A Lessons Learned Discussion of Digital Control Upgrades How to Make Sure Your Digital Upgrade is Over- Budget, Over - Schedule, and Everyone’s Vacation.

Slides:



Advertisements
Similar presentations
Proposal / Request For Proposal Proposal / Request For Proposal Initiation Control Planning Close-down Execution.
Advertisements

MODELING THE TESTING PROCESS Formal Testing (1.0) Requirements Software Design Risk Data Approved, Debugged, Eng. Tested Code Automated Test Tools Tested.
The System Development Life Cycle
Network Design and Implementation
1 Fundamental Principles of Solution Design and Implementation Chapter 3.
Designing new systems or modifying existing ones should always be aimed at helping an organization achieve its goals State the purpose of systems design.
Professor Michael J. Losacco CIS 1110 – Using Computers System Development & Programming Chapter 11.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
7.2 System Development Life Cycle (SDLC)
1 Principles of Information Systems, Ninth Edition Chapter 13 Systems Development: Design, Implementation, Maintenance, and Review.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
DEPARTMENT OF INTELLECTUAL & DEVELOPMENTAL DISABILITIES Project Kickoff Meeting East Regional Office March 7 th, 2013.
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
Leading Edge Climbing Equipment
Chapter 8: Systems Development Please turn your cell phone off.
Pre-Project Activities Text Chapters 5 and 6. Pre-Project Activities 1.Contract Review 2.Development Plan 3.Quality Plan.
PMP® Exam Preparation Course
Presentation Handout EDBA – Module 8 Information Technology 7 th December 2014 By K.M.Prashanthan.
Designing new systems or modifying existing ones should always be aimed at helping an organization achieve its goals The primary emphasis of systems implementation.
Transaction Processing Systems and System Development Life Cycle
Chapter 14 Information System Development
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
16 1 Installation  After development and testing, system must be put into operation  Important planning considerations Costs of operating both systems.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
Advanced Higher Computing SOFTWARE DEVELOPMENT PROCESS.
Principles of Information Systems Eighth Edition
Systems Development: Design, Implementation, Maintenance, and Review
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
CSI-MAXIMUS, Inc CSI Comprehensive Service & Support Implementing the CSI Way.
Screening and Selecting Software. HRIS Project Phases NeedsAnalysis Design & Development Implementation & Maintenance.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
Requirements Traceability Matrix
Capstone Project Phase Two! Design Phase – Functional Specification Document.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
1 Chapter 6 Computer Software. 2 Manager’s View u Manager’s need to understand various kinds of computer software - makes the hardware work for you. u.
Chapter 12 The Network Development Life Cycle
Monthly progress report So far we have completed the following:  weighted decision matrix  scope statement  Business case analysis  team contract 
LTMS 530 Evaluate and Select Products and Applications.
Unit 17: SDLC. Systems Development Life Cycle Five Major Phases Plus Documentation throughout Plus Evaluation…
CMSC 2021 Software Development. CMSC 2022 Software Development Life Cycle Five phases: –Analysis –Design –Implementation –Testing –Maintenance.
Online Clothing Houston Bongard Jennifer Kurata Lori McDonald Tyler Shelton Jane Yune.
Information System Analysis & Design on Pediatrics Office Presented by Team #5 Jie-Soo Hong Youngjoon Kim Rinardi Yu Wu.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
PMP Study Guide Chapter 11: Controlling Work Results.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
Principles of Information Systems Eighth Edition Chapter 13 Systems Development: Design, Implementation, Maintenance, and Review.
The System Development Life Cycle
Principles of Information Systems Eighth Edition
Supporting quality devices
System Design, Implementation and Review
The System Development Life Cycle
Information Systems, Ninth Edition
DPS-7/Espanola E-911 System Upgrade
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Documentation Chris Scanlon and Ritendra Bhattacharya
Principles of Information Systems Eighth Edition
Testing Plan and Status
Chapter # 4 Development and Quality Plans
Lecture-6 Project Management Process Groups
Procedure PP, Project Plan Configuration
Preparing the Proposal
University of Idaho – Interdisciplinary Engineering Capstone Design
ACSC 155 System Analysis and Design 4. Systems Design
Presentation transcript:

A Lessons Learned Discussion of Digital Control Upgrades How to Make Sure Your Digital Upgrade is Over- Budget, Over - Schedule, and Everyone’s Vacation Gets Cancelled

Major Topics 3

Major Phases of a DCS Project 4 Sales/Proposal Phase Management Phase Design Phase Implementation Phase Testing Phase Startup/ Commissioning

What is….. 5

6 The Sales/Proposal Phase Request For Quote Competitive Bid Process Proposals Awarding of Contract Purchase Order

The Management Phase 7 Assemble Project Team Hold Kickoff Meeting Develop Schedule Project Specification Finalized; Requirements Created Develop Plans  Project Management Plan  Quality Assurance Plan  Etc, etc, etc  AND……

The Management Phase (cont…) Slide 8 DESIGN INPUT Examples: Process Description P&ID Drawings Existing Logic and Function Drawings Procedures Alarms, setpoint, scaling information I/O Database

Project I/O Database Slide 9

Project I/O Database Slide 10 Database  I/O Load (Drawings)  Wiring Diagrams  Control Database  New Control Drawings  Software Design Description  Hardware Test Procedure  Site Testing  Process Graphics  Graphic Documentation  Historian  Reporting  Other Systems  Documentation  Software Test Procedure  Site Testing  Site Procedures

The Design Phase 11 BEGIN DESIGN FREEZE Design Input continues END Design Calculations System Design Drawings I/O Database Failure Modes and Effects Analysis Testing Plans Traceability Matrix

The Implementation Phase 12 Application Software Control/Graphics/Historian /Reports Test Cases and Procedures Updated Design Drawings Possible Dry Run Testing

The Testing Phase 13 Pre-Testing (Vendor Test) Factory Acceptance Testing (Customer Test) Corrections and Retest Changes

The Startup/Commissioning Phase 14 YOUR system now