Monitoring Well Post-Installation Consideration By: Pierre-Orly Dupont.

Slides:



Advertisements
Similar presentations
Groundwater What is it and why is it important?
Advertisements

Soil Exploration T.E. Civil G.E.- I.
EVOLUTION OF BOREHOLE DRILLING ACTIVITIES Availability of water still far below demand Majority of big water schemes are surface water or ground water.
PHASE II ESA 2014 ESA GUIDELINES. PHASE II ESA 2014 ESA GUIDELINES PROJECT DEVELOPMENT PROCESSES –PATH 2 AND 3 PROJECTS –PATH 4 AND 5 PROJECTS W/ WORK.
Multi-Level Ground-Water Monitoring Travis von Dessonneck.
Environmental Drilling By: Josh Humphreys October 8,2006.
Plugging Abandoned Wells in Unconsolidated Formations.
© Blue Graphics Concept Sauer-Danfoss START-UP PROCEDURE PROPEL PUMP Instruction Sauer-Danfoss Belgium – T. Van Mossevelde.
Trinity Glen Rose Groundwater Conservation District Monty McGuffin, Santos Tovar and Jim O’Connor Resource Compliance and Protection Department March 10,
Terra Slicing Technology Overview.
Groundwater Control Affects design of: –Permanent Works –Temporary Works May affect viability of scheme Safety Issues –May cause instability of excavation.
What Materials Can Be Used to Plug a Well. Introduction Types of materials Reasoning for using these materials Why should you use potable water when mixing.
GROUNDWATER CONTROL.
WASH Cluster – Groundwater Pumping GWP GWP1 1 Groundwater Pumping Session 1 Handpumps.
PETE 411 Well Drilling Lesson 5 Hole Problems.
Groundwater Objectives
Properties of Aquifers
Well Plugging Steps. Introduction Key steps to plugging an abandoned well Importance of the steps Who to contact when plugging a well Common misconceptions.
How to Build a Groundwater Model Activity Source Created by the USA Groundwater Foundation; modified from the Science Olympiad event, Awesome Aquifers.
WASH Cluster – Emergency Training GWD GWD4 1 1 Groundwater Development and Drilling Session 4 Developing Groundwater Sources.
Effective Sealing Operations
Sand clay Hydraulic Capture clay piezometric surface.
Soils Investigation Soil Investigation
Acquisition and Interpretation of Water-Level Data Travis von Dessonneck.
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
Construction Dewatering
Soil and Rock Sampling. Environmental Site Characterization Number of samples taken depends on the size of the site Hollow stem auger normally used for.
SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING FOUNDATION ENGINEERING BY KARTHIVELU.
Basic Geologic and Hydrogeologic Investigations
Well Testing Initial production tests at surface after wellbore cleanup and fracing. Sometimes called initial potential or IP. IP= Initial Production IPF.
Kathy Metropulos Division of Drinking and Ground Waters Protecting your aquifer: What to consider when drilling oil and gas wells.
Why Developing?  Restore aquifer, following damage due to drilling  Reduce head loss by increasing permeability  Increase well efficiency  Reduce drawdown.
Well Construction Example 1 Screen in Target Confined Aquifer C Confined Aquifer B Proper Well Construction Requirements In addition to the Virginia Department.
8. Permeability (Das, chapter 7)
Profiling Transmissivity and Contamination in Fractures Intersecting Boreholes USEPA-USGS Fractured Rock Workshop EPA Region 2 14 January 2014 Claire Tiedeman.
Fall Hazards.
The Islamic University of Gaza Faculty of Engineering Civil Engineering Department Water Resources Msc. Groundwater Hydrology- ENGC 6301 lecture 4.
Soil Water Reading: Applied Hydrology Sections 4.1 and 4.2 Topics
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
John N. Dougherty, PG Lisa Campbell, PG EPA Region 2, New York City
Presented by: 1. A measure of how easily a fluid (e.g., water) can pass through a porous medium (e.g., soils) 2 Loose soil - easy to flow - high permeability.
Percussion drilling By Batch -2. Percussion drilling Cable Tool Drilling Percussion drills have been used to drill thousands of feet, though they are.
Monitoring and Protecting Groundwater During Oil & Gas Development Overview of Colorado Aquifer Systems November 26, 2012 Christopher J. Sanchez, P.G.
- Water beneath the Earth’s surface in sediment and rock formations.
Global Energy Security Forum Miami, Florida March 26, 2013 Mark K. Boling President HYDRAULIC FRACTURING OPERATIONS: SEPARATING FACT FROM FICTION.
1 4 Geology and Groundwater Introduction –Geology complexities are reflected in hydrogeology –Geology is the basis for any groundwater investigation Topics.
Water Supply and Treatment. Average Precipitation.
Ground Water. Makes up 0.397% of Earth’s Water. - song.
Groundwater and Soil A small introduction Dipl.-Ing. Walter Berier.
FIELD METHODS IN ENVIRONMENTAL GEOLOGY GEOS 3110.
Environmental Toolbox. Technical Module Introduction.
CE 3354 Engineering Hydrology Lecture 21: Groundwater Hydrology Concepts – Part 1 1.
Introduction to Water – Chapter 24. Pretest Water: 4 Primary Sections The Hydrologic Cycle (Water Cycle) The Hydrologic Cycle (Water Cycle) Glaciers.
HONR 297 Environmental Models
Modern GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Containment and.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Procedures and.
SITE INVESTIGATION.
Some Observations from Using a Colloidal Borescope in Basalt Aquifers Gerry Winter.
Well Development and Efficiency Groundwater Hydraulics Daene C. McKinney.
Fluid Mechanics for Chemical Engineers Arif Hussain (Lecturer)
4 Geology and Groundwater
What Do You Know About Michigan’s Hidden Resource?
Groundwater Review Aquifers and Groundwater Porosity
Deptt. of Irrigation and Drainage Engineering, Dr. PDKV, Akola
Deptt. of Irrigation and Drainage Engineering, Dr. PDKV, Akola
Water Wells Unit 4.
The Islamic University of Gaza Faculty of Engineering Civil Engineering Department Water Resources Msc. Groundwater Hydrology- ENGC 6301 Section 2:
Factsheet: Proper Permanent Well Abandonment for Virginia Coastal Plain Wells VDH DEQ What is.
NGWA 2004 Microbial GWQ Interest Group
Presentation transcript:

Monitoring Well Post-Installation Consideration By: Pierre-Orly Dupont

Introduction ► Post-Installation Considerations is important for:  Well’s and system’s integrity.  Well’s Identity.  Long-term operation.

Well Post-Installation considerations include: ► Monitoring well development. ► Reporting of construction details. ► Maintenance and rehabilitation. ► Abandonment (decommission).

Well Development General Considerations Methods AirLift Surging and Pumping with Compressed Air Mechanical Surging Surface Centrifugal Pump Submersible Pump Surge BlockBailer High-Pressure Water Jetting DecontaminationSurveying Work for most monitoring well Variety of depth-to- water conditions

General Considerations ► During installation:  There can be a loss of drilling fluids when encountering high permeable materials. This loss must be recovered.  Fine materials from adjacent formation must be removed as they can alter the permeability of filter-packed monitoring wells.  Extraneous materials may be dropped into the well.  Cuttings may stick to the borehole wall above water table (air-rotary drilling).  Cuttings from silt or clay can smear the borehole wall (hollow stem auger).

General Considerations ► Goals of monitoring well development:  Remove fine materials (silt, clay, fine sand).  Remove water lost during drilling.  Correct damage to the borehole wall.  Stabilize the filter pack and formation  Maximize the hydraulic communication between the well and the adjacent formation material.

Installation of a monitoring well should not be considered complete until it has been properly developed. In other words, developing a well involves procedures used to maximize its yield by attempting to restore the geologic formation to a predrilling state.

Well development activity ► The application of sufficient energy to create ground-water flow reversals (surging). ► Pumping to draw water lost to the formation during drilling out of the borehole and adjacent formation, along with the fines that have been brought into the well during surging.

Monitoring well development should continue until: ► Visibly clear water is discharged during the active (surging) portion of the development process. ► Field-measured quality (e.g., pH, Eh, conductivity) of the discharged water stabilizes and the turbidity is reduced to less than 10 Nephelometric Turbidity Units (NTU). ► The total volume of water discharged from the well is at least equal to the estimated volume of fluid lost to the formation during drilling and well installation. ► Therefore, there are methods to accomplish this development.

Well Development General Considerations Methods AirLift Surging and Pumping with Compressed Air Mechanical Surging Surface Centrifugal Pump Submersible Pump Surge BlockBailer High-Pressure Water Jetting DecontaminationSurveying Work for most monitoring well Variety of depth-to- water conditions

Airlift Surging and Pumping with Compressed Air ► Work for most monitoring wells. ► Should use a dual-line airlift system instead of conventional single-line airlift.  Introduction of oil.  Change in water chemistry.  May reduce hydraulic conductivity of formation.  Difficult to control

Airlift Surging and Pumping with Compressed Air ► Work for most monitoring wells. ► Should use a dual-line airlift system instead of conventional single-line airlift.  Introduction of oil.  Change in water chemistry.  May reduce hydraulic conductivity of formation.  Difficult to control. ► Must be at least 20%-40% of submergence of the air discharge line.

Determine submergence % pumping submergence = Length of air line below pumping water level Total length of air line X 100 = (195/395) X 100 = 50%

Well Development General Considerations Methods AirLift Surging and Pumping with Compressed Air Mechanical Surging Surface Centrifugal Pump Submersible Pump Surge BlockBailer High-Pressure Water Jetting DecontaminationSurveying Work for most monitoring well Variety of depth-to- water conditions

Mechanical Surging ► To force water to flow into and out of a screen by operating a plunger up and down in the casing.

Well Development General Considerations Methods AirLift Surging and Pumping with Compressed Air Mechanical Surging Surface Centrifugal Pump Submersible Pump Surge BlockBailer High-Pressure Water Jetting DecontaminationSurveying Work for most monitoring well Variety of depth-to- water conditions

Mechanical Surging For shallow well. Surface Centrifugal Pump ► Can be performed only if the depth to water is within the practical limit of suction lift.  Less than 20 feet below ground surface. For wide variety of depth. Submersible Pump ► Pump must be decontaminated. ► New, unused discharge line from the pump should be used. ► No touching ground to avoid contamination. ► Not limited by suction lift. using

Mechanical Surging Surge Block ► Swab. ► Raising and lowering a surge block heavy enough to free-fall through the water. ► Dependent on the length and force of the surging strokes. ► For deeper well, should use mechanical assistance. ► Involves only surging. Bailer ► Useful for wells in low-yield formations. ► Bailer needs to clean. ► Labor-intensive. ► Require more time than other methods. with

Well Development General Considerations Methods AirLift Surging and Pumping with Compressed Air Mechanical Surging Surface Centrifugal Pump Submersible Pump Surge BlockBailer High-Pressure Water Jetting DecontaminationSurveying Work for most monitoring well Variety of depth-to- water conditions

High-Pressure Water Jetting ► Required equipment is large. ► Not man-portable. ► May be done by water or air. ► Use centrifugal pumps or submersible pumps. ► Help correct damage to the formation’s porosity and permeability.

Well Development General Considerations Methods AirLift Surging and Pumping with Compressed Air Mechanical Surging Surface Centrifugal Pump Submersible Pump Surge BlockBailer High-Pressure Water Jetting DecontaminationSurveying Work for most monitoring well Variety of depth-to- water conditions

Well Development General Considerations Methods AirLift Surging and Pumping with Compressed Air Mechanical Surging Surface Centrifugal Pump Submersible Pump Surge BlockBailer High-Pressure Water Jetting DecontaminationSurveying Work for most monitoring well Variety of depth-to- water conditions

Surveying ► Locations of monitoring wells may be plotted onto maps for developing and interpreting hydrologic data. ► Water-level measurements. ► Ground water contour map. ► Elevations (National Geodetic Vertical Datum) ► GPS. ► Well Identification:  Placing a number on protective case.

Well Post-Installation considerations include: ► Monitoring well development. ► Reporting of construction details. ► Maintenance and rehabilitation. ► Abandonment (decommission).

Reporting of construction details. ► Results of monitoring can be affected by the details of the well’s construction. ► Presented in full detail as an appendix to a report. ► Report include: (page )  Borehole diameter.  Length of screen.  Ground surface elevation….

Well Post-Installation considerations include: ► Monitoring well development. ► Reporting of construction details. ► Maintenance and rehabilitation. ► Abandonment (decommission).

Monitoring Well Maintenance and Rehabilitation ► Maintenance program: (page 870)  Surface Observations  Subsurface Observations  Ground-water sample quality (wait for lab result) ► Rehabilitation program:  Well performance has been reduced.  Ground-water sample quality has changed.

Well Post-Installation considerations include: ► Monitoring well development. ► Reporting of construction details. ► Maintenance and rehabilitation. ► Abandonment (decommission).

Monitoring Well and Borehole Decommissioning. (abandonment) ► One of most important post-construction of a ground-water monitoring program. ► 2 main objectives to decommissioning:  Restore the borehole to its original condition.  Prevent cross-contamination between formation. ► Should be planned and well document just like original well.

Planning for Decommissioning ► 6 key element:  State, federal or local regulations (Table 12.3)

Planning for Decommissioning ► 6 key element:  State, federal or local regulations (Table 12.3)  Type of well or borehole to be decommissioning.  Hydrogeologic environment.  Chemical environment.  Disposal of potential contamination.  Type of equipment and quantity of grouting needed.

Decommissioning Material ► TYPE I Portland Cement. ► Sodium bentonite. ► Use of granular, chip, or pellet forms of bentonite (when little water is present) ► Use a tremie pipe to place those materials

Procedures for Decommissioning ► Recheck planning of decommissioning. ► Be sure well is free of debris. ► Determine depth of well. ► Fill the length of the screen with fine sand. ► Place decommissioning material. ► Make records and reports.

FIN Any questions?