Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Electrical Systems RLEP Avionics Systems Eng. Philip Luers (301)286-5151 LRO C&DH Lead Quang H. Nguyen

Similar presentations


Presentation on theme: "1 Electrical Systems RLEP Avionics Systems Eng. Philip Luers (301)286-5151 LRO C&DH Lead Quang H. Nguyen"— Presentation transcript:

1 1 Electrical Systems RLEP Avionics Systems Eng. Philip Luers Philip.Luers@nasa.gov (301)286-5151 LRO C&DH Lead Quang H. Nguyen Quang.H.Nguyen@nasa.gov (301) 286-5951 LRO Power System Lead Tom Spitzer Thomas.J.Spitzer@nasa.gov (301) 286-4383

2 NASA’s Goddard Space Flight Center 2 Philip Luers / 561 2/15/2005 Proposed Instrument Networks S-Band Ka-Band High-Gain Antenna Solar Array Power & Switching Control High-Rate Low-Rate High-Speed Network Low-Speed Network Servo Drive Thermal Pump Switched Services Battery PSE EVD OM BM SAM Propulsion Analog / Discretes SBC LVPC HIDEC SSR Main Avionics Comm Power Bus ST IMU CSS (8) IRW (4) LOLA LEND LAMP Diviner CRaTER LROC

3 NASA’s Goddard Space Flight Center 3 Philip Luers / 561 2/15/2005 Electrical Systems General LRO Electrical Systems ICD is in review with Systems Team, sent to S/C team last week, main points of interest are: –Power Bus +21 to +35 at LOLA harness connector, multiple wires, non-redundant bus Tolerate 0 to 40 without damage LOLA Instrument KO presentation shows +24 to + 32, is this a problem? –S/C PSE will use SSPC for switching, so there will be inrush specification –Fuses on S/C PSE only –Power bus ripple: 10 MHz) –Isolate primary return from chassis, single-point-ground in S/C PSE –Tie Secondary ground to chassis (< 0.5 milliohms) –Tie all chassis of instrument to spacecraft chassis (<2.5 milliohms) –Copper ground straps (5:1 length:width) where necessary –Blankets redundantly tied to spacecraft chassis 2 ground tabs for 1 m 2, add’l tab for every add’l m 2

4 NASA’s Goddard Space Flight Center 4 Philip Luers / 561 2/15/2005 LROC Accommodations Data –3.5 Mbps, 300 Gbits/day Power Consumption –26.4 watts average, 36 watts peak (with 20% reserves) Timekeeping –1 pulse-per-second RS-422 pulse, active high for 30.5 +/- 1 microsecond –Time at Tone was message to accompany every pulse Discrete commands –None identified Additional Interfaces –Two thermistors will be provided by S/C to be mounted on outside of LROC instrument Yellow Springs Instruments p/n 44907-07S7R6 or equivalent (S311-P-18-05A) and 5 kohm bias resistor for range of -30C to +70C

5 NASA’s Goddard Space Flight Center 5 Philip Luers / 561 2/15/2005 LROC Network Interface SpaceWire –We believe that SpaceWire will have a positive mission-level impact on –Spacecraft ICDs, simulators, and integration and test at the mission level –We have provided documentation to describe the core that would be provided and supported by Code 561 –We would like to hear results of study of Spacewire as primary interface for LROC


Download ppt "1 Electrical Systems RLEP Avionics Systems Eng. Philip Luers (301)286-5151 LRO C&DH Lead Quang H. Nguyen"

Similar presentations


Ads by Google