Current Air-Operated Valve Regulatory Activities Steven Unikewicz US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation January 2006.

Slides:



Advertisements
Similar presentations
Update on NRC Low-Level Waste Program – Major Activities Large Scale blending of LLRW -Issued guidance to agreement states for reviewing proposals for.
Advertisements

Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
Transition from Q1- 8th to Q1- 9th edition
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
“Regulatory Risk-Informed Activities and Supporting PRA Technical Acceptability” Presented to Nuclear Energy Standards Coordination Collaborative (NESCC)
Release of Patients Treated with I-131: An Update Michael Fuller Team Leader Medical Radiation Safety Team U.S. NRC.
© November, 2001 LeBlond and Associates, LLC Training Program Overview Produced by LeBlond & Associates, LLC Thanks for taking the time to view this presentation.
Modeling boiling water reactor main steam isolation valve leakage using MELCOR Presented at the 21 st Annual Regulatory Information Conference March 10-12,
Dr. Jose Pires Structural, Geotechnical and Seismic Engineering Branch
NRC PERSPECTIVE ON RELIEF AND SAFETY VALVES Charles G. Hammer Component Performance & Testing Branch Division of Component Integrity Office of Nuclear.
ISTOG MOV TESTING TRANSITION Prepared by: E. Cavey DTE-Fermi 2 Page 1 The GOAL of this effort was to develop implementation guidance for ASME Code Case.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
RIM ) - REWRITE OF SECTION XI, DIVISION II, USING RISK INFORMED METHODOLOGY - FRANK J. SCHAAF,JR, P.E. ASME CHAIRMAN, SWGRIM CONSULTANT, STERLING REFRIGERATION.
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
TELLEFSEN AND COMPANY, L.L.C. SEC Regulation SCI and Automation Review Policy Compliance March 2013 Proprietary and Confidential.
Fermi Case Study Flow Variance ≥ 2% Obtaining NRC relief to allow for use of a 2.78% total flow reference band for Fermi RHR Service Water Pumps ISTOG.
Oconee RPS/ESPS Digital Upgrade Presented by: Michael Bailey June 3,
1 ISTOG Position on Pre-conditioning ISTOG Input on Interpretation and Clarification Of NUREG-1482 Sections 3.5 / 3.6.
Design Bases From 1957 to 2003 June 18, 2007 Chuck Casto Region II NRC.
Regulatory Approach to the Lifetime Management of the Nuclear Power Plants in Korea June 30, 2004 Choi, Kyung Woo Korea Institute of Nuclear Safety International.
NRC Endorsement of Standards
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
DECEMBER 2010 ISTOG MEETING NEW Q & A CARD DISCUSSION.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
A SUMMARY OF CDBI FINDINGS IN SERVICE TESTING OWNERS GROUP December 2010 Clearwater, Florida.
Fatigue Management Rule Russell Smith Nuclear Energy Institute (NEI)
NHUG - Boston - 08/04/20101 Considerations for Operability of Chillers and Chilled Water Systems NHUG Summer Meeting August 4, 2010 Tim Mitchell Component.
ACADs (08-006) Covered Keywords CFR policy, CFR violation, CFR enforcement Description Supporting Material
© 2011 Underwriters Laboratories Inc. All rights reserved. This document may not be reproduced or distributed without authorization. ASSET Safety Management.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
Configuration Management in New Reactor Construction Tom Kozak, NRO/DCIP/CAEB
ISTOG Winter 2010 – Ed Cavey Fermi 2 1 ISTOG Issues - Code Inquiries / Proposed Code Cases ISTOG Issues from 2010 January meeting and subsequent telecons.
1 OM CODE SUMMARY December 2007 (St.Pete Fla.) ISTOG Meeting January 2008.
1 Emerging Issues: Materials and Mechanical Michele G. Evans, Session Chair 2009 RIC.
Regulatory Framework for Uranium Production Facilities in the U.S.
1 CDBI Inspection Insights for 2008 Kelly Clayton Senior Reactor Inspector Engineering Branch 1 Region IV.
1 NEI Process Discussion. 2 Topics for Discussion Relationship to NFPA 805 Relationship to Regulatory Guide Technical Process currently in NEI
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
1 RIC 2009 NFPA 805 Regulatory Infrastructure Development Steven A. Laur, PE Sr. Tech Adv. Risk-Informed Initiatives NRC Office of Nuclear Reactor Regulation.
1 PRA Research to Enhance Decision-Making John Monninger, Deputy Director Division of Risk Analysis Office of Nuclear Regulatory Research, NRC.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
ISTOG INDUSTRY ISSUES Interactive Session Gregg Joss (Ginna Station Vice Chair ISTOG) Ron Lippy (True North Consulting ISTOG Facilitator)
ASME OM CODE CASES Presented by Jeff Neyhard for Ron Lippy Intro 101???
1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Sonya Barnette, DOE-HQ Office of Quality Assurance Policy and.
1 ISTOG QUESTIONS ISTOG QUESTIONS IST Program Plan Submittals to Regulators: Prior to OM-2001, and going back to ASME Section XI, there.
1 Safety factors for periodic safety review for research reactors Group A: SF1 – SF4.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Overview of Risk Informed Inspection Workshop Information IAEA Workshop City,
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
Development Status of Periodic Verification Program for Safety-Related Motor-Operated Valves Shin-Cheul Kang, Sung-Keun Park, Do-Hwan Lee Korea Electric.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
Qualitative and Quantitative Criteria for RIDM Stanislav Husťák Nuclear Research Institute Řež plc, Czech Republic Reliability and Risk Department INFRA.
External Provider Control
Instructor: Lloyd Hancock
CM-101 Configuration Management Fundamentals
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
NRC’s Component Design Bases Inspections
Industry Guidance on Part 21 Evaluation and Reporting
Flooding Walkdown Guidance
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
NRC CM Pilot Inspections Methodology and Results
NRC Cyber Security Regulatory Overview
10CFR50.69 – Approaches/Impacts on Configuration Management Configuration Management Benchmarking Group Summer 2018 Conference Chattanooga, TN Glen.
TRTR Briefing September 2013
License Amendments Patrick Boyle Nuclear Engineer
Presentation transcript:

Current Air-Operated Valve Regulatory Activities Steven Unikewicz US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation January 2006

2 Topics Current Regulations / Guidance NRC Reg Guide Risk Informed IST 10 CFR Recent Events/Current Topics Other AOV related Regulatory Activities

3 Current Regulations / Guidance ASME OM Code of record: 10 CFR 50.55a(b)(2) –2001 Edition through the 2003 Addenda –2004 Edition endorsement expected Jan/Feb 2006 –Scope defined in ISTA 1100 Use of ASME Code defined in 10 CFR 50.55a(f) –ASME Code Class components or equivalent NUREG 1482 Guidelines for Inservice Testing –Revision 1 incorporates guidance to date and ASME 2000A Edition –Revision 0 still valid for 1995 and earlier Editions

4 NRC Reg Guide ASME OM Code Case Acceptability issued March 2003 Conditions placed on certain Code Cases Licensees may use approved OM Code Cases provided all conditions listed in Code Case and Reg Guide are met Risk Informed IST Code Cases - Code Case OMN-3 - Code Case OMN-12

5 OMN 3 Requirements for Safety Significance Categorization of Components using Risk Insights for Inservice Testing RI component Code Cases use OMN 3 to catagorize HSS and LSS components Four (4) conditions proposed on use of OMN 3 –Condition 1: Program must include non-ASME components categorized as HSSC that may not be in current IST program –Condition 2: Decision Criteria must be consistent with Reg Guide 1.174

6 OMN 3 - Condition 3: Defense in Depth and Safety Margin evaluations must be consistent with Reg Guide Condition 4: Implementation of Inservice Testing Program and Performance Monitoring must be consistent with Reg Guide and OMNs 1, 4, 7 and 12

7 OMN 12 Alternative Requirements for IST using Risk Insights for Pneumatically and Hydraulically Operated Valves New AOV/HOV test strategy coupled with risk-informed categorization Used in conjunction with Code Case OMN-3 NRC conditions ensure technical philosophy consistent with Code Case OMN-1 (MOV Code Case)

8 OMN 12 Alternative Requirements for IST using Risk Insights for Pneumatically and Hydraulically Operated Valves Eight (8) NRC Conditions on use of OMN-12 –(1) Include a mix of static and dynamic testing which may be altered when justified by evaluation of test data –(2) Evaluate adequacy of diagnostic test interval which shall not exceed 5 years or 3 RO –(3) Evaluate potential increase in CDF and risk of interval extension to ensure small and consistent with NRC Regulatory Guide and criteria –(4) Degradation rate and capability margin evaluated to ensure AOV/HOV capable of performing design basis functions until next test

9 OMN 12 Alternative Requirements for IST using Risk Insights for Pneumatically and Hydraulically Operated Valves - (5) Capable of performing design basis function until next test - (6) Setpoints based on direct dynamic test information, test based methodology, or grouping with dynamically tested valves - (7) Initial and periodic diagnostic testing to verify setpoints - (8) Evaluate operability of AOV/HOV if valve does not satisfy acceptance criteria

10 Reg Guide Risk Informed IST Same as current IST Program Scope except: Must include Non- ASME Code AOVs / HOVs categorized as high safety significant (HSS ) AOVs / HOVs that are not within the scope of the Code but AOV / HOV program identified - Non ASME Code low safety significant (LSS) AOVs / HOVs - Non-ASME Code LSS Dampers Consider comprehensive activities for related Non-ASME Code HSS Components (eg. Dampers) - March 27, 2000 SONGS SE (Adams ML )

11 10 CFR NRC prepared 10 CFR to risk-inform regulations for treatment of structures, systems, and components (SSCs), including MOVs. 10 CFR categorizes SSCs based on safety significance, and specifies treatment that is intended to provide appropriate confidence in design capability. To provide reasonable confidence that low-risk safety ‑ related SSCs can perform their design ‑ basis functions, proposed 10 CFR replaces special treatment requirements with high-level requirements for (1)design control; (2)procurement; (3)maintenance, inspection, testing, and surveillance; and (4)corrective action.

12 Recent Events/Current Topics It is expected that Sites have fully implemented their AOV JOG Programs - RIS Performance of Safety-Related POV’s Under Design Basis Conditions Recent Inspections have identified lack of Design Basis information at various sites - Air Accumulator Sizing - Underestimation of Thrust

13 Recent Events/Current Topics Failures of valve plugs and loosening of valve parts due to vibration Extended Power Uprates –Replacement of manual valves with AOVs –Follow JOG or QME or prototype testing –Stating manufacture’s experience is not enough Testing – mix of Static / Dynamic techniques

14 Other AOV related Regulatory Activities Continued participation with ASME OM 19, Sub-group on Air Operated Valves – next meeting July 19, 2006 after the ASME/NRC Pump and Valve Symposium Continued participation with ASME OM Code, Sub- section ISTE, Risk Informed Inservice Testing Ninth ASME/NRC Pump and Valve Symposium, July 17 thru 19, 2006, at L’Enfant Plaza Hotel in Washington, DC see for more detailswww.asmeconferences.org/nrcasme9