1 NASA’s Goddard Space Flight Center 2005/4/14 LRO/CRaTER Technical Interchange Meeting LRO Mechanical Systems Giulio Rosanova / 543 301-286-5907 /

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

Finite Element Analysis and Testing Correlation of the Mercury Laser Altimeter Craig L. Stevens Mechanical Systems Analysis & Simulation.
Mechanical Systems Analysis Branch/Code 542 Goddard Space Flight Center Analysis of Damping Treatments Applied to the MAP Spacecraft Scott Gordon Code.
Innovation You Can Count On™ 1 Payload Integration Wendi Otto Systems Engineer, Pegasus and Taurus Launch Vehicles October 4, 2007 All Information Approved.
Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD FAX
1 Interstellar Heliopause Probe M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010 Interstellar Heliopause Probe (IHP) System Design.
Delta II –7920 Fitup Study Model TMA-56 f10 optics In-Line configuration Delta II Launch Vehicle 7920 H 10L Composite Fairing.
1 GAIA System Level Technical Reassessment Study Final Presentation ESTEC, April 23rd 2002 Part 1b Development & AIV.
Gateway to Space AJ - 1 Mechanical System Design & the StarLight Project Andy Jarski Mechanical Systems Engineer Ball Aerospace & Technologies.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
Systems Engineering for Space Vehicles Bryan Palaszewski with the Digital Learning Network NASA Glenn Research Center Cleveland, OH.
A Finmeccanica Company 04/2000/1 EUSO Development Philosophy EUSO General Meeting Max Planck Institute for Physics Munich, November the 20th 2003.
Level 1 - LRO Requirements ESMD-RLEP-0010
Student Satellite Project University of Arizona Team Goals Design, Fabricate, and Analyze a Structure that will Support the Payload –Space Allocation of.
1 祝飛鴻 衛星結構設計 5/31/ What are key constraints for the spacecraft structure design? 2.How the structure design is affected by other subsystems?
The ESA SME Initiative Training Courses Prof. Paolo Gaudenzi - Space Structures 1 Space mission environments: sources for loading and structural requirements.
C osmic R Ay T elescope for the E ffects of R adiation Telescope Mechanical Design Albert Lin The Aerospace Corporation Mechanical Engineer (310)
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
Verification by test and quality assurance
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
© Lavochkin Association, 2013 Ganymede Lander mission overview.
20a - 1 NASA’s Goddard Space Flight Center Attitude Control System (ACS) Eric Holmes, Code 591 Joe Garrick, Code 595 Jim Simpson, Code 596 NASA/GSFC August.
System issues System decomposition / Product tree System specification: function, performance, interfaces, budget Work-breakdown structure.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
1 Observatory I&T and Launch Campaign Flow Greg Jones May 20, 2009 JWST-PRES
Mechanical SuperNova/Acceleration Probe SNAP Study Dave Peters George Roach June 28, a man who's willing to make a decision in the first place can.
Philip Luers NASA/GSFC Code 561 August 16-17, 2005
Dr. Aprille Ericsson Eric Stoneking June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Attitude Control Systems.
C osmic R Ay T elescope for the E ffects of R adiation 6/27/06 Telescope Mechanical Design1 Albert Lin The Aerospace Corporation (310)
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Search Coil Magnetometer (SCM) Mission PDR/CAR Alain Roux CETP-Velizy Co-i: O.Le Contel Technical Manager:
AAE450 Spring 2009 Support structure for Orbital Transfer Vehicle (OTV) Tim Rebold STRC [Tim Rebold] [STRC] [1]
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
1 衛星結構設計 祝飛鴻 10/26/ Pre-Class Assignment: 1.What are the main functions of spacecraft structure? 2.What factors need to be considered for spacecraft.
C osmic R Ay T elescope for the E ffects of R adiation Mechanical Design CRaTER and the Electronics Assembly Matthew Smith Mechanical Engineer (617)
1 Lunar Reconnaissance Orbiter (LRO) Overview CRaTER PDR 6/27/2005 Craig Tooley.
Henry Heetderks Space Sciences Laboratory, UCB
Final Version Dick Bolt Code 302 May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Success.
NASA’s Goddard Space Flight Center Lunar Reconnaissance Orbiter Ground System Requirements.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
1 衛星結構設計 祝飛鴻 5/25/  What are the main functions of structure subsystem?  Provide support all other subsystems and attach the spacecraft to launch.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
1 System Architecture Mark Herring (Stephen Merkowitz Presenting)
1 Electrical Systems RLEP Avionics Systems Eng. Philip Luers (301) LRO C&DH Lead Quang H. Nguyen
20c - 1 NASA’s Goddard Space Flight Center Propulsion Chuck Zakrwski NASA/GSFC Code 597 August 16-17, 2005.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
LRO SRR LRO Mission Overview.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
1 YamSat Bus Structures Analysis Tsai Ming-Hsien 蔡明憲 2005/03/24 YamSat.
C osmic R Ay T elescope for the E ffects of R adiation CDR v1 Telescope Mechanical Design Albert Lin The Aerospace Corporation Mechanical Engineer (310)
Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.
Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005
Power Philip Luers NASA/GSFC Code 561 August 16-17, 2005.
Telescope - Mechanical
Spacecraft Interface and I&T
Technical Resource Allocations
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
Mini-RF Requirements Overview
Spacecraft Structures
Matthew Smith (617) June 27, 2006 Mechanical Design, CRaTER Assembly and Electronics Assembly Critical Design Review Matthew.
LRO Pointing Allocations
SDO Deployment System Mission PDR
Spacecraft Thermal System
Henry Heetderks Space Sciences Laboratory, UCB
Launch and On-orbit Checkout
LROC Meeting 2005/11/30 LRO CONCEPT-.
Structures March 13, 2004.
Presentation transcript:

1 NASA’s Goddard Space Flight Center 2005/4/14 LRO/CRaTER Technical Interchange Meeting LRO Mechanical Systems Giulio Rosanova / /

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/543 2 LRO Baseline (Deployed 0n Orbit) Propulsion Module High Gain Antenna Avionics Module IM Optical Bench /Radiator Solar Array X (Thrust) Y Z (NADIR)

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/543 3 LRO Baseline (Deployed on Orbit) Instrument Module Propulsion Module Solar Array High Gain Antenna Avionics Module Optical Bench / Radiator X (Thrust) Z (NADIR) Y

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/543 4 LRO Baseline (Stowed) Instrument Module Propulsion Module Solar Array High Gain Antenna Avionics Module

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/543 5 LRO Nomenclature SPACECRAFT BUS ORBITER Propulsion Electrical Mechanical Thermal PROPULSION MODULE Electrical Mechanical Thermal INSTRUMENT MODULE CRaTER Diviner LAMP LEND LOLA LROC INSTRUMENTS HGA Dish Deployables Gimbals Boom HIGH GAIN ANTENNA SYST Solar Cells Substrate Deployables Gimbals Boom SOLAR ARRAY SYSTEM Electrical Mechanical Thermal AVIONICS MODULE SPACECRAFT

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/543 6 LRO Coordinate System Definition THRUST DIRECTION (+X) NADIR (+Z) RHR (+Y) Coordinate Axis Origin Located at center of L/V Separation Plane ZENITH (-Z) Velocity Vector +/- X axis

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/543 7 Mechanical Baseline Design 110 in. (2.8 m) 79 in. (2.0 m) 82 in. (2.1 m)

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/543 8 LRO Launch Vehicle Interface DELTA-II 3-Stage 9.5 ft. P/L Envelope 100” DIA. (2.54m)

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/543 9 Mechanical System Requirements Mechanically Accommodate LRO Instrument Suite Provide Mechanically Stable Instrument Bench for Pointing Requirements Meet Instrument FOV Requirements Provide Thermal Radiator Area for Instruments Provide Orbiter Purge System for Instruments Compatibility with DELTA-II Class Launch Vehicle Instruments shall comply with “LRO Structural Loads and Mechanical Environments Specification” (430-SPEC ) Fairing Doors for Instrument Access on Launch Pad T-0 Purge Available

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/ Mechanical System Requirements Comply with LRO Alignment, Pointing Jitter Budget Instrument Pointing/Alignment Errors Thermal Distortion after Off-Pointing and/or Eclipse, G-Sag High Frequency Jitter –Deployed Structures First deployed Frequency: ≥1 Hz Verify all Mechanical / Structural Designs and Functionality Qualification by Test Use Simulators to Verify Interfaces Provide Orbiter Wiring Mock-Up Instrumenters to provide Hi-Fi Mass simulators for complex Designs –Used for LRO Orbiter Structural Qualification Testing

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/ LRO Instruments INSTRUMENTMASSFOV(R) CRaTER5.60 kg60º Full Angle Nadir & Zenith Diviner9.98 kg160º Full Angle Nadir Centered LAMP5.00 kg40º Full Angle Nadir Centered LEND23.20 kg20º Full Angle Nadir Centered (4) LOLA10.60 kg<<1º Nadir Centered (2) LROC14.40 kgNAC (2)- 60º Full Angle WAC- 120º ct X 30º dt

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/ LRO Fields of View

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/ CRaTER Fields of View

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/ CRaTER Fields of View

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/ CRaTER Fields of View

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/ CRaTER 30ºZ-80ºN Fields of View

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/ CRaTER 30ºZ-80ºN Fields of View

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/ CRaTER 30ºZ-80ºN Fields of View

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/ Instrument Design Requirements Design Limit Load: 12 g’s any axis Minimum Factors of Safety Minimum Frequency Requirement: 35 Hz (50 Hz Recommended) Overall acoustic environment: dB qual, dB acceptance Random Vibration Environment for Instruments and Components

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/ **Total Mass: 2490 lbm (1129 kg) **CG (Origin at center of clampband IF) **Mass Moments of Inertia LRO FEM: Configuration F

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/ Fundamental Mode: Lateral Direction f n = 19.6 Hz f n = 19.9 Hz **Mass scaled to launch vehicle capability (1480 kg)

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/ Fundamental Mode: IM f n = 46 Hz

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/ Mechanical Topics for TIM –CAD Models: (PRO-Engineer), (SOLID-WORKS), (IDEAS) –Identify CRaTER Orientation wrt LRO Coordinate System –Identify Access zones to support testing do you Require? (i.e., sources required for calibration, etc) –Identify Connector Locations and Access/Stay-Out Zones Required? –Identify Optical Reference Surfaces (as required)? Alignment cube/reference mirror surfaces: size, and location? –Identify GSE Handling Points – Will Aperture Doors or Shutter be Considered? –FEA Models: (FEMAP), (NASTRAN)

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/ Mechanical Topics for TIM –Identify your Design Heritage? (have some MLA info) What were the design limit loads? What factors of safety were used? What was the random vibration environment? What was the instrument’s first frequency ? What Analysis Documentation Exists? What Verification Test Reports Exist? Is the instrument sensitive to shock or acoustics? –Do you require Access while on the Launch Pad? –Do you require T-0 Purge at Launch? –Mechanical Mass Simulator Required Simple Designs over 50 Hertz (i.e. LAMP, CRaTER) mass and CG only. –Mass Simulator must be Qualified before Orbiter Structural Testing.

NASA’s Goddard Space Flight Center 2005/4/14 Mechanical Systems Giulio Rosanova/ LRO Mechanical System Development Flow MECHANICAL Design & Analysis Mechanical System Assy. Functional Mechanical Qualification Testing Orbiter I&T MECHANICAL Fabrication Spacecraft I&T PROP. Module (FLT) Build & Proof Orbiter Environmental Testing Launch Activities PROP. Module (PTyp) Build S/C Bus (PFlt) Build Inst. Module (PFlt) Build Deployables (PFlt) Build & Test LRO S/C Subsystems / Components INSTRUMENTS 12/06 9/06 4/07 1/07 10/07 2/08 LRD 10/08 PM Pluming Assy. 10/06 1/07 10/07 7/07 CDR 4/06 7/08 INSTRUMENT MASS SIMS. 12/06