The Nile Equatorial Lakes Subsidiary Action Program (NELSAP) A New Approach to the Joint Management of River Basins in the NEL Region.

Slides:



Advertisements
Similar presentations
World Bank and SPS With special emphasis on the recently established multi-donor Standards and Trade Facility Cees de Haan Agriculture and Rural Department,
Advertisements

Water policy development in Uganda
Biodiversity Land Degradation Climate Change Chemicals International Waters Sustainable Forest Management Sustainable Cities Food Security Fisheries Forests.
Focal Area and Cross Cutting Strategies – Land Degradation GEF Expanded Constituency Workshop March 22 – 24, 2011 Kyiv, Ukraine.
Doing More With Less: Mitigation in a Changing Environment Experience in the Nile Basin Larry Brazil Riverside Technology, inc. Doing.
Collaborative processes over shared waters Lylia Khennache ENVR-610 Source: Prix Pictet.
Bic river basin management plan and involvement of local authorities in the implementation of the program of measures Dumitru Drumea, Executive Director,
Global Environmental Policy
International Workshop on Institutional Capacity Development in Transboundary Basins November 2008, Bonn, Germany Le Duc Trung Acting Secretary.
1 4 th Rosenberg Biennial International Forum on Water Policy. Transboundary Water Cooperation The Nile Basin Case by Hon. Martha Karua Minister for Water.
Current Context and Evolution towards Institutional Strengthening Nile Basin Initiative International Workshop on Institutional Capacity Development in.
Hydropower Development: Experience of Nepal
Ramsar Convention on Wetlands ( Ramsar Convention on Wetlands ( Convention on Wetlands “The conservation and wise use of.
1 4 th Biennial Rosenberg International Forum on Water Policy Turkey,7-8 th September,2004 Overview of the Nile Basin Initiative Programs. by Patrick Kahangire,
“The Nile Basin Initiative" (NBI) Meraji O. Y. Msuya Executive Director, NBI Secretariat Freshwater Basin Management: Experiences and Lessons Learnt.
Reducing Trans-boundary Degradation of the Kura-Aras River Basin UNDP/Sida United Nations Development Programme Swedish International Development Cooperation.
Nile River Basin Nile Sudd Swamp Blue Nile White Nile
Promoting Energy Efficiency In Buildings in Developing countries.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS AND PROGRAMMES presented by Faizal Parish Regional/Central Focal Point GEF NGO.
04/2007 European Funds in Bulgaria Supported by the European Commission (DG ENV)
Adaptation in Eastern and Southern Africa Supporting ground level and policy change Jo-Ellen Parry, Program Manager
Introduction to the Session 6 - Theme 4 – on “Water Resources Management and Governance”
THE NILE RIVER BASIN : PUBLIC PARTICIPATION CHALLENGES AND OPPORTUNTIES By Aly M. Shady, P.Eng. For Presentation At University of Virginia Law School Charlottesville,
Cross Border Animal Health Plan of Action – Kenya and Uganda Four Strategic areas 1. To improve prevention, management and control of cross border animal.
NILE BASIN INITIATIVE BACKGROUNDByA.M.FARAHAT. THE ISSUE  Nile water agreements between Egypt and the British date back more than 100 years.  Core objective:
1 ADB Support to Transboundary Water Resources Management in Central Asia Hong Wei Country Director Uzbekistan Resident Mission Asian Development Bank.
Addressing water management challenges in Nile Basin  Key to achieving the SDGs 11 countries with total population over 415 Million  doubling every.
National Policy and Strategy for Agriculture, Forestry and Fisheries 15 March, 2004.
Contribution of the Territorial Cooperation Programmes to the EU Strategy for the Danube Region Kiril Geratliev, Director General “Territorial Cooperation.
BIODIVERSITY CONSERVATION, AND ADAPTATION ASPECTS IN NATIONAL STRATEGIES ON POVERTY REDUCTION (NS- PR), SOCIO-ECONOMIC DEVELOPMENT PLAN (SEDP)
Peter Gondo. Session1: INTRODUCTION TO THE NLBI/FOREST INSTRUMENT BACKGROUND AND ORIGIN OF THE NLBI PURPOSE OF THE NLBI G UIDING P RINCIPLES OF THE NLBI.
Regional Technical Cooperation on Water The Nile Basin Case ByA.M.Farahat Prof. INP, Cairo, Egypt Arab Water Council Representative 2 nd IIWF Middle East.
1 Blue Revolution Initiative: Improving Water Management for Health, Prosperity and Security in the Middle East and Asia JOHN WILSON Deputy Director Office.
GEF-6 Programming Directions in Natural Resources Management
EASTERN AFRICA POWER POOL EAPP 5 th Coordination Meeting Of African Regional Power Pools 6 th – 7 th May 2010 Harare, Zimbabwe.
Strategic Planning MRC first Strategic Plan for Revised in 2000: Current Strategic Plan Vision and Mission remain unchanged Goals updated.
APEC ENERGY WORKING GROUP FRAMEWORK PROPOSAL FOR IMPLEMENTING ENERGY INVESTMENT RECOMMENDATIONS (November 2004).
United Nations Environment Programme Regional Cooperation and Coordination Experiences Marieta Sakalian Programme Management/Liaison Officer Biodiversity.
Nile Basin Initiative SOCIO-ECONOMIC DEVELOPMENT & BENEFIT SHARING PROJECT (SDBS)
Christopher Sheldon Senior Mining Specialist Mining Policy Division The World Bank Group Integrating Local Economic Development into World Bank Mining.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
Regional Technical Cooperation on Water The Nile Basin Case ByA.M.Farahat Prof. INP, Cairo, Egypt Arab Water Council Representative 2 nd IIWF Middle East.
Presented by: Dr Sam G. Kanyarukiga CAADP Coordinator -COMESA Presented by: Dr Sam G. Kanyarukiga CAADP Coordinator -COMESA
Sustainable Development Strategy for the Seas of East Asia Submitted by Huming Yu PRESENTATION ON.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS presented by Ermath Harrington GEF Regional Focal Point.
Mohamed Bakarr Senior Environmental Specialist GEF Familiarization Seminar Washington, DC January 17 – 19, 2012 GEF Strategies, Activities and Accomplishment:
Opportunities and Challenges of Water Resources Management in Lao PDR
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
Piloting Integrated Processes and Approaches To Facilitate National Reporting to Rio Conventions – a GEF/UNEP project CBD SBSTTA 14 May 2010, Nairobi,
AU/UNIDO/Brazil High-Level Seminar on Biofuel.  Policies are required to reflect the country’s development vision for the sector  Required to establish.
The Mekong River Commission: Challenges, Mission, and Strategies.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
The Mekong River Commission: Challenges, Mission, and Strategies.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
CDP-GIZ research project – Paris Workshop Gesellschaft für internationale Zusammenarbeit GmbH André Lammerding, Head of Programme International Water Stewardship.
AFRICAN DEVELOPMENT BANK KENYA- SPAIN Multilateral Partnership Meeting Nairobi, 9 December 2013.
PROGRESS IN THE IMPLEMENTATION OF THE LVEMP-I & THE PREPARATION OF THE LVEMP-II PAPER PRESENTED AT THE GEF THIRD BIENNIAL INTERNATIONAL WATERS CONFERENCE.
Strategy Note on Economic Cooperation for Mekong Subregion The World Bank’s contribution to the GMS Water Resources Management March 2007.
OVERVIEW | NBD-Network
Developing reporting system for SDG and Agenda 2063, contribution of National Statistical System, issues faced and challenges CSA Ethiopia.
GEF governance reforms to enhance effectiveness and civil society engagement Faizal Parish GEC, Central Focal Point , GEF NGO Network GEF-NGO Consultation.
STATUS OF LAKE VICTORIA ENVIRONMENTAL MANAGEMENT PROJECT II
Overview of Bank Water Sector Activities
The Role of Bilateral Donors in supporting capacity-building in the area of ICT Open Consultations on Financing Mechanisms for Meeting the Challenges.
Understanding the Global Water Crisis : Lessons from the Nile Basin Dr
LIFE and the implementation of the Water Framework Directive
The Role of Civil Society Forums in International River Basin Management – The Case of the Nile By Dr. Patricia Kameri-Mbote Presented at The Hague.
FAO portfolio under GEF
Presentation transcript:

The Nile Equatorial Lakes Subsidiary Action Program (NELSAP) A New Approach to the Joint Management of River Basins in the NEL Region

Burundi DRC Egypt Kenya Rwanda Sudan Tanzania Uganda Nile Equatorial Lakes Subsidiary Action Program

NELSAP- CHALLENGES High Population Growth and Poverty Economies dependent on rain-fed agriculture Low level of industrialization Environmental threats such as: overgrazing, poor crop cultivation practices, removal of vegetation cover, and uncontrolled development along lake shores and river banks The population within and outside the countries of the basin total about 135 million people Deforestation driven by the demand for wood for household and commercial fuel Recent refugee influxes

NELSAP-Objective As defined by the Nile Equatorial Lakes Minister of Water Affairs (NEL-COM) “To contribute to the eradication of poverty, to promote economic growth, and to reverse environmental degradation.”

Process to establish NELSAP Aspects of project preparation and implementation: planning at the lowest appropriate level involving all who are affected building on principles of equitable utilization, no significant harm, and cooperation benefiting all involved distributing benefits, costs and risks equitably and using available resources efficiently, and protection of the environment.

ROLES AND RESPONSIBILITIES WITHIN THE NELSAP STRUCTURE The NEL-COM © Oversight of NELSAP project portfolio © Policy advice & guidance The NEL-TAC © Review of NELSAP project portfolio © Technical advice and guidance to the NEL-COM The NEL-CU © Facilitating agency & responsible for delivery of NELSAP © Manage information sharing, coordination, etc.

Partners NELSAP ORGANOGRAM

Seven NELSAP PROJECT Identified Within NELSAP the following seven projects have been identified: Enhanced agricultural productivity in five East African countries and the DRC; cost of implementation USD45 million. Management of fisheries and environments of Lakes Albert and Edward; cost USD 15 million. Watershed management of (i) the Kagera, (ii) Mara, and (iii) Sio- Malaba-Malakisi river basins; cost (for all three) USD10 million. Water hyacinth and water weed control in the Kagera; cost USD4 million. Hydropower (Rusumo Falls and ranking and feasibility studies of 50+MW hydroelectric power projects); cost only of preparation USD11 million. Power transmission connections Kenya-Uganda-Rwanda- Burundi-DRC; cost only of preparation USD3.2 million. Support to NEL-CU; cost USD0.7 million for preparation and implementation.

NELSAP outputs An initial set of investment projects prepared, financed & under implementation Demonstrated benefits from cross-border cooperation in poverty-focused development Cooperation at the sub-regional level strengthened and promoted

NELSAP RECENT PROGRESS 1)3 RIVER BASIN MANAGEMENT PROJECTS (Kagera, Mara, and Sio- Malaba-Malakisi) Selection of specialised consultancy firms to assist the RPSCs completed Stakeholder meetings initiated Full Projects funding sought

Kagera River Basin Transboundary Integrated Water Resources Management Project (IWRM)

The overall Project Objective “ To develop tools and permanent cooperation mechanisms for the joint, sustainable management of the water resources in the Kagera River Basin in order to prepare for sustainable development-oriented investments to improve the living conditions of the people and to protect the environment.”

The specific objectives of the project Establishment of a sustainable framework for joint management of the shared water resources of the Kagera River Basin. Development of an investment strategy and conducting pre-feasibility studies. Building capacity at all levels for sustainable management and development of Kagera River Basin Implementing small-scale investment projects

Project components and output Component A: To establish a sustainable permanent framework for joint management of the shared water resources of the Kagera river basin Output A1: A joint transboundary permanent management framework including a management strategy for Kagera river basin established. Output A2: Common procedures for Environmental Impact Assessment developed and agreed.

Component B: Development of an investment strategy and conducting pre-feasibility studies Output B1: A Kagera River Basin Monograph and information management database developed. Output B2: Simple model for assessing development scenarios and selection of a preferred Development Strategy Output B3: Pre-feasibility studies conducted

Component C. Building capacity at all levels for sustainable management and development of Kagera River Basin Output C1: Staff trained at national and basin levels and Basin offices strengthened. Output C2: Community awareness raising about environmental management issues and development options. Output C3: Basin wide sustainable hydro- meteorological network and water quality survey.

Component D: Implementing small scale investment projects Kagera River basin community. Output D1: Identified small-scale projects implemented.

Small Scale Investment Projects (Kagera River Basin Project) 1. Water supply/harvesting systems for people and livestock (4no., one in each country), 2. Cross Border Biodiversity (Basin catchment afforestation) 3. Review of KBO proposal for Navigability of the Kagera River 4. Wetlands Restoration Project 5. Environmental management of Lake Cohoha ecosystems 6. Environmental Awareness Raising in Akanyaru Basin

7. Akanyaru Basin Integrated Management 8. Cross-boarder Power extensions –Muhanga-Mivumba extension (33KV) (15km) (Uganda-Rwanda) –Rubare -Kagitumba extension (33KV) (25km) (Uganda-Rwanda) –Kyotera-Mutukura extension (33KV) (20km) (Uganda-Tanzania) –Rwentobo-Rwizi extension (33KV) (10km) (Uganda-Rwanda) –Bukinda-Kayitumba extension (33KV) (12km) (Uganda-Rwanda)

Long Term Investment projects 1. Rusumo Falls Hydropower Project 2. Community Hydropower systems 3. Making the Kagera Navigable 4. Afforestation in the Kagera Basin 5. Development of Tourism

THANK YOU