P RODUCT D ESIGN AND D EVELOPMENT Chapter 3, 4 & 5 – Product Planning, Customer Needs & Product Specifications.

Slides:



Advertisements
Similar presentations
1 Slide 1 Ontolog Conference Call – 20 April, 2006 Ontologizing the ONTOLOG Body of Knowledge W hat In It for Me? – Engineering the Value Proposition for.
Advertisements

Designing Products & Engineering. Customers Requirements l Normal Requirements are typically what we get by just asking customers what they want. l Expected.
Assess the Market for Your Business Idea
Using QFD to Establish Design Specifications
Goal Setting Learning to Work Efficiently and Effectively.
Tree Diagrams 1. Learning Objectives Upon completing this module, you will be able to:  Understand the purpose and use of a Tree Diagram (TD)  Construct,
Chapter 2 Analyzing the Business Case.
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
The Main Idea To ensure success, entrepreneurs need to understand the industry and the market.   They should define areas of analysis and conduct effective.
Coordinate implementation of customer service strategies Lecture 2 Payman Shafiee.
Global Procurement Solutions (GPS) Manager of Business Development Final Project, Fall semester December 16, 2000.
1 2-1 McGraw-Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc.,
Designing a Product Product design is usually a problem that requires a creative Design and/or manufacturing solution.
QUALITY FUNCTION DEPLOYMENT CHAPTER 12
1 Introduction to System Engineering G. Nacouzi ME 155B.
Chapter 8 The Marketing Plan
Lecture 3 Strategic Planning for IT Projects (Chapter 7)
Teaching materials to accompany:
P RODUCT D ESIGN AND D EVELOPMENT Chapter 1 & 2 Development Process and Organization.
Sharif University of Technology Session # 4.  Contents  Systems Analysis and Design Sharif University of Technology MIS (Management Information System),
Problem solving in project management
Y. Rong June 2008 Modified in Feb  Industrial leaders  Initiation of a project (any project)  Innovative way to do: NABC ◦ Need analysis ◦ Approach.
Prof. A. Taleb-Bendiab Room 605 A. Taleb-Bendiab, Module: Research Methods,
Design and Research Mr. Badrul Azmi Abdul Holed School of Manufacturing Engineering Universiti Malaysia Perlis (UniMAP) 21 st. July 2008 EPT322 INDUSTRIAL.
S/W Project Management
© 2005 Virtue Ventures LLC. Licensed under a Creative Commons Attribution-Share Alike 3.0 License Feasibility Analysis For Social Enterprise.
Preparing and Planning to Manage
1 Rev: 02/12/2007 MSE-415: B. Hawrylo MSE-415: Product Design Lecture #3 Chapter 4 Identifying Customer Needs.
المحاضرة الثالثة. Software Requirements Topics covered Functional and non-functional requirements User requirements System requirements Interface specification.
SYSE 802 John D. McGregor Module 6 Session 1 Systems Engineering Analyses II.
Quality Management.  Quality management is becoming increasingly important to the leadership and management of all organisations. I  t is necessary.
Engineering Design Introduction to Mechanical Engineering
7 Market Research Section 7.1 What Is Market Research?
Marketing – Chapter 28 What is Market Research?
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Design Step 2: Research the Problem. Knowledge Base Does a similar product already exist? Are there regulatory and standards issues? –intellectual property.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
Management & Development of Complex Projects Course Code MS Project Management Perform Qualitative Risk Analysis Lecture # 25.
1 CERTIFIED SOLIDWORKS ASSOCIATE (CSWA) EXAM Nov 26, 20119:00-12:00 Dec 3, :00-12:00 SEB1015 NOTES We’ll take registrations in November but you’ll.
IMH D EVELOPING G LOBAL S TRATEGIC P LANS Goals Explain the role of strategic planning in international marketing. Discuss the strategic planning.
THE BUSINESS VISION AND MISSION
Lecture 3 Title: Information Technology Project Methodology By: Mr Hashem Alaidaros MIS 434.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Presentation made by 3D High School G.B. Bodoni.  What is it? Business Plan is a planning document that describe in detail the business project and allows.
RCM Tools Histogram Pareto Chart Cause and Effect Diagram FMEA.
Planning in Organizations Why supervisors and managers plan: Knowing what the organization is trying to accomplish helps them set priorities and make decisions.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Project Risk Management Planning Stage
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
4. Marketing research After carefully studying this chapter, you should be able to: Define marketing research; Identify and explain the major forms of.
Read to Learn Describe the kinds of market research a company may use. Identify the steps in developing a new product.
The Marketing Plan Vishnu Parmar, IBA, University of Sindh, Jamshoro.
Module 4: Systems Development Chapter 13: Investigation and Analysis.
Market Analysis Glencoe Entrepreneurship: Building a Business Doing Market Research Industry and Market Analysis 6.1 Section 6.2 Section 6 6.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
IT-465 Introduction to Lean part Two. IT-465 Lean Manufacturing2 Introduction Waste Walks and Spaghetti Charts Outcomes Understand what a waste walk is.
Quality Function Deployment (QFD) Getting from the voice of the customer to technical design specifications.
Chapter 6 – International Opportunities. International Opportunities Ideas, Solutions and Opportunities International markets not right for every company.
Alternative Designs  Why?  Whole or portion?  Expand the solutions.
Product Design and Development Chapter 3
Overview of System or Process Design and Improvement 1.
Section 28.1 Marketing Information Chapter 28 marketing research Section 28.2 Issues in Marketing Research.
Planning and Organizing Chapter 4. The Planning Function Business Plan – a written description of the nature of the business, its goals, and objectives,
CHAPTER 13 MARKETING in TODAY’S WORLD The Basics of Marketing Market A market is a group of customers who share common wants and needs, and who have.
ME/MECA 238A1 ME/MECA 238A - Mechanical/Mechatronic Design Project I Course notes prepared by G.A. Kallio, based on The Mechanical Design Process, by D.G.
CIW Lesson 10 Part A NAME:____________________________.
+ CIW Lesson 10 PART A. + IT Project and Program Management Successfully managed IT projects increase productivity and increase profits IT projects differ.
Formulate the Research Problem
Why QFD….? Product should be designed to reflect customers’ desires and tastes. House of Quality is a kind of a conceptual map that provides the means.
Chapter 8 The Marketing Plan
Presentation transcript:

P RODUCT D ESIGN AND D EVELOPMENT Chapter 3, 4 & 5 – Product Planning, Customer Needs & Product Specifications

F OUR TYPES OF P RODUCT D EVELOPMENT New product platforms Derivatives of existing product platforms Incremental improvements to existing products Fundamentally new products

P LANNING P ROCESS ( CHAPTER 3) Identify opportunities Evaluate and prioritize projects Allocate resources and plan timing Complete pre-project planning Product development process

5 S TEPS TO P RODUCT P LANNING For each task, the plan states the objectives, the personnel requirements, the time requirements, the schedule relative to other tasks, projects and programs, and sometimes cost estimates STEP #1: Identify the Tasks Should be made as specific as possible STEP #2: State the objective for each task Each task should have a clearly stated objective and must be: Easily understood by the design team Specific in terms of exactly what information is to be developed; if concepts are need, specify how many are sufficient Feasible, give the equipment, personnel, and time available.

STEP #3: Estimate the personnel, time, and other resources need to meet the objectives. STEP #4: Develop a sequence for the tasks Goal is to have each task accomplished before the result is needed while at the same time making use of all personnel all the time. Milestone or Gantt charts are often used STEP #5: Estimate the product development costs Task activity Information needed Information gathered Means to accomplish task

D EVELOPING C USTOMER R EQUIREMENT AND E NGINEERING S PECIFICATIONS Step #1: Identify the customers Usually more than one customer Can be person who ultimately buys the product Can be another person in your company who may use the device you design Think broadly about the customer Must design what the customer wants, not what the designer thinks the customer should want Recall that the Chief objective of product design is satisfying the customer(s)

D EVELOPING C USTOMER R EQUIREMENT AND E NGINEERING S PECIFICATIONS Step #2: Determine the customers’ requirements Can be interviews, collected by observations, surveys, and focus groups When developing questions for the customer: Do not assume that the customers have more than common knowledge Do not use jargon Do not lead the customer toward the answer you want Do not tangle two question together Use complete sentences

D EVELOPING C USTOMER R EQUIREMENT AND E NGINEERING S PECIFICATIONS Step #3: Determine the relative importance of the requirements (who versus what) Customer’s requirements ranked by giving a weight factor for each requirement. Print or write each need statement on a separate card or sticky note. Eliminate redundant statements Group statements according to similarity Label each group (potential of creating sub-groups)

D EVELOPING C USTOMER R EQUIREMENT AND E NGINEERING S PECIFICATIONS Step #4: Identify and evaluate the competition Creates an awareness of what already exists and reveals opportunities to improve on what already exists Subjective comparison that is based on customer opinion. For each customer requirement, we rate the existing design on a scale of The design does not meet the requirement at all. 2. The design meets the requirement slightly. 3. The design meets the requirement somewhat. 4. The design meets the requirement mostly. 5. The design fulfills the requirement completely. If all competition ranks low for a certain requirement, there is a definite opportunity for improvement If one of the competitors meets the requirement completely, it should be studied as a source of good ideas.

D EVELOPING C USTOMER R EQUIREMENT AND E NGINEERING S PECIFICATIONS Step#5: Generate engineering specifications Goal is to create a set of engineering specifications from the customers’ requirements. These specifications are the restatement of the design problem in terms of parameters that can be measured. May be separated into: Target Specifications - established per the customer needs, broad ranges of values Final Design Specifications – more details based on priority of design criteria Be careful not to include a possible solution to the problem as part of your engineering requirements.

D EVELOPING C USTOMER R EQUIREMENT AND E NGINEERING S PECIFICATIONS Step#6: Relate customers’ requirements to engineering specifications Some parameters will impact more than one customer requirement The relationship can be classified as strong (9), medium (3), weak (1), or no relationship at all.

D EVELOPING C USTOMER R EQUIREMENT AND E NGINEERING S PECIFICATIONS Step #7: Identifying the relationships between engineering requirements Trade offs - Some engineering requirements are affected by others in a positive way (+) or negative way(-). A positive relationship means that pursuing one engineering requirement helps another requirement whereas a negative relationship means that pursuing one engineering requirement hurts another. Goal of this step is to understand how the engineering requirements are interrelated.

D EVELOPING C USTOMER R EQUIREMENT AND E NGINEERING S PECIFICATIONS Step #8: Set engineering targets Each engineering requirement should be given a target Targets are used to evaluate the final product’s ability to satisfy the customers’ requirements. Initial targets may have a tolerance associated with them. If a target is much different than the values currently achieved by the competition, it should be questioned.

A SSEMBLY G ROUP D ESIGN Design concept Group 1: Dustin, Ed, Michael Group 2: Paul, Maria, Adam Group 3: Corey, Ana, Brian Due 3/24 – Presentation to class