0 PRIIA 305 Technical Subcommittee PRIIA Executive Board Meeting March 10, 2010.

Slides:



Advertisements
Similar presentations
1. Welcome New APTA Members! APTA s History 3 Who Are APTA Members?
Advertisements

Please Sign In! IDOT requires verification that attendees arrived on time for the Vendor Conference. You will also be asked to sign out.
TTI Passenger Rail Research Overview Curtis Morgan Program Manager, Rail Research Texas A&M Transportation Institute (TTI) January 25, 2013.
Bi-Level Car Procurement Status Report
Section 305 Technical Subcommittee Boston, MA: June 14, 2014.
Section 305 Technical Subcommittee Chicago IL June 22 nd 2011.
Amtrak is a registered service mark of the National Railroad Passenger Corporation. The Train Is Part of the Vacation Experience The Amtrak Experience.
Standardization Working Group Report
Operational Issues for Rail Projects APTA Legal Affairs Seminar 2008 Janie Sheng K&L Gates LLP (202)
1 Passenger Rail Solutions – Balanced Approach 2009 Ark-La-Tex Rail Summit May 9, 2009 – Marshall, TX Joe Adams, Vice President – Public Affairs.
1 SCORT 2010 September 21, 2010 David Valenstein Federal Railroad Administration State Rail Planning.
Independent Review of NGEC Standardization Process.
The BGA Apollo Clean Transportation Manufacturing Action Plan  Modern Transit  High Speed Rail  Clean Freight Movement  Make it in America!
Office of Research and Development | Office of Railroad Policy and Development Dr. John Tunna Director Office of Research & Development Office of Railroad.
California Passenger Rail Summit April 29, 2015 LOSSAN Pacific Surfliner Rail Service Update.
Section 305 Technical Subcommittee Progress Report Mario Bergeron-Chairman Dale Engelhardt-Vice Chairman Charlotte, NC September 15, 2011.
Railroad 101 Equipment April 9, Next Generation Corridor Equipment Committee  Established by Section 305 of the Passenger Rail Investment and Improvement.
California State Rail Plan Overview Presentation Tribal Informational Meeting – March 1,
Treasurer Paul Andersen. Summary 2011 Draft Financial Results 2012 Q1 Unaudited Results Reserves Fees.
Nominations Needed for the Ballot. All Potential Candidates Must Meet the Following: O Held membership in the state and national associations.
April 29,  Investment in new and improved services, with a strong focus on customer experience  Investment focused on improving efficiency  Shorter.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
PRIIA Section 305 Next Generation Equipment Pool Committee Ken Uznanski Amtrak Policy and Development SCORT National Meeting September 21, 2010.
Intercity Rail Background/ Statewide Freight and Passenger Rail Plan Update Met Council TAC Meeting November 5, 2008.
RAIL SAFETY UPDATE Paul Worley, CPM Director, NCDOT Rail Division September 24, 2013.
A M O T I A A N N U A L M E E T I N G 2 3 S E P T E M B E R N A S H V I L L E, T N 1 A View from the State DOTs Joung H. Lee Associate Director.
North Carolina Rail Division Staff of about 50 Mission to: Improve & expand passenger rail service Improve safety at crossings Provide industrial access.
Cooperative Research Programs Transportation Research Board 1 Transportation Research Board National Cooperative Rail Research Program AASHTO Standing.
Financial Subcommittee Report February 15, Identify options for funding new equipment. Tasks include: Identify and evaluate potential sources of.
RSAC Engineering Task Force Results PRIIA 305 Technical Sub Committee April 22, 2010 Chicago, Illinois Robert Lauby & Eloy Martinez 1.
RAIL PLANNING IN COLORADO SCORT – September 17, 2012 Portland, Maine.
The Future of Freight and High Speed Rail in Today’s Economy SASHTO Annual Conference – Biloxi, MS Shayne Gill Program Manager Aviation, Passenger Rail.
Treasurer’s Report February 23, Section 305 Next Generation Equipment Committee Approved Grant Revision April 1, 2011 to March 31, 2012 In thousands.
2010 Next Generation Corridor Equipment Pool Committee Steve Patterson and George Howell October 20, Preliminary Considerations -
Treasurer’s Report February 15, Section 305 Next Generation Equipment Committee Estimated Expenses January 1, 2010 to March 31, 2011 Executive Committee.
Candidate for Standardization Pilot Program - Status Report September 27, 2011 Michael Burshtin, Standardization Coordinator Dale Engelhardt, Vice Chair.
Michigan Accelerated Rail Service Passenger & Freight Director Kirk T. Steudle, P.E. Michigan Department of Transportation Faster, Better, Cheaper, Safer,
PRIIA 209 Equipment Capital Working Group Ron Pate, Director Cascades Rail Corridor and Washington State Department of Transportation Rail Division.
0 PRIIA 305 Technical Subcommittee Conference Call March 4, :00 pm ET.
PRIIA 305 Diesel Electric Locomotive Specification Independent Review Larry Salci February 15, 2011 Washington, D.C.
Nathan Smith Co-Project Manager California State Rail Plan March 7, 2012.
CHAPTER 17 RAIL PASSENGER SERVICES IN U.S..
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
NGEC, moving forward Next Generation Equipment Committee October 24, 2014.
AASHTO Standing Committee on Rail Transportation Partnering with Suppliers September 21, 2009.
Positive Train Control The impact of legislative changes SCORT Chris Heald September 22, 2009.
FRA Presentation to PRIIA 305 Tech Subc 22 Apri Kevin Kesler Equipment & Operating Practices Division PRIIA Section 305 Next Generation Passenger.
Higher Speed Rail: How Soon? Key Regulatory & Transactional Issues Kevin M. Sheys
Section 305 Technical Subcommittee Progress Report Dale Engelhardt-Acting Chairman Washington, DC Feb. 21,
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
Fire Service Fleet Managers’ Conference 31st May 2006 Terry Brewer Chief Executive Officer Fire Engineering and Procurement for a Risk Based Future.
PRIIA 305 Technical Subcommittee Systems Engineering Processes for Passenger Equipment Acquisition and Life Cycle Support Presented at: NGEC Executive.
Next-Generation Equipment Committee Executive Board
NCHRp Report 773 Capacity Modeling Guidebook FOR SHARED-USE PASSENGER AND FREIGHT RAIL OPERATIONS A project to develop guidebook for DOT’s, Public Agencies.
Michigan Update Michigan Association of Rail Passengers
OVERVIEW: POSITIVE TRAIN CONTROL (ptc)
Section 305 Technical Subcommittee Progress Report
Next-Generation Equipment Committee Executive Board
Freight Rail Policy Division
Update on NGEC Accessibility Working Group
Passenger ECP Brake Equipment
PRIIA Section 209 States Working Group/Amtrak Update
Status Update Jeff Gordon FRA
Next-Generation Equipment Committee Executive Board
Finance & Administrative Sub-Committee & Treasurer’s Report
NGEC Executive Board Chairman’s Report
Cooperative Rail Research at TRB
Candidate for Standardization Pilot Program - Status Report
Report of the Technical Subcommittee
NGEC Executive Board Meeting
Presentation transcript:

0 PRIIA 305 Technical Subcommittee PRIIA Executive Board Meeting March 10, 2010

1 PRIIA 305 Technical Subcommittee Agenda – Membership – Work Plan – Budget

2 PRIIA 305 Technical Subcommittee Membership Mario BergeronAmtrak Dale EngelhardtAmtrak Steve FretwellDOT, California Bob HaslamDOT, California Stan HunterDOT, California Kevin KeslerFRA Kevin LawsonDOT, Louisiana Jack MaddenDOT, New York Eloy MartinezFRA Tammy NicholsonDOT, Iowa Alan Paul DOT, North Carolina Charles PoltensonDOT, New York George WeberDOT, Illinois Gil WilsonDOT, Texas Andrew WoodDOT, Washington

3 PRIIA 305 Technical Subcommittee Background –Passenger Rail Investment and Improvement Act (PRIIA) of 2008 –Freight Standards have contained costs and improved performance –APTA Passenger standards have focused on safety, not design –“Amtrak is tasked with establishing a Next Generation Corridor Equipment Pool Committee to design, develop specifications for, and procure Standardized next-generation rail passenger equipment” (From FRA Summary of Public Law Division B TITLE III— INTERCITY PASSENGER RAIL POLICY )

4 PRIIA 305 Technical Subcommittee Challenges and Opportunities Challenges Opportunities No domestic suppliers Reduced cost Proprietary designs Improved performance Few Standards Interchange Equipment Small Technical Community Pool Purchases Domestic Designs & Mfg New Jobs New Exports

5 PRIIA 305 Technical Subcommittee Work Plan Specification Development Proposed Deliverable Vehicle TypeDelivery Date –Short Haul Bi-Level Coach Car July 2010 –Short Haul Single Level Coach Car December 2010 –Diesel LocomotiveDecember 2010 Standards Performance Interoperability Design Standards

6 PRIIA 305 Technical Subcommittee Sources for Standards AAR, APTA, FRA Amtrak Foreign Standards Railroad/ State DOT Recommendations Manufacturer Recommendations Initial Standard Items Basic Commuter/ Intercity Coverage Car Shells Diesel Locomotive 125 mph) Wheel Sets Trucks Brakes Windows HVAC

7 PRIIA 305 Technical Subcommittee Bi-Level Alternatives 1.Create Low & High Clearance Bi-Level Designs –Necessary to Meet Different Clearance Requirements –Maintain Requirements for Different Markets & Needs –Can Have Common Component Specifications –Allows CA Surfliner Process to Continue 2.Standardize Existing Bi-Level Specification –Commonality of Specifications –May Compromise Different Market’s Requirements

8 PRIIA 305 Technical Subcommittee Platform Height Train Passageway Clearance Potential Common Specifications Trucks Windows HVAC Seats Doors Couplers Wheel Slip Battery Chargers Rest Rooms High (Surfliner) & Low Clearance Bi-Level Vehicles:

9 PRIIA 305 Technical Subcommittee Work of Technical SubCommittee –Define Membership –Held Initial Conference Call –Set Weekly Call Frequency –Establish April 22 Meeting Date in Chicago –Members Provided Biography Material –Industry Participation Request Letter Drafted

10 PRIIA 305 Technical Subcommittee Next Steps –Position Resources (Amtrak) –Organization of SubCommittee -Weekly Conference Calls -Define Output, Timeframes, Charter -Identify target components/ subsytems/ features for standards -Assign working groups to develop/ identify candidate draft standards -Service types (ie.- speed, distance) -Key Components / Subsytems –Review Procurement Alternatives –Technical SubCommittee Meeting: -Chicago, April 22 -Team Membership Attendance -Industry Attendance

11 PRIIA 305 Technical Subcommittee preliminary

12 PRIIA 305 Technical Subcommittee Budget Items: – Amtrak ~ 3 FTEs: -Technical development specifications -Logistic Support – Travel – Technical Consultants – Administration – Large meeting conference room – Conference fees – Other