RIO GRANDE ELECTRIC COOPERATIVE, Inc. Eagle Ford Consortium Conference April 22, 2014.

Slides:



Advertisements
Similar presentations
Distributed Generation (DG)
Advertisements

ACMA Conference February 8, 2007 Evaluating Investments in Infrastructure Panel Overview of Public Infrastructure Financing in the City of Phoenix.
Exhibit A and B Duane Fournier Utilities Regulation Engineer Safety and Engineering Section (515)
Small Wind and Solar Systems Kristi Robinson Steele-Waseca Cooperative Electric.
CONFIDENTIAL Northwest Pipeline Grant Jensen Security Conference Grant Jensen Security Conference.
AQUA America, Inc. AQUA Texas, Inc.. AQUA TEXAS, Inc. – Company Profile Aqua Texas, Inc. is a subsidiary of Aqua America, Inc., the largest U.S.-based.
12” Segment “A” 12” 16” Rockin J (Rancho del Lago) HH RANCH PROPERTIES, L.C. Request for TWA Wholesale Water GLENBROOK PARTNERS, LTD. Request for TWA Wholesale.
The coming storm: Managing Roanoke’s Stormwater Infrastructure Challenges Solutions for Roanoke’s future.
EAGLE FORD CONSORTIUM Presented by Robert D. (Bobby) Waid Manager of Special Projects April 22, 2014.
Utility Extension Project
The Paso del Norte Watershed Council Promoting ecosystem health and economic sustainability in the Paso del Norte Watershed.
OPERATING IN THE EAGLE FORD SHALE
Distributed Power Systems ELCT 908
Interconnection of Distributed Generation
Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
Lake Columbia Water Supply Reservoir Project TWCA March 4, 2010.
AZ APA Conference September 29, 2011 Solving a Solar Land Use Issue Bruce Plenk, City of Tucson Solar Energy Coordinator.
Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Charles Hosken, General Manager Imperial Irrigation District
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
DOE Energy/Water Interdependency TTX Steve Lewis Georgia Power Company April 25, 2007 “Electricity Systems Overview”
LG&E & KU Kevin Lewellen – Group Leader – Asset Information Verl Logsdon – Lead Facility Records Technician.
Southern Delivery System NSPE-Colorado State Meeting February 19, 2010.
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
Electric Transmission Siting, Permitting and Land Acquisition Energy and the Economy Summit June 26, 2013.
Moving Towards A Gigabit State May 4, 2015 Broadband Inventories.
1 ENCO Utility Services How Could a Boulder Municipal Utility Run Its Electric Distribution System? June 1, 2011 Boulder, Colorado
S.A.V.E. is a non-profit community organization whose aim is to sustain the southern Chester County region’s rural quality of life and community character.
Katy Freeway 40 mile section of IH 10 from downtown Houston to the Brazos River Constructed in the 1960’s Design capacity of 79,200 vehicles per day –Pavement.
Water Administration and Law in New Mexico Border Governors October 21, 2005 Marilyn C. O’Leary Utton Transboundary Resources Center University of New.
Capital Financing for Energy – Related Projects George Williams, SVP and Chief Operating Officer El Paso Electric Company May 20, 2010.
Project Oasis West Des Moines, Iowa Presentation January 30, 2013.
1 Technical Assistance - PTAB Selecting and Hiring the Design Professional Dave Maxwell, P.E. Chairman, New Mexico Professional Technical Advisory Board.
September 5,  Mission - To provide Excellent Service to Our Distribution Members by creating opportunities, cultivating cooperation, and navigating.
Wyoming Pipeline Authority Public Meeting January 15, 2008 A Spectra Energy Proposal.
Using a Dispersed Strategy in Your Region By Mike Michaud Matrix Energy Solutions Edited and Presented By Brian Antonich Windustry.
Transformative Opportunities Raise the per capita income within the Shale  Alamo WDA  Coastal Bend WDA  Golden Crescent WDA  Middle Rio Grande WDA.
The Lower San Pedro Valley and Aravaipa: Worthy of Protection.
Energy. Goals Help protect the environment and increase community economic efficiency by promoting alternative energies, specifically solar panels and.
Entrega Project Update Wyoming Natural Gas Pipeline Authority – August 30, 2005 Entrega Gas Pipeline Inc.
Pecan Street Project Inc.. Two energy economies ElectricityTransportation Percentage from petroleum: 0.6 percent Percentage not from petroleum: 0.3 percent.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
ITTS Freight in the Southeast Conference Charlotte, North Carolina February 9, 2011.
Data Center Facility & Services Overview. Data Center Facility.
Raw and Finished Water System Improvements April 22, 2014.
Natural Gas and Energy Reform Legislation Steve Crout Managing Director, Government Affairs American Gas Association.
Agency Proposal Title Proposal Focus EBID Flow Metering and Data Collection Project Flow measurement at EBID’s canals and turnouts (water delivery system).
Residential Plats Orange County Board of County Commissioners August 19, 2014.
Request for Proposals from the Department of the Interior, Bureau of Reclamation Water 2025 Western Water Initiative Challenge Grant Program for.
Distributed Generation Registration June 30, 2008.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
Jeff Billo Manager, Transmission Planning
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Offered at $3.7-million A natural tapestry in a desert setting.
Trade Transportation Activities Report Bill Frawley, TTI 2012 Border to Border Transportation Conference South Padre Island, TX November 14, 2012.
Mountain Regional Water Rules & Regulations Overview.
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
Florida Keys Electric Cooperative Association, Inc. Storm Hardening Florida Public Service Commission May 1, 2008 Scott Newberry, CEO John Stuart, COO.
City of Buda ElectroPurification Water Supply Evaluation Drew Hardin, PE Council Workshop - January 20, 2015.
Fall River Electric Infrastructure in Island Park Bryan Case, CEO.
JEA’s Initiatives and Capital Improvements Program
Agricultural Water Conservation Grants: Current Investments & Future Opportunities Winter Season Outlook and Impacts Forum for Agriculture in the Lower.
POWER FOR WATER: Meeting Infrastructure Needs
BPA Overview BPA is part of the U.S. DOE, but it is self-funded and covers all of its costs by selling products and services. Congress created BPA in 1937.
Southern Delivery System
City of Sunrise Wastewater Reuse Program
Presentation transcript:

RIO GRANDE ELECTRIC COOPERATIVE, Inc. Eagle Ford Consortium Conference April 22, 2014

Topics 1.About Rio Grande Electric Cooperative 2.Service territory as related to Eagle Ford region 3.Local area offices and contact information 4.General electrical services offered 5.Typical electrical services for oil & gas industry 6.Business information and process 7.Challenges faced serving the Eagle Ford Shale

Rio Grande Electric Cooperative “Owned by Those We Serve” Organized: 1945 Headquarters: Brackettville, Texas - Kinney County Service Territory: 35,000 sq. miles along Rio Grande River Memberships: 6,222 members with 12,950 meters Meter Density: 1.34 average meters per mile of line

Rio Grande Electric Cooperative RGEC provides electric service to: –18 counties in Texas –2 counties in New Mexico –3 delivery points to Mexico along Rio Grande River

Rio Grande Electric Cooperative Texas Service Territory

Rio Grande Electric Cooperative Major Facilities: –143 miles of self serving transmission line –9,775 miles of overhead distribution line –155 miles of underground distribution line –18 substations –4 substations located in Eagle Ford Shale region: Eagle Pass (Rosita Creek) Carrizo Springs Crystal City Brundage RGEC also owns and operates 2 privatized military electrical distribution systems: –Ft. Bliss (El Paso) –Laughlin AFB (Del Rio)

Rio Grande Electric Cooperative Eagle Ford Shale counties served: –Edwards –Maverick –Zavala –Dimmit –Webb

Rio Grande Electric Cooperative Area offices are located in: –Alpine –Brackettville (HQ & office for Edwards county) –Carrizo Springs (main office for Eagle Ford Shale region) –Dell City –El Paso –Ft. Stockton

Carrizo Springs Area Office 3204 Valley Street P.O. Box 125 Carrizo Springs, Texas Telephone: (830) Toll Free: 1-(800) Fax: (830) RGEC Area Office for Main Eagle Ford Shale Region Ken Buscher Area Operations Manager

RGEC Electrical Services General Single & Three Phase Service Residential Seasonal / Recreational Water Wells / Irrigation Temporary & Stand-By Power Area Lighting RioNet Satellite Internet Service

RGEC Electrical Services Typical for OIL and GAS INDUSTRY Temporary Construction Power RV Parks & “Man Camps” Oil Pipeline Valves Pipeline Cathodic Protection Large Power (loads > 50 KW) –Oil Well Pumping –Oil Pipeline Booster Pump Station –Gas Compressor Station

RGEC Electrical Services For OIL and GAS INDUSTRY Major Large Power Requirements Primary Metering Stations –Typically 14.4/24.9 KV Three-Phase –Some of EFS area may be 7.2/12.47 KV 3Ø Substation –Express Distribution Feeder to Major Load –Step-Down Substation to Desired Voltage Wholesale Transmission Service

RGEC Business Information Website: –Bylaws –Tariff –Rate Schedule –Service Area Maps –Area Office Locations –Distributed Generation Manual

RGEC Service Request Process Become member of the Cooperative –File Membership Application –$5 Membership Fee –Establish Credit New Service Request –$250 Application Fee –Certificate of Tax Exemption (if applicable) –Certificate of Compliance (from local county) –Designate Account Representative (DR) –Provide copy of property deed(s) involved –Grant or obtain easements for power line ROW

Challenges RGEC faces serving large Eagle Ford Shale loads Existing capacity limited: power lines/capacity is sparse some areas Piecemeal load service requests – understanding the “big picture” (ie, longer term load requirements) will facilitate better analysis and planning ROW confusion: Actual property owner has to grant easement for RGEC power lines – NOT the entity with surface agreement DIG-TESS response: need prompt and accurate pipeline locating Security concerns: for personnel working in remote areas near border “Hunting season”: can limit field engineering activities and impact power line construction schedules – causing delays for service “Last minute service requests”: make contact with utility early for ROM assessment of service requirements, service territory verification, etc.