NARUC Energy Regulatory Partnership Program The Georgian National Energy Regulatory Commission and The Vermont Public Service Board by Geoff Commons Vermont.

Slides:



Advertisements
Similar presentations
Reliability in British Columbia
Advertisements

Impact Fees and Colorados Water and Wastewater Utilities Presented by: Jason Mumm, Sr. Consultant, Integrated Utilities Group Carol Malesky, Sr. Consultant,
1 Public Economics South African research topics Andrew Donaldson National Treasury August 2009.
Public Health - Always Working for a Safer and Healthier Washington Washington State Department of Health Division of Environmental HealthOffice of Drinking.
Antitrust Policy and Regulation Chapter 18 McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Washington State Department of Health Division of Environmental HealthOffice of Drinking Water Mike Dexel Water Resources Policy Lead Municipal Water Law.
Washington State Department of Health Division of Environmental HealthOffice of Drinking Water Water System Regulation and Planning Regina Grimm, P.E.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Funding for Municipal Infrastructure Ruth Noemí Colón Acting Secretary of State George Stafford Deputy Secretary of State Public Finance and Management.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
NARUC/NIGERIA REGULATORY PARTNERSHIP Peer Review Presented by Elijah Abinah Assistant Director Public Utilities Division Arizona Corporation Commission.
North Carolina Child Care Licensing 2.01 Notes. Critical Questions Journal Question: Why does NC require licensing of child care centers?
Building a Special Education Infrastructure Through a Joint Power Authority.
Regulatory Best Practices for Small Water Companies May 6, 2009 John Hoy Chief Regulatory Officer May 6, 2009 John Hoy Chief Regulatory Officer.
NARUC Energy Regulatory Partnership Program The Georgian National Energy Regulatory Commission and The Vermont Public Service Board by June E. Tierney.
Hydropower Development: Experience of Nepal
South Carolina Finance Workshop for Small Water Systems June 4, 2013 Water Partnerships: Financial Advantages and Challenges SC Case Study: Lowcountry.
Who Should Pay for Costly Water and Sewer Infrastructure? The Legal Considerations TRWA / TWCA Water Law Seminar January 24 – 25, 2013 Austin, Texas Leonard.
Financing “Greenfield” Developments An Overview of Financing Options for a combined Water System Presentation to NARUC Water Committee July 2007 By Keith.
Business Organizations
Urban and small town water supply management models in Ghana Presentation of findings from sector review and case studies from the TPP Project NLLAP meeting.
Carbon Capture and Storage State Legislation Kathy G. Beckett Midwest Ozone Group January 22-23, 2009.
Connecticut Department of Energy and Environmental Protection.
DRA Advocacy Joe Como, Acting Director. 2 DRA Facts The Voice of Consumers, Making a Difference! 3  History: CPUC created DRA (formerly known as the.
Wenxin Zhang Department of Civic Design University of Liverpool
Triennial Plan 2: Legal Framework. About Us  Efficiency Maine is an independent trust – Accounts and administrative responsibilities transferred from.
Collaboration Nation: Piloting EPA’s Small Local Governments Compliance Assistance Policy Ken Harmon, Attorney Office of Compliance U.S. Environmental.
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
Q1 UPDATE Local Energy Cooperative Formation {Ambassador} | {Phone Number}
Water Conservation Planning June 3, 2008 Lee Keck Division of Water Supply.
1 THE RATE CASE PROCESS A Blend of Science and Superstition Presentation to the Mongolian Energy Regulatory Board By Burl Haar Executive Secretary Minnesota.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Regulation & Finance Unit 7: Forecasting and Encouraging Ridership.
Water and Wastewater Certification 1 Water & Wastewater Reference Manual.
City of Polson April 5, 2010 PUBLIC HEARING Water System Improvements PRESENTATION ON PRELIMINARY ENGINEERING REPORT.
Lori Mathieu, Section Chief, Drinking Water Section & Steve Knauf, Chief Sanitarian, Chatham Health District.
WASTEWATER FACILITIES PLANNING Public Information Session August 29, 2013 Town of Clinton, CT Water Pollution Control Commission.
WRDC Finance Committee Nancy Scott Utilities Division ARIZONA CORPORATION COMMISSION March 17, 2011.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Sunshine Coast Regional District Development Cost Charges July 3, 2014 Infrastructure Services Committee Bob Twerdoff.
1 Chapter 6 Financial Management for Water, Sewer, and Storm Water Systems.
Ratepayer and Customer Rights Energy Regulatory Partnership Program Abuja, Nigeria July 14-18, 2008 Presented by Robert W. Kehres.
Crosswalk of Public Health Accreditation and the Public Health Code of Ethics Highlighted items relate to the Water Supply case studied discussed in the.
NARUC Energy Regulatory Partnership Program The Georgian National Energy Regulatory Commission and The Vermont Public Service Board by John D. Burke, Board.
1 Collateral/Security A Regulators Perspective Wednesday, February 8,2012 John Schrock, Administrator –State of Michigan Workers’ Compensation Agency Self-Insured.
Overview of a Water Action Plan: California Public Utilities Commission Paul G. Townsley, President Arizona American Water January 18, 2011.
Understand responsible actions for conducting business. 1.
MPSC Licensing Issues Energy Regulatory Partnership Program Abuja, Nigeria July 14-18, 2008 Presented by Robert W. Kehres.
WSSB Capacity Enhancement Workshop1.  Definition: Public-Private Partnerships (PPPs) are a form of legally enforceable contracts between the public and.
Water System Consolidation and Restructuring Scott Torpie Washington State Department of Health Drinking Water Advisory Group November 3, 2014.
Role of the Commission and Recent Policy Actions Interconnection Workshop Carol Revelt Utah Public Service Commission December 4, 2007.
COST OF SERVICE STUDIES Carryn Lee Manager-Water & Sewer Rate Design Branch Assistant Director-Financial Analysis Division KENTUCKY PUBLIC SERVICE COMMISSION.
Vogtle Nuclear Plant Update Moderator: Honorable Greg White, Michigan Panelists: Honorable Lauren “Bubba” McDonald, Georgia Public Service Commission Buzz.
REPUBLIC OF MACEDONIA STATUS REPORT ON MEETING THE COMMITMENTS OF THE ATHENS MOU SEEERF IV PERMANENT HIGH LEVEL GROUP MEETING Athens, Greece September.
Utah Division of Water Rights June 21, Boyd Clayton April 11, 2014 RWAU Water Right Certification Training Review.
Road Map to the Future: The Consolidation of Sewer Infrastructure in Rutherford County, NC November 16 th, 2015.
1 Financial management for water, sewer, and storm water systems Most financial management of water, sewer, and storm water systems takes place in a government.
Facilities Planning Overview As a response to the Rose v. Council for Better Education, Inc., the Kentucky Supreme Court, the 1990 Kentucky Education Reform.
National Environmental Investment Strategy - NEIS Ana Petrovska Regional Environmental Centre for Central and Eastern Europe.
CarolloTemplateWaterWave.pptx City of Bainbridge Island Water System Plan Policy Discussion April 21, 2015.
PRESENTER’S NAME TITLE AMERICAN PUBLIC POWER ASSOCIATION Data from the Energy Information Administration, 2014 and Public Power Statistical Report, 2015.
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
Status Update on USEPA Compliance Sausalito City Council February 26, 2013 SMCSD Directors Raymond Gergus, President Bill Ring, Vice President Ann Arnott.
Draft - Enterprise Risk Management Risk Universe
An Exciting New Service
BACKFLOW MANAGEMENT INC
Government Agencies Important to Small Businesses
Johnny François Regional Office Manager, Les Cayes
CHAPTER 10 Corporate Governance
Presentation transcript:

NARUC Energy Regulatory Partnership Program The Georgian National Energy Regulatory Commission and The Vermont Public Service Board by Geoff Commons Vermont Public Service Department July 2, 2008 Regulation of Water Systems in Vermont

2 Areas of Regulation v Economic regulation –Assure financial health of water system – Customers are best served by financially healthy utilities –Assure fairness to customers – Good service at affordable rates –Provide “just and reasonable” rates – Balance between customers, utility

3 Areas of Regulation, continued v Water quality regulation –Prevent and remedy contamination – bacterial, chemical, etc. –Assure physical integrity of system –Guard public health

4 Who regulates public water systems? v Agency of Natural Resources, Water Supply Division – water quality regulation –Executive branch, administrative agency –Responsible for protection of public health –Water quality standards, including chemical and bacteriological quality –Water system engineering and design standards –Source protection –Directs response to incidents of contamination, other threats to public health –Also regulates well drilling, construction

5 Who regulates public water systems? continued v Public Service Board – economic regulation –Quasi-judicial agency –Economic regulation of some (but not all) water systems –Sets rates and terms of service (tariffs) –Reviews borrowing by utilities

6 What systems are regulated? v Water Supply Division (water quality) –Jurisdiction over all public water systems regardless of ownership –Smallest systems – fewer than 15 connections or 25 customers – are exempt

7 What systems are regulated? continued v Public Service Board (economic regulation) –Jurisdiction over privately-owned water systems - statute exempts systems owned by municipalities (towns and fire districts) –No exemption for small systems – even if only one customer! –Systems owned by users are exempt by ruling of Vermont Supreme Court –Economic regulation not needed where customers control water system

8 Systems regulated by Public Service Board v 26 separate systems v Largest has 625 connections v Smallest has 3 v Operators – range from professionals with good management skills, to part- time with minimal skills v Attitudes toward regulation vary

9 Why regulate water systems as utilities? v Safe, affordable water supply critical to life, economy v Natural monopoly v Some – but not all! - customers can “self- generate” by drilling a well, disconnecting from system v Customers leaving system increase costs for remaining captive customers v Rate shock can lead to “death spiral” especially for small, rural systems

10 Regulatory Requirements v Water Supply Division (water quality) –Operating permit – often with conditions –Ongoing testing requirements –Periodic sanitary surveys –Treatment capability usually required (chlorination) –If contamination detected, public notification – “boil notice” –Construction permits and standards –Adequacy of supply for peak demands – pump test, storage capacity –New sources tested before use –Source protection zones – isolation from sources of contamination

11 Regulatory Requirements, continued v Public Service Board (economic regulation) Franchise – Certificate of Public Good (CPG) - criteria: –technical expertise to operate the water system; –providing (or will provide) adequate service to its customers; –demonstrated commitment to maintain facilities; –Management strikes a reasonable balance between the needs of shareholders and the needs of customers; –Financial stability; –ability to obtain adequate capital funding; –good business reputation; –good relationship with customers –history and current status with regard to compliance with WSD's monitoring requirements

12 Regulatory Requirements, continued v Public Service Board, continued –Approval of initial rates – just and reasonable –Terms of service (tariffs) – billing, payment, disconnection, metering, etc. –Review of borrowing –Rate cases – similar to other types of utilities: cost of service, return on rate base –Opportunity for review of service, public input –Public advocate coordinates with WSD – can seek conditions to correct violations, deficiencies –Revocation of franchise possible for chronic mis- management, violations

13 Issues in Water Regulation v Rate design – “you’re not paying for the water” –Several systems serve mostly seasonal residents –Use of “design flows” to set rates –Current users should not pay for system expansion to serve new customers v Economies of scale –Difficult to “grow” systems – may be possible to combine management v Lumpy investments and rate shock –Sinking funds – used by municipalities, others, but not by PSB-regulated systems – intergenerational equity concerns –pipe replacement programs –rate phase-in – only possible with company’s agreement v Owner/operator capabilities vary widely –Reluctance to file rate cases causes degradation of service, eventual rate shock –May lead to “innovative” solutions to problems –Reluctance to file may result from wish to avoid scrutiny, aversion to legal process, having to face unhappy neighbors

14 Issues in Water Regulation, continued v Cost of regulation for small systems v Benefits of customer control v Non-payment issues –Disconnection works! –Not always feasible – multi-unit buildings, lack of shut-offs v Settlements, transfers, other issues?