Overview & Land Disposal Restrictions.
1 2 nd Informal Workshops on Draft Revisions to the Disposal Reporting System Regulations June 24, Diamond Bar June 26, Sacramento.
TURNING BROWNFIELDS. Definition US EPA 1997 abandoned, idled or under-used industrial and commercial facilities where expansion or redevelopment is complicated.
David Dippel, P.G. Frank Zeng, P.E. Waste Permits Division Municipal Solid Waste Permits Section 2015 TCEQ Environmental Trade Fair.
Notice of Intent to Operate Municipal Solid Waste (MSW) Facilities Tamara A. Young Environmental Permit Specialist Waste Permits Division 2015 TCEQ Environmental.
Field Specific Decisions: N vs P CNMP Core Curriculum Section 5 – Nutrient Management.
Proposed Amendments to Chapter 32 Article V Solid Waste Management and Chapter 38 Zoning 5:01 P.M. Public Hearing Presented by the Orange County Environmental.
MORRIS MILL PROPOSED URBAN SERVICES DISTRICT Presentation to County Council September 17, 2013.
Record Keeping CNMP Core Curriculum Section 7— Record Keeping.
Residuals Management in Florida George A. O’Connor Soil and Water Science Department FIPA Winter Workshop February 16, 2007.
Environmental Regulations. Learning Objectives TLW understand the history of environmental regulations TLW be able to describe key content of environmental.
Jae K. (Jim) Park, Professor Dept. of Civil and Environmental Engineering University of Wisconsin-Madison 1.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
BIOSOLIDS USE AND REGULATION IN PENNSYLVANIA PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION.
Changes to Contested Case Hearing Requirements and Procedures Janis Hudson Environmental Law Division Texas Commission on Environmental Quality Advanced.
Grant County Zoning Ordinance Review Public Comment Forum Todd Kays:Executive Director – 1 st District Association of Local Governments.
Texas Surface Water Quality Standards Update Joe Martin Water Quality Standards Work Leader Joe Martin Water Quality Standards Work Leader.
Disposal and Treatment of Biosolids John Scott Meschke Office: Suite 249N, 4225 Roosevelt Phone:
West Pinal PM 10 Nonattainment Area Construction Dust Rule DECEMBER 9, 2015 JOSH DEZEEUW ENVIRONMENTAL PROGRAM MANAGER 1.
Nutrient Management Summary CNMP Core Curriculum Section 5 – Nutrient Management.
MICHAEL E. SCOTT, DEPUTY DIRECTOR DIVISION OF WASTE MANAGEMENT Available Information on the Beneficial Reuse of Coal Combustion Products 1.
Manure Management and Water Quality By Jeff Lorimor, Iowa State University, Ames 32-1.
Balancing the Three R’s: Regulations, Records, and Reports Dallas, TX ♦ May 18, 2016 Arron Heinerikson.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
Gulay Aki, P.E. Mario Perez Municipal Solid Waste Permits Section Texas Commission on Environmental Quality Trade Fair 2016 Medical Waste Management in.
Texas Surface Water Quality Standards Update Joe Martin Water Quality Standards Work Leader Joe Martin Water Quality Standards Work Leader.
HB 2031 and HB 4097: Marine Seawater Desalination Rulemaking Trade Fair / May 2016 Office of Water Water Availability Division Water Quality Division.
Water Quality/Stormwater Seminar September House Bill 2031 Requires TCEQ to adopt an expedited permitting process for discharge permits for treated.
30 Texas Administrative Code Chapter 210, Subchapter E Presented by Kara Denney September 23, 2015.
Integrated Watershed Management
Environmental Quality Board
Department of Environmental Quality
Department of Environmental Quality
State of Texas Biosolids Program Perspectives
Topics BMP Recommendations Direct Conduit Recommendations
2017 Environmental Trade Fair Shannon Gibson
Water Quality Division Updates
Chapter 15 Organic Amendments.
Georgia Update Jeff Cown Land Protection Branch
2018 Stormwater Construction General Permit (CGP) Renewal TXR150000
Groundwater and Waste Management Committee November 9, 2016
Julie Woosley, Division of Waste Management
Julie Woosley, Division of Waste Management
Waste Minimization & Sludge Handling
Julie Woosley, Division of Waste Management
Wastewater Permitting Updates
Water Quality Planning Division Monitoring & Assessment Section
2018 Environmental Trade Fair Shannon Gibson
TCEQ Environmental Trade Fair Water Quality Division
Chapter 312 Rule Revisions
Wastewater Permitting Updates
Water Quality Planning Division Monitoring & Assessment Section
State of Texas Biosolids Program Perspectives
2019 Environmental Trade Fair & Conference Monica Vallin-Baez
Wastewater Permitting Updates
Presentation transcript:

Texas Commission on Environmental Quality Environmental Trade Fair & Conference May 5-6, 2015 Kellie Crouch-Elliott Phone: (512)

THE SLUDGE SHOW! TCEQ SLUDGE AUTHORIZATION PROCEDURES

Types of Authorizations Recent Rulemaking, Rule Changes Application Process Highlights Frequently Asked Questions

Sludge Program Rules Federal Rules: Established 1993 – Title 40 Code of Federal Regulations (CFR) Part 503 and Part 257 State Rule: Established 1995 – Title 30 Texas Administrative Code (TAC) Chapter 312. Updated in 2005 due to legislation and in 2014 due to rulemaking

Source of nutrients for plant growth Saves money from using chemical fertilizers Lowers cost of disposal for utilities Lowers amount of material disposed in landfills Processing to higher standards to develop a product for distribution and sale

Individual Permits Beneficial Land Application of Class B Sewage Sludge, or Beneficial Land Use (BLU) – State Only Operation of a Sludge Disposal Site - TPDES Processing of Sewage Sludge Material- TPDES

Processing Permits Dewatering Lime Stabilization Composting with Green Waste Heat Pelletizing Mobile Processing Unit

Registrations Water Treatment Plant Sludge Domestic Septage Notification Authorization Marketing and Distribution of Class A Sewage Sludge

Sludge Permits & Registrations in Texas Class B Land Application Permits – 49 Sludge Disposal Permits – 6 Sludge Processing Permits – 10 Domestic Septage Land Application Registrations – 50 Water Treatment Plant Sludge Land Application Registrations – 140 Class A Marketing/ Distribution Authorizations – 29

Recent Rulemaking Rule Petition - Bulk Sewage Sludge June 18, 2013 Commissioners Agenda – Initiate a rulemaking proceeding to address nuisance odors at bulk sewage sludge land application sites 2013 – Stakeholder meetings 2014 – Proposed rules published in Texas Register, public hearing held

Recent Rulemaking September 10, 2014 Commissioners Agenda – TCEQ Executive Director recommends adoption of revised Chapter 312 rules Rule adopted October 2, 2014

Recent Rulemaking Establish a new sewage sludge classification structure with corresponding requirements based on pathogen treatment processes  Class A  Class AB  Class B

Classifications of Sewage Sludge Class A – Exceptional Quality Pathogen Requirements 30 TAC Chapter (a) Fecal Coliform <1,000 MPN per gram of total solids or Density of Salmonella <3 MPN per 4 grams of total solids Alternative 1 - Time and Temperature

Classifications of Sewage Sludge Class A – Exceptional Quality Pathogen Requirements 30 TAC Chapter (a) Alternative 5 – Process to Further Reduce Pathogens (PFRP) –Composting –Heat Drying –Heat Treatment –Thermophilic aerobic digestion –Pasteurization Alternative 6 – Equivalent to PFRP with EPA approval

Classifications of Sewage Sludge Class AB - Exceptional Quality Pathogen Requirements 30 TAC Chapter (a) Fecal Coliform <1,000 MPN per gram of total solids or Density of Salmonella <3 MPN per 4 grams of total solids Alternative 2 - High pH, high temperature and time

Classifications of Sewage Sludge Class AB - Exceptional Quality Pathogen Requirements 30 TAC Chapter (a) Alternative 3 - Concentrations of enteric viruses and viable helminth ova – known process Alternative 4 - Concentrations of enteric viruses and viable helminth ova – unknown process

Classifications of Sewage Sludge Class B Pathogen Requirements 30 TAC Chapter (b) Fecal Coliform < 2,000,000 MPN per gram of total solids Process to Significantly Reduce Pathogens (PSRP) -Aerobic Digestion -Anaerobic Digestion -Air Drying -Composting -Lime Stabilization Site Restrictions

Classifications of Sewage Sludge Class B Pathogen Requirements 30 TAC Chapter (b) Certain Site Restrictions Harvesting Times Limited Public Access animals only allowed to graze 30 days after land application

Site Restrictions – Buffer Zones Protect Water Resources Surface Water – 200 feet if sludge not incorporated into soil Surface Water – 33 feet of vegetated buffer zone if sludge is incorporated into soil

Site Restrictions – Buffer Zones Protect Water Resources

Private Water Supply Well – 150 feet Public Water Supply Well, Intakes, Springs, Treatment Plants, or Storage Tanks – 500 feet Solution Channel, Sinkhole, or other Conduit to Groundwater – 200 feet Irrigation Conveyance Canal – 10 feet

Site Restrictions – Buffer Zones Minimizing Nuisance Odors Established school, institution, business, or occupied residential structure – 750 feet Public Right-of-Way and Property Boundaries – 50 feet

Core Requirements – Class A, AB, and B sewage sludge Clarify TCEQ authority to add more stringent requirements, such as an Odor Investigation and Control Plan Prohibit land application during rain or on saturated soils

Core Requirements – Class A, AB, and B sewage sludge Require cover on trucks Nuisance condition prohibition Submittal of an Adverse Weather and Alternative Plan

Additional Requirements for Class AB and B sewage sludge Post signage at application sites Buffer zones to odor receptors Staging of sludge away from odor receptors Best Management Practices to address tracking sludge off-site

Sewage Sludge Vector Attraction Reduction Methods 30 TAC Chapter (a) & (b) 38% Volatile Solids Reduction Specific Oxygen Uptake Rate (SOUR) Test – aerobic process only pH >12 for 2 hours and remain at pH 11.5 or higher for 22 hours

Sewage Sludge Vector Attraction Reduction Methods 30 TAC Chapter (a) & (b) ≥ 75% solids content (does not contain unstabilized sludge) ≥ 90% solids content (contains unstabilized solids) Injection below land surface within 1 hour Incorporation into soil within 6 hours

Sludge & Soils Laboratory Analysis Sludge/Septage Application Rate Calculations Maps

Sewage Sludge and Water Treatment Plant (WTP) Sludge BLU Requirements – Lab Analysis Total Metals in mg/kg (or parts per million), dry weight Nutrient Concentrations in percentage, dry weight Toxicity Characteristic Leaching Procedure (TCLP) Analysis Polychlorinated Biphenyls (PCBs)

Soil Testing Requirements Metals and Nutrients of the Soil: Metals Limits (mg/kg) in soil: ArsenicMercury CadmiumMolybdenum ChromiumNickel CopperSelenium LeadZinc Nutrients: Total Kjeldahl NitrogenSodium Ammonium NitrogenMagnesium Nitrate NitrogenCalcium PhosphorusElectrical Conductivity PotassiumpH

10-15 random sample cores per 80 acres, collected at two depths (0-6 & 6-24 inch depth) samples make up one composite sample for each soil depth per 80 acres and per uniform soil type within the 80 acres

Uniform soil type – Soils with same characteristics & textures Soils lab analysis report should reference soil type and depth Instructions found in Appendix B of the application

Calculating Sludge and Domestic Septage Application Rates Beneficial Land Use (BLU) – Growing a crop/vegetation using nutrients from sludge Sewage Sludge and WTP Sludge – Sludge Application Rate Calculation is measured in dry tons/acre/year in which site can maintain growth of intended crop Domestic Septage – Septage application rate is measured in gallons/acre/year

Calculating Sludge and Domestic Septage Application Rates Sewage Sludge and WTP Sludge – Consider metals and nutrients in the sludge & nutrients in the soils Domestic Septage – Consider only the nutrients in the soils

WTP Sludge – Pathogen and Vector Attraction Reduction not a concern Domestic Septage – Meet Pathogen & Vector Attraction Reduction Requirements with Lime Stabilization Maintain pH of > 12 for at least 30 minutes

Hydrologic Characteristics Aquifer Identification Periods of Perched or High Water Table Distinguish connections between surface and subsurface water

Nutrient Management Plan Proof that the risk of water quality impairment caused by nitrogen applied to the site is minimized (312.11(d)) Certified by a Nutrient Management Specialist Insurance Environmental Impairment Commercial Liability

Quarterly Reporting due the 15 th of March, June, September and December Amount of sludge delivered and land applied from each sludge source Cumulative metal loading Proof of Insurance Posted on TCEQ website for public viewing

General County Highway Map USGS Topographic Map Federal Emergency Management Agency (FEMA) Map USDA, Natural Resource Conservation Service (NRCS) Soils Map

Used to indicate location of site Include road/highway names & numbers Original Map

Location of the site – Property boundaries Zones Map Key

Soil Symbols Boundaries of Site Locations where soil samples collected (marked by “Xs” or dots)

How long will it take to receive a signed permit or registration? What are the fees for applying for a permit or registration? What are the notice requirements for the application process?

Fee Anticipated quantity of sludge land applied in one year $1,000 2,000 dry tons or less $2,000 >2,000 dry tons but <5,000 dry tons $3,000 >5,000 dry tons but <10,000 dry tons $4,000 >10,000 dry tons but <20,000 dry tons $5,000 >20,000 dry tons

2 Published Public Notices Notice to landowners –within ¼ mile of the boundary of land application site Opportunity for Public Meeting and Contested Case Hearing

2 Public Notices (Published) Notice to Landowners -within ½ mile of the boundary of disposal site -adjacent landowners of processing site Opportunity for Public Meeting and Contested Case Hearing Application Fee: New = $150 Renewal = $115

Domestic Septage BLU New / Major Amendment - One public notice is mailed to adjacent landowners and application is placed at County Judge’s office for viewing Renewal / Minor Amendment- No notice requirement Water Treatment Plant BLU and Class A Marketing and Distribution No public notice requirements No application fee for all of the above

What do I do if I wish to add a source of sludge to my land application site? When should I submit my annual report? What should be included with my annual report?

Due September 30 th - Reporting timeframe from September 1 st of previous year through August 31 st of current year Summary Sheet is Appendix C of permit/registration Amount of sludge/septage land applied Acreage used for land application Type of vegetation and frequency of harvesting Annual soils analysis

$100 minimum fee plus: $1.25 / dry ton for sludge disposal activity $0.75 / dry ton for Class B BLU $0.20 / dry ton for Water Treatment Plant BLU $100 flat fee for all Domestic Septage BLU Sludge Processing and Class A Marketing / Distribution do not have an annual fee

TCEQ Water Quality Division Wastewater Permitting Section, Municipal Permits Team Bijaya Chalise Kellie Crouch-Elliott Brian Sierant Austin Office: