1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B2 “Overhead Lines” Activity Report Presented by: Zibby Kieloch (Manitoba.

Slides:



Advertisements
Similar presentations
Safety for electronic systems High-frequency Filtering of DC Power Lines Technical, constructional and practical issues with filtering on dc power lines.
Advertisements

CIGRE Study Committee B3 “Substations”
Electrical Cable Aging: What does IAEA Recommend? Module 2 Dr. John H. Bickel Evergreen Safety & Reliability Technologies, LLC.
1 The mission of Study Committee A3 is to facilitate and promote the progress of engineering and the international exchange of information and knowledge.
Study Committee Representatives Annual Report December, 2012
WG B4.62 Connection of Wind Farms to Weak AC Networks Working Group Meeting – June 2013, ERCOT Office, Taylor, Texas.
AG.03: CIGRE SC A3 Green Book planning
International Symposium on Standards for UHV Transmission System Impacts on UHV Substation Equipment On behalf of CIGRE WG A January 2009,
Study Committee A2 Colloquium in Shanghai, September, 2015 Study Committee A2 Colloquium in Shanghai, September, 2015 SC A2 will have their.
CIGRE 2012 A brief report regarding B1 and D1 activities (related to cables) Ray (Refat) Awad
Annual Review Meeting of SC activities October 4, 2009 Toronto Study Committee C4 System Technical Performance Danielle McNabb, Hydro-Québec -TransÉnergie.
CIGRE WG C PRACTICES IN INSULATION COORDINATION OF MODERN ELECTRIC POWER SYSTEMS AIMED AT THE REDUCTION OF INSULATION LEVELS WG Composition: WG.
GTI’s Composite Materials (CM) Program
1 AG.03: CIGRE SC A3 Green Book proposal (based on experience of Brazilian NC to publish CIGRE textbooks) CIGRE SC A3 Green Book Project Team Paulo Fernandez.
The Power Grid ELEC 403 The Citadel Mark McKinney.
Protection against Lightning Overvoltages Overvoltages due to lightning strokes can be avoided or minimized in practice by (d) shielding the overhead lines.
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
1 Study Committee Representatives Annual Meeting October 4, 2009 Toronto SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
SC B5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2010 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie.
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
Amantegui Javier (SP) CIGRE Study Committee B5 1 CIGRE STUDY COMMITTEE B5: MISSION AND CHALLENGES Javier Amantegui (Spain) Chairman of CIGRE-SC-B5 “Protection.
BRIEF ON THE REPORT OF CIGRE WG B4-45 –
Year 2006 Report “Better” Managed and Controlled Transmission Grids using Advanced Technological Concepts Aty Edris EPRI Power Delivery & Markets
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
1 CONSEIL INTERNATIONAL DES GRANDS RESEAUX ELECTRIQUES INTERNATIONAL COUNCIL ON LARGE ELECTRIC SYSTEMS STUDY COMMITTEE A2 TRANSFORMERS Presentation of.
授課教師 : 吳元康 老師 學生 : 詹博雄 HVDC Connection of Offshore Wind Farms to the Transmission System.
9/4/20151 Cigre WG B1.41 Meeting Long term performance of soil and backfill of cable systems Milan, Italy Mar , 2013 Walter Zenger, USA Convener.
ELG4125 Transmission and Distribution Systems
Business Plan OVHL MAINTENANCE by Nedeljko Drakul.
Study Committee SC B3 CIGRE - CNC Winnipeg, October 19, 2008 Slide 1 SC - B3 “Substations” Design, construction, maintenance and ongoing management of.
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
All rights reserved Surge Arrester.
Barcelona, May 13, 2003 ASSET MANAGEMENT Development of new approaches Gerd Balzer Darmstadt University of Technology TU Darmstadt Institute of Electrical.
Toronto, Ontario - Cigre Canada Annual Membership meeting, October 4, 2009 CIGRÉ – 2010 Study Committee Presentation C1 System Development and Economics.
Dynamic Thermal Ratings for Overhead Lines Philip Taylor, Irina Makhkamova, Andrea Michiorri Energy Group, School of Engineering Durham University.
Toronto, Ontario - Cigre Canada Annual Membership meeting, October 4, 2009 CIGRÉ – 2009 Activity Report for SC C6 DISTRIBUTION SYSTEMS AND DISPERSED GENERATION.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
Joint Meeting Report on Standards 8 July Recent Accomplishments Systems Modeling Language (SysML) specification accepted for adoption by OMG AP233.
SC B5 - Protection and Automation Report to the Canadian National Committee of Cigré 2007 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie.
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
Toronto, Ontario - Cigre Canada Annual Membership meeting, October 4, 2009 CIGRÉ – 2009 Activity Report for SC C1 System Development and Economics David.
IEEE CIGRE Liaison Report on SCA2 Transformers
SC B5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2009 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie.
Cigre / IEC UHV Symposium, New Delhi Strategic Agenda for CIGRE‘s Technical Activities Klaus Fröhlich.
UK Launch 01/10/2015. INTRODUCTION 10:15 – 10:20: Welcome & Introduction 10:20 – 10:35: About Groundline Engineering 10:35 – 10:50: Key Note Speech from.
Hoeffelman_BE_ALPHA 2_Block 1 Barcelona May EMI-EMF update Recent achievement and work going on in relevant WG’s Jean Hoeffelman ELIA- Belgium.
Utility Engineers, PC.  Generation  Transmission  Distribution.
August 22nd/23rd 2014 WG B3.32 Saving through Optimized Maintenance in Air Insulated Substations 2014 Session – Paris, France.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
Embankment Dam and Spillway Relative Risk Procedures (for Asset Management/Maintenance) Luc Chouinard – McGill University.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Chapter # 8 Mechanical Design of Overhead Lines.
Coordination Activities by JICCG for UHV technology standardization Hisatoshi Ikeda Co-Chairman of IEC/JICCG Toshiba Co. & Kyushu Institute o f Technology.
HVDC Transmission.
Grid maintenance expenses Commerce Commission Workshop 2 March 2010.
Committed to connecting the world Overview of ITU-T SG5 Work on Damage protection and safety Guy-Michel KOUAKOU Chairman of Study Group 5 Regional Group.
59th Technical Committee Meeting, Barcelona (ES), March 26-27, 2012 SC A1 PREFERENTIAL SUBJECTS FOR 2014 SESSION DRAFT PS1: Developments in Rotating Electrical.
Presentation of CIGRE activities Chairman SC A2 "Transformers"
Disaster and Emergency Planning
Study Committee D1 – Organisation
Protection Specialist
Study Committee Representatives Annual Meeting October 18, 2010 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
ISO New England System R&D Needs
Photovoltaic Systems Engineering Session 19
CIGRE WG C4.28 Extrapolation of EMF measurements
Evolution of HV Cable Systems
CNC-CIGRE Study Committee Meeting October 19, 2008 Winnipeg CIGRÉ SC – A3 High-Voltage Equipment Hubert Mercure Hydro-Québec / IREQ.
EHV Transmission Equipments
Photovoltaic Systems Engineering Session 12
Presentation transcript:

1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B2 “Overhead Lines” Activity Report Presented by: Zibby Kieloch (Manitoba Hydro)

2 SC B2 Overhead Lines Subject Area Design, construction and operation of overhead lines including the mechanical and electrical (in cooperation with SC C3 & SC C4) design of line components (conductors, ground wires, insulators, accessories, structures and their foundations). Validation tests, studies of in service performance, assessment of the state of line components and elements. Maintenance, refurbishment, upgrading, and uprating of overhead lines.

3 SC B2 Overhead Lines Membership 24 Regular Country Members (including Canada) 12 Observer Country Members Canadians On SC B2 32 Canadians in various groups (total number of technical experts from all countries: 200+) 4 new Canadian experts added last year Canada is represented on all but one Working Group Mr. Normand Bell (Hydro-Quebec) – SC B2 Secretary 3 Canadians as Convenors of Working Groups

4 SC B2 Overhead Lines Structure - General New structure introduced in 2008: Convenor and Secretary 7 New Advisory Groups: 4 Technical 3 Supporting: Strategic, Customer, Publications & Tutorials Disbanded most of the existing Working Groups (upon completion of work) Created 22 new Working Groups with narrow focus Eliminated existing Task Force groups

5 SC B2 Overhead Lines Structure - Technical Groups AG B2.04 Electrical Performance Advisory Group TF B2.20 “Management of risks due to load-flow capacity increases in transmission overhead lines” WG B2.26 “A guide to evaluating and accepting new types of overhead conductor including those running at high temperature” WG B2.36 “Guide for application of direct real time monitoring systems on overhead transmission lines” WG B2.38 “Evaluation of high surge impedance load solutions for increased natural capacity for OHL”

6 SC B2 Overhead Lines Structure - Technical Groups AG B2.05 Towers, Foundations and Insulators Advisory Group WG B2.08 “Transmission Line Structures” (soon to be disbanded and replaced by 2 new Working Groups) WG B2.21 “Arc protection and diagnosis for composite string insulators ” WG B2.23 “Geotechnical and structural design of the foundations of HV & UHV Lines ”

7 SC B2 Overhead Lines Structure - Technical Groups AG B2.06 Mechanical Behaviour Of Conductors and Fittings Advisory Group WG B2.25 “Preparatory studies on specifications for revision of IEC testing of self damping and conductor fatigue characteristics (new IEC Spec.), for high temperature fittings (IEC 61284), for tests on spacers (IEC 61854) and on dampers (IEC 61897)” WG B2.30 “Engineering guidelines relating to fatigue endurance capability of conductor/clamp systems” WG B2.31 “Modeling of aeolian vibration of single conductors”

8 SC B2 Overhead Lines Structure - Technical Groups AG B2.06 Mechanical Behaviour Of Conductors and Fittings Advisory Group (cont’d) WG B2.32 “Assessing the performance of aged fittings: testing, acceptance criteria & recommendations for HV & UHV lines” WG B2.33 “Guidelines for cable cart/trolley (cycling) safety on old conductors (earthwires) equipped with aircraft warning markers (and other fittings)”

9 SC B2 Overhead Lines Structure - Technical Groups AG B2.07 Asset Management, Reliability and Availability Advisory Group WG B2.16 “Meteorology for overhead lines” (soon to be disbanded and replaced by a new Working Group) WG B2.22 “Mechanical security of overhead lines with effective failure containment measures: design loading cases and strategies for effective anti-cascading supports” JWG B2/B3.27 “Live-Line Maintenance - A Management Perspective”

10 SC B2 Overhead Lines Structure - Technical Groups AG B2.07 Asset Management, Reliability and Availability Advisory Group (cont’d) WG B2.29 “Anti- and de-icing systems for HV and UHV overhead lines” WG B2.34 “The impact of line configurations on electric and magnetic fields, radio interference and audible noise for 800 and 1000 kV OHL” WG B2.39 “Validation of design guidelines implemented for High Intensity Winds (HIW)”

11 SC B2 Overhead Lines Structure - Technical Groups AG B2.07 Asset Management, Reliability and Availability Advisory Group (cont’d) WG B2.40 “Calculations of the electrical distances between live parts and obstacles for OHL: Preparatory studies for revision of IEC standards (IEC 61865, IEC 60826, EN 50341)”

12 SC B2 Overhead Lines Structure - Technical Groups Special Technical Groups JWG B2/B4/C1.17 “Impacts of HVDC Lines on Economics of HVDC Projects” JTF B2/D2.18 “Overhead lines geographical and asset information system” JWG B2/C1.19 “Increasing capacity of overhead lines - needs and solutions”

13 SC B2 Overhead Lines Meetings CIGRÉ 2008 Paris Session Working Group Meetings:August 22-28, 2008 SC B2 Open Session:August 26, Preferential Subjects: “Increasing capacity of overhead lines” “Solutions to improve the availability of overhead lines” 27 Technical Papers Technical Meeting:August 27, 2008 Administrative Meeting:August 28, 2008

14 SC B2 Overhead Lines Meetings Next SC Meeting October 2009 in Seoul, Korea

15 SC B2 Overhead Lines Main Achievements in Publications: SC B2 was the most productive among all 16 CIGRÉ Study Committees. A total of 11 Electra articles and 10 Technical Brochures were produced in TB 322 / ELT 232_3 “State of the art of conductor galloping” TB 324 / ELT 232_4 “Sag-tension calculations for overhead lines” ELT 232_2 “Generic specification for an ideal load control device” TB 333 / ELT 234_3 “Guide for the establishment of naturally polluted insulator testing stations” TB 331 / ELT 234_4 “Considerations relating to the use of high- temperature conductors”

16 SC B2 Overhead Lines Main Achievements in Publications (cont’d): TB 332 / ELT 234_5 “Fatigue endurance capability of conductor/clamp systems - update of present knowledge” TB 344 / ELT 237_5 “Big storm events - what we have learned” TB 345 / ELT 237_6 “Alternating current (AC) resistance of helically stranded conductors” TB 348 / ELT 238_4 “Tower top geometry and mid span clearances” TB 350 / ELT 238_5 “How overhead lines (OHL) respond to localized high intensity winds - basic understanding” TB 353 / ELT 239_3 “Guidelines for increased utilization of existing overhead transmission lines”

17 SC B2 Overhead Lines Expected Key Deliverables in Expected Publications: “Guidelines for evaluating special topographical effects in determining wind speed for design of overhead lines” “Probabilistic design of foundations” “Failure load of OHL steel towers considering the variation of mechanical properties” “Innovative solutions for overhead line supports” “Comparison of general practices for lattice tower design and detailing” “Discrepancies between predicted and measured values of load in members of towers during tests; influence of the hyperstatic modeling on the behaviour of transmission line lattice structures”

18 SC B2 Overhead Lines Expected Key Deliverables in Expected Publications (cont’d): “Improvement on the methodology of tower testing” “Large overhead line crossings” “Impacts of HVDC Lines on Economics of HVDC Projects” “Guidelines for cable cart/trolley (cycling) safety on old conductors (earthwires) equipped with aircraft warning markers (and other fittings)” “Assessing the performance of aged fittings: - Testing, acceptance criteria & recommendations for HV & UHV Lines” “Aeolian Vibrations of Single Conductors Strung at Relatively High Tensile Load. Application to HV & UHV Lines”