PSS/E Version 33 Dynamic Conversion

Slides:



Advertisements
Similar presentations
Sequence Data, Power Flow & Transient Stability (PF & TS) MSRATF - July 10, 2013 Joe Seabrook.
Advertisements

1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
CUG Meeting June 3 – 5 Salt Lake City, UT
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
Paperless Online Payroll, Integrated HR & Report Generating System.
Resource Data Needed For Dynamic Simulations
Carol Chessmore Oncor 2013 DWG Vice Chair 2014 DWG Chair - Pending ROS Approval January 9, 2014 ERCOT ROS Meeting Austin, TX.
Zonal ADR Resettlement & Data Retention ERCOT CSWG 04/20/2015.
NERC LTRA Update / CDR Capacity Counting Issues
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
Synchrophasor Measurement Implementation in ERCOT
Texas Regional Entity Compliance Report TAC July 9, 2009.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
April 23 rd OWG UFLS Survey & Power Factor Review.
Copyright © 2013, ESC | Environmental Systems Corporation Understanding ProcessNow Mark Astudillo Director of Training.
2015 RTP – Study Scope of Short Circuit Analysis RPG Meeting May 19,
Lead from the front Texas Nodal 1 Resource Entity Owned Transmission Asset Data Collection Feb 27, 2009 Kick Off Meeting.
MP Online Data Entry Project Update WMS / ROS August 2013 Troy Anderson.
RARF Frequently Asked Questions from Resource Entities Ed Geer RARF Workshop III 8/29/2013.
SunGuide® Software Development Project Release 4.3 Express Lanes Enhancements Design Review December 15, 2009 December 15, 20091R4.3 Design Review.
Lead from the front Texas Nodal 1 Registration Market Call Apr 10, 2009.
1 Presented to ERCOT Retail Market Subcommittee January 9, 2002 Profiling Working Group Darryl Nelson, Chair Load Profiling Operating Guides (LPOG)
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Ordering Tool Guideline
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
EMS User’s Group Presented By Margaret Goodrich Project Consultants, LLC Presented to EMS User’s Group Austin, TX September.
SPWG SHORT CIRCUIT CASE BUILDING AND DEVELOPMENT July 17, 2014 Qiuli Yu and Jay Teixeira ERCOT.
Problem Areas Updates Penalties FRCC Compliance Workshop September / October
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window Aug 14, 2009.
DS2 – Grid Integration Dynamic Modelling of Wind Generation in Ireland
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
1 Submitting a RARF Art Deller, P.E. Supervisor, Model Administration New Generation Workshop November 4, 2014.
By Tony Hudson SSWG Chairman.  12DSA cases were recently completed per the procedures approved by ROS in March  The purpose of this presentation.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
Resource Parameters Needed for LFC NATF WebEx Meeting 05/11/2010 Dave Maggio Operations Engineer, Supply Integration and Grid Applications.
TX SET Update to RMS Wednesday, November 7, 2007.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
NDSWG Report June 16, NDSWG Report Regular meeting held May 16 in Taylor Telemetry / State Estimator Update Naming Convention Electrical Bus Designation.
ERCOT Guideline for Interim Updates to the Network Operations Model Excerpted from the “Modeling Expectations” whitepaper D.W. Rickerson.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
1 ERCOT Retail Release Overview. 2 How Are Changes Managed? Retail Testing Business Teams Development Teams Release Management Management of: Migration.
ERCOT ROS Planning Working Group (PLWG) Scope Approved at ROS Meeting.
DWG Procedural Manual: Wind Model Requirements DWG Request to ROS August 11, 2006.
ROS July 10, 2008 Meeting WOTF Update on ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008) Mark Garrott WOTF Chair.
Scheduling and Operating Transmission Devices in the Nodal Environment.
Nodal Planning Model Process and Data Set A case use June 28, 2010 Planning Working Group.
Chapter – 8 Software Tools.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
Status Update to ROS: Using NMMS for Building SSWG Cases Wes Woitt CenterPoint Energy 2010 SSWG Chair.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 05, 2009.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Voltage Control Brad Calhoun Consultant, Sr. Trainer Spring 2016.
Impact of not including proposed generators lacking RARF data in the planning models Planning Guide Section 6.9 Issues February 17, 2016.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Power System Protective Relaying-Part One
RELIABILITY AND OPERATIONS SUBCOMMITTEE Report to TAC Austin, TX December 1, 2011 Kenneth A. Donohoo, P.E. Chairperson Oncor Electric Delivery Company.
Texas Nodal Electrical Buses and Outage Scheduling.
ERCOT SYSTEM PLANNING Dynamic Model Data Management.
Nodal Planning Go Live Austin, TX February 3, 2011
NERC Published Lessons Learned Summary
PLWG Review 6.9 and the Interconnection process
PSS®E Update for WECC Good morning, welcome to psse presentation for the UGM I’m glenn pietrow, PSSE product manager and GUI developer Currently manage.
Power System Protective Relaying-Part One
PSS®E Update for WECC Good morning, welcome to psse presentation for the UGM I’m glenn pietrow, PSSE product manager and GUI developer Currently manage.
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Presentation transcript:

PSS/E Version 33 Dynamic Conversion DWG ROS June Meeting June 5, 2014 ERCOT Met Center Austin, TX

Advantages of v33 Generic Program Enhancements Windows 7 Compatibility - V33.1 has been tested extensively on Windows 7 and is certified as Windows 7 compatible. Updates to Environment Manager to better handle Python and compiler issues. Updated Aspen to PSS/E converter.

Improvements Related to Dynamic Studies Improved Dynamic Engine Increased the number of CONs, VARs and ICONs at all size levels above 12,000 buses. Helpful when adding load models to the case All CONEC and CONET models have been “Table-ized”. Improved handling of compilation of User Defined Models Improved Data Entry via GUI Copy/Paste of Models on the Dynamics Spreadsheet Improved Data Checking Interactive Data Checking Data warnings/error can now be visualized directly on the spreadsheets and model edit dialogs. The feature is enabled/disabled on the “General” tab of the Edit>Preferences dialog. Updated exciter limit calculation (removed iteration with closed form calculation) for AC7B, AC8B, ESAC3A and EXAC2 models. Power Flow and Sequence Data Checking Report Two new APIs, CHECK_POWERFLOW_DATA and CHECK_SEQUENCE_DATA, can be used to create a tabular report of the checks performed on the Power Flow and Sequence data by the interactive data checking function. Sequence data is used in fault calculations More support for Node Breaker Modeling Has a breaker tab There is a factor of 10 increase in the maximum number of zero impedance lines allowed at all size levels. For example, at 50,000 buses, the maximum number of zero impedance lines is increased from 2,500 to 25,000. Easier to handle an expansion of the Node Breaker Model New Solution Parameter, MXTPSS MXTPSS may be used to overcome the oscillations that can occur in the automatic adjustments of tap ratio and switched shunt settings during power flow solutions. Once tap and/or switched shunts have been adjusted MXTPSS times during a solution, further adjustments are suppressed Load Model Improvements Each load may be characterized as either interruptible or non-interruptible. This attribute will be utilized in a future PSS®E release. Native Induction Machine Model A native induction machine model is now in use throughout the PSS®E engine. In the RAW file the induction machine data now appears at the end of the file

New Models ABBSVC1 – ABB SVC model used in DFW and the CREZ WT4G2– Generic wind turbine model representing a generator connected to the grid via a power converter (Type – 4 wind machine) WT4E2 – Generic electrical control model for Type 4 wind machine VFT1 – GE variable frequency transformer SVSMO (SVSMO1, SVSMO2 and SVSMO3) family of FACTs models. GENTPJU1 - Synchronous generator model HVDCPLU1 - Siemens HVDC plus model HYGOVRU – A Hydro-governor model TSTGOV1 – A frequency playback model. This model is used to measure machine response against a measured frequency input as gathered from field measurements or defined frequency inputs as found in a Grid Code.

Why UDMs Are Important Allows for modeling of new types of equipment FACTs devices Wind Solar Improved accuracy of models Historically there have been problems with generic models accurately modeling wind farm performance Wind Farm User Defined models were created to overcome this deficiency WECC has been working on improving Wind Farm Generic Models Resource owner needs to submit accurate model parameters Default parameters may or may not model a wind farm correctly Models taken from a wind farm of the same type may or may not model a wind farm correctly Market Fairness Expensive to get a recompile of UDM If one generator has to pay to recompile, then all need to pay to recompile or pay to have model entered into the PSS/E library

ERCOT Guides From the Planning Guide 6.2.1      Dynamics Data Requirements for Resources (1)          A Resource Entity shall submit new or updated dynamics data in accordance with Section 5, Generation Resource Interconnection or Change Request.  The Resource Entity shall provide all dynamics data as described in the Dynamics Working Group Procedural Manual.  The Resource Entity shall provide an accurate and appropriate model and model parameters.  Resource Entities are encouraged to use standard models to represent the Resource’s dynamic and transient capability and response.  If no appropriate standard model is available, the Resource Entity shall submit a model, model documentation, and the associated model parameters to ERCOT for inclusion in simulation-ready study cases as described in the Dynamics Working Group Procedural Manual.   From the DWG Procedure Manual 3              Dynamics Data 3.1          General 3.1.1      Software The current version of the planning software used by the DWG is PSSE version 33.

Nodal Protocol Nodal Protocol: Section 17 Market Monitoring and Data Collection 17.3.2    Data Categories and Handling Procedures ERCOT shall develop, and refine based on experience, a detailed catalog of all data categories that it can acquire and the procedures that it will use to handle such data, including procedures for protecting Protected Information.  This catalog must include documentation of the meaning of the data elements, and must be updated upon any change in systems (e.g. EMMS or settlements) that affect the data elements or interpretation of these elements.  17.3.3    Accuracy of Data Collection (1)     ERCOT shall continuously apply appropriate procedures for the accurate collection of data into the Data Warehouse and accurate communication of that data for use by the PUCT Staff and IMM.  By written notice, ERCOT may require Market Participants to verify the accuracy of data previously submitted to ERCOT. (2)    ERCOT shall report to the PUCT and IMM any failure by a Market Participant to provide accurate and complete information in the manner and time requested under these Protocols, and that failure may be treated as grounds for action against the Market Participant. (3)     ERCOT shall cause to be performed an audit on a periodic basis no less than once every three years of ERCOT data, data collection, and data documentation for adequacy and accuracy.  The auditor will provide recommendations to address potential areas of improvements.

NERC Standards MOD 12 R2. The Transmission Owners, Transmission Planners, Generator Owners, and Resource Planners (specified in the data requirements and reporting procedures of MOD-013-0_R1) shall provide dynamics system modeling and simulation data to its Regional Reliability Organization(s), NERC, and those entities specified within the applicable reporting procedures identified in Reliability Standard MOD-013-0_R1. If no schedule exists, then these entities shall provide data on request (30 calendar days).

Market Notice History Conversion to v33 for Dynamic Studies primarily impacts User Defined Models (UDM) since Library models are backwards compatible SSWG SSWG has been using v33 for several years DWG has to convert SSWG data in v33 to work in v32 Notice in August 2013 Deadline Extended to December 31 Deadline Extended again to March 31 Feb 2014, ERCOT offered model assistance to Wind Farms to switch to a Library model (previous project converted PSS/E Wind UDM to generic wind models for use in TSAT)

Response Summary (As of 5/20/2014) 55% of submitted updated parameters and models (.obj or .dll) files Category 1: No model update in the RARF 49 Resource Entities have not provided updated UDM models for PSS/e V33. Category 2: Partial model update in the RARF 14 Resource Entities provided in-complete UDM models for PSS/E V33. *A Resource Entity with multiple units can be counted in both categories.

Impact to DWG Dynamic Studies Originally wanted to conduct CY2014 in v33 last year Postponed transition to HWLL2017 Postponed transition to FY2019 starting in Mid June Completion of FY2019 may be slowed down ERCOT and DWG will review incomplete or missing data May be able to use old parameters on new model or models supplied by another generator May be able to suggest parameters from ERCOT’s TSAT Wind Model conversion project Poor response to v33 update for UDM is troubling Future data requests

Conclusion Poor response to data request for v33 UDM update Will impact DWG studies Substitute models/parameters will be needed for those that did not submit a v33 update or submitted an incomplete update Will slow down the FY2019 Case Build starting in June 16 Next steps ERCOT will recommend substitute models/parameters for missing v33 data based on available v33 models similar to the old v32 models or the data parameters from ERCOT’s TSAT Conversion Study ERCOT will update the data files used to add the wind models to the case (ini files and WindMachines33) Tentative finish date for data conversion activities is mid July