7/26/01 Online MeetingStu Fuess Online Hardware News  d0olc u Recent hardware problems s Low level of errors in 1 of 4 CPUs, so wanted to get it replaced.

Slides:



Advertisements
Similar presentations
Cisco 6500 E-Series Chassis Up-grade
Advertisements

Hot Plug PCI. 2 PP ppt PCI Hot Plug Objective  To Enable higher availability of file and application servers by standardizing the process of removing.
Linux Clustering A way to supercomputing. What is Cluster? A group of individual computers bundled together using hardware and software in order to make.
Linux Migration GBT e2e Software Review May 3, 2005 Ramon Creager Melinda Mello
Introducing VMware vSphere 5.0
© 2007 Cisco Systems, Inc. All rights reserved.ICND1 v1.0—2-1 Module Summary  Ethernet cables and segments can span only a limited physical distance,
2 © 2004, Cisco Systems, Inc. All rights reserved. IT Essentials I v. 3 Module 9 Advanced Hardware Fundamentals for Servers.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 09/24/2012Prototype Review Meeting.
1 Semester 2 Module 2 Introduction to Routers Yuda college of business James Chen
Cluster computing facility for CMS simulation work at NPD-BARC Raman Sehgal.
Module 9 Review Questions 1. The ability for a system to continue when a hardware failure occurs is A. Failure tolerance B. Hardware tolerance C. Fault.
RHUL1 Site Report Royal Holloway Sukhbir Johal Simon George Barry Green.
Module 3: Preparing for Cluster Service Installation.
UCL Site Report Ben Waugh HepSysMan, 22 May 2007.
Module 13: Network Load Balancing Fundamentals. Server Availability and Scalability Overview Windows Network Load Balancing Configuring Windows Network.
Chapter 7 AC 800M Hardware Course T314.
Ch.2 – Introduction to Routers
Online Systems Status Review of requirements System configuration Current acquisitions Next steps... Upgrade Meeting 4-Sep-1997 Stu Fuess.
D0 Run IIb Review 15-Jul-2004 Run IIb DAQ / Online status Stu Fuess Fermilab.
1 SAM & OLAR. 2 Upon completion of this module, you will be able to: List significant changes to system administration tasks in HP-UX 11i Determine system.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.0 Module 6 Switch Configuration.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.0 Module 6 Switch Configuration Cisco Networking Academy.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.0 Module 6 Switch Configuration.
1 CCNA 3 v3.1 Module 6 Switch Configuration Claes Larsen, CCAI.
© Copyright 2014 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. 3.
The SLAC Cluster Chuck Boeheim Assistant Director, SLAC Computing Services.
Online Update Elliott Wolin JLab 4-Oct Outline Online Data Challenges Networking DAQ JInventory System Farm Manager Counting House, Computers, Databases.
30-Jun-04UCL HEP Computing Status June UCL HEP Computing Status April DESKTOPS LAPTOPS BATCH PROCESSING DEDICATED SYSTEMS GRID MAIL WEB WTS.
CDF data production models 1 Data production models for the CDF experiment S. Hou for the CDF data production team.
SoftPLC In TealwareTM SoftPLC ProcessorsTM Hardbook SoftPLC’s
Jefferson Lab Site Report Kelvin Edwards Thomas Jefferson National Accelerator Facility Newport News, Virginia USA
INDIACMS-TIFR Tier 2 Grid Status Report I IndiaCMS Meeting, April 05-06, 2007.
FLOOR CANDY.
MA8000/EMA12000 Fibre Channel Product Set Storage controllers, cache, batteries: B21 HSG80 RAID Array Controller w/ 256MB Cache B21 HSx80.
Ch.2 – Introduction to Routers
6/26/01High Throughput Linux Clustering at Fermilab--S. Timm 1 High Throughput Linux Clustering at Fermilab Steven C. Timm--Fermilab.
Laboratório de Instrumentação e Física Experimental de Partículas GRID Activities at LIP Jorge Gomes - (LIP Computer Centre)
April 25, 2001HEPiX/HEPNT FERMI SITE REPORT Lisa Giacchetti.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
VLVnT09A. Belias1 The on-shore DAQ system for a deep-sea neutrino telescope A.Belias NOA-NESTOR.
IDE disk servers at CERN Helge Meinhard / CERN-IT CERN OpenLab workshop 17 March 2003.
News from Alberto et al. Fibers document separated from the rest of the computing resources
DØ Online16-April-1999S. Fuess Online Computing Status DØ Collaboration Meeting 16-April-1999 Stu Fuess.
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
June 17th, 2002Gustaaf Brooijmans - All Experimenter's Meeting 1 DØ DAQ Status June 17th, 2002 S. Snyder (BNL), D. Chapin, M. Clements, D. Cutts, S. Mattingly.
Ch.2 – Introduction to Routers CCNA 2 version 3.0 Rick Graziani Cabrillo College.
NSSO NSAS TCE NPI Training Smuggler HP Surestore DS2300 (Smuggler) Self-Pace Training Linda Beard March 4, 2002.
1 EIR Nov 4-8, 2002 DAQ and Online WBS 1.3 S. Fuess, Fermilab P. Slattery, U. of Rochester.
DØ Online Workshop3-June-1999S. Fuess Online Computing Overview DØ Online Workshop 3-June-1999 Stu Fuess.
The 2001 Tier-1 prototype for LHCb-Italy Vincenzo Vagnoni Genève, November 2000.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
SA1 operational policy training, Athens 20-21/01/05 Presentation of the HG Node “Isabella” and operational experience Antonis Zissimos Member of ICCS administration.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
RAL PPD Tier 2 (and stuff) Site Report Rob Harper HEP SysMan 30 th June
D0 Farms 1 D0 Run II Farms M. Diesburg, B.Alcorn, J.Bakken, R. Brock,T.Dawson, D.Fagan, J.Fromm, K.Genser, L.Giacchetti, D.Holmgren, T.Jones, T.Levshina,
PHENIX DAQ RATES. RHIC Data Rates at Design Luminosity PHENIX Max = 25 kHz Every FEM must send in 40 us. Since we multiplex 2, that limit is 12 kHz and.
1 CCNA 2 v3.1 Module 2 Introduction to Routers Claes Larsen, CCAI.
Hans Wenzel CDF CAF meeting October 18 th -19 th CMS Computing at FNAL Hans Wenzel Fermilab  Introduction  CMS: What's on the floor, How we got.
Geoff Savage 21 March 2016 ANNIE Online Architecture.
10/18/01Linux Reconstruction Farms at Fermilab 1 Steven C. Timm--Fermilab.
EXIT IP600 Overview Avaya IP600 Internet Protocol Communication Server.
Geoff Savage 21 March 2016 ANNIE Online Architecture.
Geoff Savage 20 April 2016 ANNIE Online Architecture.
Redundancy in the Control System of DESY’s Cryogenic Facility. M. Bieler, M. Clausen, J. Penning, B. Schoeneburg, DESY ARW 2013, Melbourne,
1 © 2004, Cisco Systems, Inc. All rights reserved. CCNA 2 v3.1 Module 2 Introduction to Routers.
Bernd Panzer-Steindel CERN/IT/ADC1 Medium Term Issues for the Data Challenges.
Joint AGLT2-MWT2 Networking meeting
Call to Fix Lexmark Firmware Error
Presentation transcript:

7/26/01 Online MeetingStu Fuess Online Hardware News  d0olc u Recent hardware problems s Low level of errors in 1 of 4 CPUs, so wanted to get it replaced s But… ran into problems with the Console Serial Bus, used at POST time and firmware loads –Think there’s a pinched ribbon cable, but not sure –Cold starts might still be troublesome s While diagnosing, updated to latest firmware release –But that itself was problematic – see above s Firmware noted as supporting new PCI I/O Riser modules –Which were cause of concern when we bought d0olc –Investigated “new” module s Silver lining… there is a potential performance enhancement

7/26/01 Online MeetingStu Fuess Online Hardware News  Level 3 network u New VRCs, ETG/SB, and NT Farm nodes on a new “private” Gb network s Should support > 200 Hz s “Private” because this is 1000baseT (copper) and we have only Fiber ports on Cisco 6509 s But limited # ports (12 in each of two switches) u Monitoring available on the web  Linux nodes u Have requisition in place for 10 new nodes s Rack mounted, identical to Linux L3 nodes u Disposition: s 1  FRHL7 build machine s 3  DAQ s 1  Luminosity s 5  EXAMINE (1 is Trigger EXAMINE)

7/26/01 Online MeetingStu Fuess Online Hardware News  Storage u Plan on ~ 280/2 Gbyte added to FC RAID array s For databases…  And that’s the end of the $$$ u More Control Room nodes, flat-panel monitors, etc will have to wait for future FY or collaboration “donations”