KVN Current Status of Daejeon Correlator for EAVN Se-Jin Oh and staff of Correlator team of KASI/NAOJ 8 th East Asian VLBI Workshop, 8~10 July

Slides:



Advertisements
Similar presentations
E-VLBI down-under Tasso Tzioumis ATNF, CSIRO July 2005 Towards e-VLBI.
Advertisements

1/1/ / faculty of Electrical Engineering eindhoven university of technology Architectures of Digital Information Systems Part 1: Interrupts and DMA dr.ir.
The CVN Real Time Correlator Zhang Xiuzhong, Chen Zhong Shanghai Astronomical Observatory China 4th e-VLBI Workshop Sydney
KVN Recent Progress of Daejeon Correlator Se-Jin Oh Duk-Gyoo Roh, Jae-Hwam Yeom, ChungSik Oh, Jinseung Jung, Dong-Kyu Jung, Youngjoo Yun, A. Miyazaki,
Cloud Computing Resource provisioning Keke Chen. Outline  For Web applications statistical Learning and automatic control for datacenters  For data.
East Coast Geodetic VLBI Workshop12011 Feb ~ 2.2 – 15 GHz Spanned RF Bandwidth OLD Phase Frequency (GHz) 142 Observing Frequency Bands.
Japanese VLBI programs, East Asian VLBI Network and Space VLBI;VSOP-2 H.Kobayashi(NAOJ) 2011, Jan., 27 Future of VLBA.
Asynchronous Input Example Program counter normally increments, jumps to address of interrupt subroutine on asynchronous interrupt How many states can.
Prototype SKA Technologies at Molonglo: 3. Beamformer and Correlator J.D. Bunton Telecommunications and Industrial Physics, CSIRO. Australia. Correlator.
Ch 23 1 Based on Data Communications and Networking, 4th Edition. by Behrouz A. Forouzan, McGraw-Hill Companies, Inc., 2007 Ameera Almasoud.
VieVS User Workshop 7 – 9 September, 2010 Vienna Creating OPT-files Detecting and solving problems Tobias Nilsson.
Ongoing e-VLBI Developments with K5 VLBI System Hiroshi Takeuchi, Tetsuro Kondo, Yasuhiro Koyama, and Moritaka Kimura Kashima Space Research Center/NICT.
VSOP-2 Ground Link Station - Tracking Station Requirements - National Astronomical Observatory of Japan Y. Kono.
Current LBA Developments Chris Phillips CSIRO ATNF 13/7/2005.
VLBI in Africa Michael Bietenholz Hartebeesthoek Radio Observatory.
ASKAP Signal Processing Overview DIFX Users and Developers Meeting
KVN RAS in KOREA Current status. RAFCAP 7 th meeting, Tokyo, 5 June, 2010 Final Goals for Freedom Challenge and Change - Domestic and International Activities.
Basic concepts of radio interferometric (VLBI) observations Hiroshi Imai Department of Physics and Astronomy Graduate School of Science and Engineering.
DBBC Stutus Report November 2007 G. Tuccari, W. Alef, S. Buttaccio, G. Nicotra, M. Wunderlich.
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
New correlator MicroPARSEC Igor Surkis, Vladimir Zimovsky, Violetta Shantyr, Alexey Melnikov Institute of Applied Astronomy Russian Academy of Science.
LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.
Update on LBA Technical Developments CASS Chris Phillips 11 October 2013.
Kondo, T. *1*2 and T. Hobiger *2 Kondo, T. *1*2.
1 William Stallings Data and Computer Communications 7 th Edition Chapter 8 Multiplexing.
Closing Remarks Mar , 2009 LG Convention Hall, Ewha Womans Univ.
1 Gbps Disk-Based VLBI Observation for Future East Asia VLBI Observations Kiyoaki Wajima 18 March 2009 동아시아 VLBI 워크샵 Yamaguchi University Introduction.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
Possible Engineering Support for Dual Polarization and Ultra Wide Band Observation with EAVN N. Kawaguchi National Astronomical Observatory East Asia VLBI.
The Progress Report for KVN Construction Seog-Tae Han and KVN staffs Korea Astronomy and Space Science Institute March18 th 2009.
ISAS/JAXA Tracking station. Usuda Deep Space Center Diameter 10m –AE 44% expected Feed & Receiver –Ka-band Trx < 50K expected –cooled LNA –Tsys 140 K.
Status and future of East Asia VLBI network H.Kobayashi(NAOJ) East Asia VLBI
DiFX Performance Testing Chris Phillips eVLBI Project Scientist 25 June 2009.
EVLA Correlator Prototype and OTS Testing B. Carlson EVLA Correlator S/W F2F Apr 3-4, 2006.
ALMA Science WorkshopMay 14, 2004 Present and Future Thomas W. Folkers Arizona Radio Observatory.
Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Correlator.
The ALMA Phasing Project (APP) APP is an ongoing ALMA Development Project (approved in 2012) to provide the hardware and software necessary to coherently.
Back-end overview (both analog and digital) for VLBI2010 East Coast Geodetic VLBI Meeting Feb, 2011, Haystack Observatory Bill Petrachenko.
Multi-frequency Phase Referencing VLBI Observation - Phase Referenced Image - Tae Hyun Jung, Bong Won Sohn, Hideyuki Kobayashi, Tetsuo Sasao, Tomoya Hirota,
VLBA Implementation of the ROACH Digital Backend Jonathan Romney on behalf of the VLBA Upgrade development team NRAO / Socorro First International VLBI.
Giga-bit Geodesy e-VLBI at 22GHz Hiroshi Takaba Gifu University, Japan.
Demonstration of 16Gbps/station broadband-RF VLBI system Alan Whitney for the VLBI2010 development team MIT Haystack Observatory 22 October st Intl.
1024-MHz vs 512-MHz Bands for VLBI2010? East Coast VLBI Meeting Feb , 2011, Haystack Observatory Bill Petrachenko.
The Green Bank Telescope Frank Ghigo, National Radio Astronomy Observatory 7 th US VLBI Technical Meeting, Haystack, Nov 2009.
M.P. RupenCorrelator Connectivity Scheme Review 31 July Correlator Specifications Michael P. Rupen.
A. Gheata, ALICE offline week March 09 Status of the analysis framework.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
Possible eVLBI connection between Eastern Asian Observatories Noriyuki KAWAGUCHI National Astronomical Observatory, Japan eVLBI Workshop
DiFX at KASI Jongsoo Kim and Taehyun Jung Korea Astronomy and Space Science Institute
EVN Performance and Reliability Iván Agudo. Collection of Highlights A large improvement of the EVN in terms of new stations & sensitivity! First fringes.
3rd International VLBI Technology Workshop November Groningen/Dwingeloo, The Netherlands DSCC VLBI PROCESSOR (DVP) J.E. Clark 1, C. García-Miró.
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
UniBoard Progress Meeting, December 2009 Jonathan Hargreaves, JIVE EVN Correlator Design UniBoard Progress Meeting, December 2009 Contract no
Planning for the ATA David DeBoer OWG AOC March 13, 2006.
VLBI Developments in Australia ASTRONOMY AND SPACE SCIENCE Chris Phillips| LBA Lead Scientist 11 November 2014.
About JVN about JVN Status Status Results Results Future plans Future plans Japanese VLBI Network (JVN): recent results and future plans for EAVN Kenta.
1 Date Uniboard Application for Korean VLBI Network (KVN) Jae-Hwan Yeom, MiYoung Jung & Bong Won Sohn.
ALMA Integrated Computing Team Coordination & Planning Meeting #3 Socorro, June 2014 Observation with ACA correlator for Cycle3 Manabu Watanabe NAOJ.
J.Maalmi, D.Breton – SuperB Workshop – Frascati – September 2010 Electronics for the two-bar test. D.Breton & J.Maalmi (LAL Orsay)
The East-Asian VLBI Network: Synergy between FAST and EAVN W AJIMA, Kiyoaki ( 輪島 清昭, KASI) (on behalf of the EAVN Tiger Team) 2015 年 7 月 31 日 FAST 早期科学国际研讨会.
VGOS GPU Based Software Correlator Design Igor Surkis, Voytsekh Ken, Vladimir Mishin, Nadezhda Mishina, Yana Kurdubova, Violet Shantyr, Vladimir Zimovsky.
AOC Report – KVN VLBIKVN KSP KaVASystem TestEVN Total Failed-Observation 3.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
ALMA Cycle 5 Hiroshi Nagai (NAOJ).
Rick Perley National Radio Astronomy Observatory
Simultaneous Multi-Frequency Obs. -Phase Compensation, mm-VLBI
Correlator Growth Path
DBBC Stutus Report November 2007
Presentation transcript:

KVN Current Status of Daejeon Correlator for EAVN Se-Jin Oh and staff of Correlator team of KASI/NAOJ 8 th East Asian VLBI Workshop, 8~10 July Japan

Contents  KJCC correlation status  Problem, Solving Status  Recent Activities  Future Work

KJCC webpage

Correlation Status in KJCC web

Correlation Status SeasonObservation Corr Finished Remain Corr FITS release 2015A B30(2 Geodesy) A 56 (1 cancelled, 1 test) 515 The correlation is now conducted normally.

Average Correlation Time  Media delivery time  KJCC to each VERA site, it took 4 or 5 days  Each VERA site to KJCC, it took almost 2 weeks or 16 days  Media staying time in KJCC  OCTADISK pack is staying in KJCC average 40days or longer. VERA AOC often requested to us more fast returning due to lack of media. Sometimes VERA used their own diskpack for KaVA obs.  Average correlation time  1 correlation per day is general. Sometimes 2 correlations are conducted.

Problem, Solving Status 44GHz SgrA* (PI: Akiyama) - No large jump & bridge pattern were shown - we found two layer pattern which already known as Lee-san, Sawada-pattern zoomed up  As reported last KaVA science workshop, two-layer(double-layer) pattern was remained in correlation result. After investigation in VCS seriously, we found the reason why double-layer occurs. That is memory reading point error in VCS data input part.  We solved this problem, the distributed FITS is fixed after 13 th March, 2015.

Test Result(Before, After) Before After

Recent Activities  C4 mode  2Gbps test correlation  EAVN correlation

C4 mode  32MHz BW x 8 IFs  2014 vs  VERA Digital Filter setting is fixed

2Gbps test correlation  512MHz BW x 1 IF  KVN only test observation  2Gbps test observation will be regularly performed KJCC DiFX ch output 4096ch output

8 th EAVN X-band correlation test( )  Obs date :  Participant stations : KUS, TSU, YAM, SHA, KUN (5 stations)  Frequency : X, K-band  Obs band : 256MHz(16MHz x 16IF, 1Gbps)  Sources : 3C454.3, BLLac  Data collection : through FTP for 1min obs data.  Correlation : KJCC except YAM, due to cable error for standard clock.

 Frequency setup : channel allocations are different between KUS, TSU and SHA, KUN  Stations Position & Delay XYZDelay(μs) KUS TSU SHA (A) (B) KUN KUS, TSUSHA, KUN ChannelFrequencySidebandPolarizationChannelFrequencySidebandPolarization CH LRCP CH LRCP CH URCP CH URCP CH LRCP CH LRCP CH URCP CH URCP CH LRCP CH LRCP CH URCP CH URCP CH LRCP CH LRCP CH URCP CH URCP CH LRCP CH LRCP CH URCP CH URCP CH LRCP CH LRCP CH URCP CH URCP CH LRCP CH LRCP CH URCP CH URCP CH LRCP CH LRCP CH URCP CH URCP

( ) : 3C454.3 (04h40m ~ 04h41m) KUS-TSU KUS-KUN TSU-KUN KUS-SHA TSU-SHA SHA-KUN Correlation Result (A) By using old station positions(A), fringe was not detected in Shanghai(Shesen) baseline.

KUS-TSU KUS-KUN TSU-KUN KUS-SHA TSU-SHA SHA-KUN KUS-TSU KUS-KUN TSU-KUN KUS-SHA TSU-SHA SHA-KUN BL Lac (04h10m ~ 04h11m)3C454.3 (04h40m ~ 04h41m) Correlation Result (B) by changing station position

Consideration  In phase on SHA, KUN baselines,  We considering that the IF channel allocation of CDAS is different from that of KVN and JVN DAS, therefore we should fully understand the IF channel allocation of each stations.  To do for EAVN observation  Fully understand each Backend system.  Adjust observation log for each station like clock, scans, weather information etc.

VDIF Data Transfer Software Development  Need data transfer method between HCDS(Huge Capacity Data Server) and RVDB(Raw VLBI Data Buffer).  Propose direct data transfer method from RVDB to HCDS  Proposed method performs data transfer by accessing data storage(OCTDISK, OCTADDB) of RVDB directly without pass through data input/output module(OCTAVIA)

Future Work  4/8Gbps test correlation  CODA/FITS generation SW modification for Fast switching  New Data Archive for Correlator output saving in 2016  Develop SW for making direct Correlator output to FITS file  Dual polarization correlation support