Overview of HMS Facility Planning Educational Specifications Committee November 16, 2005 Educational Specifications Committee November 16, 2005.

Slides:



Advertisements
Similar presentations
North American Mechanical Inc. School District of Cambridge A Business Relationship Presentation Use our energy to save yours®
Advertisements

COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
TYPES OF MECHANICAL SYSTEMS
Heating Systems Forced Air Systems.
Controlling Sutardja Dai Hall Andrew Krioukov Stephen Dawson-Haggerty, Jay Taneja David Culler.
Comparing New Building Pre-Construction and Post Occupancy Energy Models with Actual Performance 2014 CA Higher Education Sustainability Conference – Session.
Current Project Update October 25th 2012 Good Evening!!!
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Innovative Air Distribution for Healthcare Facilities.
 Mechanical  Electrical  Safety/Security  Video surveillance  Fire safety  Access control  Enhanced Programming  Roofing/Structural/Site Work.
Information Technology Development Center FLAGLER COUNTY FLORIDA ENGAGING IN THE WORLD WIDE ECONOMY.
STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
Barnstable Public Schools Integrated Preschool Presentation Town Council Meeting November 20, 2014 Phases II and III.
Building Renovations and Improvements College Park Church is engaged in major Renovations and Improvement of its building. This is the first large renovation.
Interim Facilities Report Quincy Public School District #172 September 25, 2013.
Why We Need It?  Lack of Space  Need to Meet Code Requirements  Inadequate Communications & Technology  Facility Maintenance Issues.
Franklin County Technical School Performance Contract Project.
Tuesday, October 2, 2012 MSS Room #1.  The Leadership Team has not had a formal discussion about HSD facilities.  Individual discussions have taken.
(1/24 and 1/27) Bellwork: 1)List 2 things we’ve discussed this semester 2)What is one positive thing you’d be willing to share?
Auburn University Facilities Prioritization Process Each college will submit up to five projects annually – Ten this first year Projects must cost $50,
Cost of Building: $30 Million Completed: Spring 2005.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
APRIL 2, Superintendent proposes to consider construction of new administration building to Board May 2010 Board gives approval to begin search.
After studying this unit, you will be able to: Interpret architectural drawings Describe how computers can assist in understanding house plans Organize.
November 6 th Referendum Information School District of Horicon.
Comfortable homes that save the world Sustainable Environmental Economic Development October 27, 2007 Don Otto dpoconstruction.com Don Otto dpoconstruction.com.
TML: 2012 and Beyond thomasmemoriallibrary.org. TML: 2012 and Beyond thomasmemoriallibrary.org Thomas Memorial Library Library Improvement Program An.
Where We Are, And How We Got Here Somersworth School District November 27, 2007.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
BUILDING PROJECT AND THE FEASIBILITY STUDY August 20, 2012 Wachusett Regional High School MOUNTVIEW MIDDLE SCHOOL.
ADDITION & REMODEL Eugene Field Elementary School.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
A LL D ULLES A REA M USLIM S OCIETY. ADAMS CORE VALUES.
Name of Building(s) or Project Speaker(s) Organization(s)
©2009 Strang, Inc. Orchard Ridge United Church of Christ September 20, 2009.
HVACR416 - Design Heat Loss / Heat Gain Part 1. Why? The primary function of Air Conditioning is to maintain conditions that are… o Conductive to human.
School Consolidation Public Information Session New Hartford Board of Education.
School Directory Insert picture of School here.. Table of Contents Superintendent/ Principal - Office Staff Superintendent/ Principal - Office Staff Kindergarten.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
This School is Cool! Presented By Jim Turner Fred Johnson Janet Lee.
GRES Education. The goals of the GRES Education program are to: help school districts reduce energy use, conserve water, and minimize waste production.
Flood Athletic Center Woong June Chung Penn State University Mechanical Option Thesis Advisor : DR. Willam Bahnfleth, P.E.
MIDDLE SCHOOL PROGRAM ADJACENCIES Note: The functional relationships illustrated are diagrammatic only. Further interpretation of these relationships shall.
Overview of MSS Facility Planning Educational Specifications Committee November 16, 2005 Educational Specifications Committee November 16, 2005.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
CASE STUDY: CHAPMAN GRADUATE SCHOOL OF BUSINESS IND 5615 – Building Systems for Interior Designers ASSIGNMENT 4 - PART I & II SEPTEMBER 7, 2010 FRANCINE.
Objectives Talk about the final projects Guest Speaker Discuss HW2 and HW3 problems.
R.E. Subcommittee on Growth – Jan workshop What are the triggers points where changes are needed to the program / class configurations? Sanctuary.
Energy Conservation Building Upgrades Alma School District.
Wahoo Public School District Facility Planning Update April 18, 2016.
SCHOOL #1 BALLOT QUESTION AND PROPOSAL Fall, 2016.
HVAC Replacement Case Study
Capital Projects Requests
Cornwall Central School District
TOT SPOT proposal.
School #1 Ballot Question and Proposal
Northwest Hospital Childbirth Center Planning
Northwest Hospital Childbirth Center Pre-submittal Meeting
1315 E. Cary Street FOR LEASE First Floor Suite Richmond, VA 23219
Demmer Library Mission Statement
Recent Bond Accomplishments
Chimacum District Facility & Program Plan
Stoughton Public Library
Dixon Middle School Project Update
Presentation transcript:

Overview of HMS Facility Planning Educational Specifications Committee November 16, 2005 Educational Specifications Committee November 16, 2005

Overview of Proposed Changes  Additional classroom space  New office space  Ventilation/Circulation system upgrade  Replacement of single-pane windows  Increased storage  Additional classroom space  New office space  Ventilation/Circulation system upgrade  Replacement of single-pane windows  Increased storage

Additional Classroom Space  As the result of the recent addition of preschool, HMS has become crowded.  The special education space is tighter.  The reading team is utilizing a space designed for storage.  The custodians lost their office.  Preschool is now in a small space originally designed for the Learning Center.  As the result of the recent addition of preschool, HMS has become crowded.  The special education space is tighter.  The reading team is utilizing a space designed for storage.  The custodians lost their office.  Preschool is now in a small space originally designed for the Learning Center.

Thus, educationally speaking…  The addition of an extra classroom would allow either preschool or another class to inhabit new space.  It would allow the special education personnel to finally be able to utilize proper office space and allow for extra instructional space for one-on-one situations.  It may provide extra storage space that is greatly needed.  We may be able to move the Reading Team back into space not designed for storage.  The addition of an extra classroom would allow either preschool or another class to inhabit new space.  It would allow the special education personnel to finally be able to utilize proper office space and allow for extra instructional space for one-on-one situations.  It may provide extra storage space that is greatly needed.  We may be able to move the Reading Team back into space not designed for storage.

New Office Space  The reception area in the HMS office is minimal.  The Nurse’s Office is exceedingly small and inadequate, lacking privacy and bathroom facilities.  HMS has no functional conference room with privacy. There is no space for more than six adults comfortably.  The reception area in the HMS office is minimal.  The Nurse’s Office is exceedingly small and inadequate, lacking privacy and bathroom facilities.  HMS has no functional conference room with privacy. There is no space for more than six adults comfortably.

Thus, educationally speaking…  We would build an office space of approximately 1650 square feet.  Principal’s Office: 200 square feet  Nurse’s office: 250 square feet  Conference Room: 350 square feet  Administrative Asst. and Core space: 600 square feet  Storage: 250 square feet  We would build an office space of approximately 1650 square feet.  Principal’s Office: 200 square feet  Nurse’s office: 250 square feet  Conference Room: 350 square feet  Administrative Asst. and Core space: 600 square feet  Storage: 250 square feet

Ventilation/Circulation System Upgrade  Our Heating and Ventilation system consists of air circulation of about 10 CFM in classrooms and common areas.  The school building standard is 21 CFM.  Cubic Feet Per Minute (CFM): A unit of measurement. The volume or rate of airflow.  Our Heating and Ventilation system consists of air circulation of about 10 CFM in classrooms and common areas.  The school building standard is 21 CFM.  Cubic Feet Per Minute (CFM): A unit of measurement. The volume or rate of airflow.

Other HVAC options  Air conditioning to the library or other second floor areas.  Digital system for boilers and mechanical systems to improve operational efficiency and control  Air conditioning to the library or other second floor areas.  Digital system for boilers and mechanical systems to improve operational efficiency and control

Thus, educationally speaking…  The upgrade of our HVAC system would be much healthier for both adults and children. We currently have sub par air circulation.  We are likely to save money over time with a more efficient system  The upgrade of our HVAC system would be much healthier for both adults and children. We currently have sub par air circulation.  We are likely to save money over time with a more efficient system

Replacement of Single-Pane Windows  Our older, second floor section has very old and inefficient windows  Replace these windows as well as the windows by the music room entrance.  For example, fuel costs:  HMS: $14,963 or $.32/sq. ft.  HMHS: $18,773 or $.25/sq. ft.  Our older, second floor section has very old and inefficient windows  Replace these windows as well as the windows by the music room entrance.  For example, fuel costs:  HMS: $14,963 or $.32/sq. ft.  HMHS: $18,773 or $.25/sq. ft.

Thus, educationally speaking…  The replacement of these windows…  Will result in major cost savings over time.  Will allow for temperature to be much more even throughout the building  The replacement of these windows…  Will result in major cost savings over time.  Will allow for temperature to be much more even throughout the building

In conclusion…  Additional classroom space  New office space  Ventilation/Circulation System Upgrade  Replacement of single-pane windows  Increased storage  Additional classroom space  New office space  Ventilation/Circulation System Upgrade  Replacement of single-pane windows  Increased storage