1 CAPACITY BUILDING AND TRAINING ON PROCUREMENT Session 9 – The World Bank Procedures for IT Procurement September 21, 2005 by Arif Hassan.

Slides:



Advertisements
Similar presentations
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Advertisements

UMC for Consulting & Services. UMC UMC for Consulting & Services UMC Profile UMC Profile UMC Range of Consulting Services UMC Range of Consulting Services.
Course: e-Governance Project Lifecycle Day 1
Systems Analysis and Design in a Changing World
Chapter 8: Evaluating Alternatives for Requirements, Environment, and Implementation.
Chapter 15: Packaged Software and Enterprise Resource Planning
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
ATTENTION This presentation breaks down the purchasing process into 6 steps, which are then detailed in the subsequent slides. While responding from either.
Chapter 2 The Origins of Software
Network Design and Implementation
The New Software Accounting Rules-GASB 51
10.1 ALTERNATIVE SYSTEMS-DEVELOPMENT APPROACHES Traditional Systems Life Cycle –A phased approach, dividing development into formal stages –a formal division.
Professor Michael J. Losacco CIS 1150 – Introduction to Computer Information Systems Systems Analysis and Design Chapter 12.
8 Systems Analysis and Design in a Changing World, Fifth Edition.
Development and Quality Plans
Model Procurement Documents for Architectural Services [NAME] [PLACE] [DATE]
Chapter 17 Acquiring and Implementing Accounting Information Systems
Acquiring Information Systems and Applications
International Business 9e
3.08a Establish specifications for selecting hardware/software systems.
Chapter 2 The Origins of Software
1.Database plan 2.Information systems plan 3.Technology plan 4.Business strategy plan 5.Enterprise analysis Which of the following serves as a road map.
Chapter 14: Redesigning the Organization with Information Systems Instructor: Kevin Brabazon.
Module 10 Organizing Procurement Session 10.7 Procurement of Goods:
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
Chapter 2 The Origins of Software Modern Systems Analysis and Design.
Source: J. Hoffer ,J. George, J. Valacich
Laudon & Laudon: Canadian Edition
Doing Business in India Acme Manufacturing Company Auburn Hills MI USA.
From Research Prototype to Production
18 Chapter 18: Packaged Software and Enterprise Resource Planning Systems Analysis and Design in a Changing World, 3 rd Edition.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Acquiring Information Systems and Applications
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
RPM1 Procurement Planning for IT Components February 27 – March 3, 2006, Zagreb, ECA.
PUBLIC PURCHASING IN FLORIDA ROLES IN THE PURCHASING PROCESS (rev. 05/27/2008)
Acquiring Information Systems and Applications
Category #2 Bundling and Unbundling Workgroup September 24, 2007.
Chapter 2 The Origins of Software Modern Systems Analysis and Design Fifth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
Chapter 14 Global Production, Outsourcing and Logistics 1.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Lecture 4. IS Planning & Acquisition To be covered: To be covered: – IS planning and its importance Cost-benefit analysis Cost-benefit analysis Funding.
Lessons from Programme Evaluation in Romania First Annual Conference on Evaluation Bucharest 18 February 2008.
Chapter 2 The Origins of Software Modern Systems Analysis and Design Fifth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.
Cis339 Chapter 2 The Origins of Software 2.1 Modern Systems Analysis and Design Fifth Edition.
Chapter 12 The Network Development Life Cycle
System Selection Dania Bilal IS 582 Spring System Selection Business Selection of system project to develop or enhance Libraries & other information.
OGS Procurement Services Group 2007 State Purchasing Forum IT Procurement.
Inter-American Development Bank BIMILACI 2007 QUALITY PROCUREMENT Third Party Review May 2007 Project Procurement Division.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Lecture 2 The Sources of Software. Copyright © 2011 Pearson Education, Inc. 2 Chapter 2 Introduction There are various sources of software for organizations.
PURCHASING 101 SECTION 1 - How to Begin. Is the purchase available from your agency or from other state agencies? ⋆ State Surplus Property ⋆ State Fleet.
1 OF 17 INFORMATION TECHNOLOGY CAPITAL PLANNING FOR YOUR ENTERPRISE Steven Carpenter 14 October 2006.
Slide 1 A Practical Guide to Issuing a Request for Proposals Notes.
ITEC 275 Computer Networks – Switching, Routing, and WANs
Systems Analysis and Design in a Changing World, Fifth Edition
Software Quality Assurance
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Systems Analysis – ITEC 3155 Evaluating Alternatives for Requirements, Environment, and Implementation.
Business System Development
Lockheed Martin Canada’s SMB Mentoring Program
Deloitte Consulting LLP SCOOPS Session
PROCUREMENT POLICIES AND GUIDELINES
Nada Al Dosary Edited By: Maysoon AlDuwais
BIDDING DOCUMENTS AND MAIN FEATURES
MANAGING THE DEVELOPMENT AND PURCHASE OF INFORMATION SYSTEMS
Global Production, Outsourcing, and Logistics
John Williams | Senior Procurement Specialist
Presentation transcript:

1 CAPACITY BUILDING AND TRAINING ON PROCUREMENT Session 9 – The World Bank Procedures for IT Procurement September 21, 2005 by Arif Hassan

2 GENERAL  Information System Projects in general appear to have an alarming high failure rate even in developed countries. Disputes are common.  It is estimated that 80 percent of World Bank projects have some form of informatics component. Some of these components incorporate large information technology and systems contracts. These are difficult and challenging to procurement because:

3  Their technical content is diverse and difficult to define.  Highly affected by changing business objectives, organizational politics and institutional capacity of the end-user.  Subject to rapid technological change over the project life - cycle.  Entail combination of professional engineering services and supply of diverse hard and soft technologies.

4 BASIC ELEMENTS OF IT PROCUREMENT  Preparation of the procurement strategy  Preparation of the detailed requirements and schedules  Preparation of the bidding documents  Bid evaluation process  Award of contract  Contract management  Settlement of final contract accounts

5 PROCUREMENT PLANNING  Normally two approaches are used in procuring IT needs by Borrower.  Short term needs of a particular department:  Stand alone PCs loaded with packaged software and associated peripherals like printers etc.  This is fragmented procurement where economies of scale are lost  IT goods and services procured provide very little scope for expansion in the future

6  Integrated IT Strategy  User overall business development plan for the next 3 to 5 years  Where needs of multiple departments are examined and a solution recommended  Additional users can be added to network. Cost of licensed software for multiple users is much less.  Maintenance and supply of spare parts is much more cost effective.

7 PROCUREMENT PACKAGING  Procurement packaging should be minimized in number to economize time and cost except for hardware where care should be taken not to procure equipment too much in advance.  Borrower should package as many of the technologies and services as are practical into a single contract.  However, despite above project specific factors may suggest multiple contracts  Procurement Plan for each item should be carefully thought of.  This may require technical assistance

8 BUSINESS PLAN  What are the business areas which would benefit from automation  What are the expected benefits of the systems investments  What are the key organizational, management, business process and legal/regulatory changes required to maximize the rate of return on information systems investments

9 STRATEGIC SYSTEMS PLAN  Provide greater detail of business functions to be automated, timetables and resources required.  Need to develop and implement a human resource plan. Find a proper balance for dependence on in-house and contracted technical staff for sustainability of investments

10 IT PROCUREMENT CONTRACTS  IT procurement encompass both supply of products and provision of services. All are bid on International Competitive Bidding Procedures (ICB)  Product and service contracts vary from  Off-the-shelf IT Supply and Maintenance Contracts to  Systems Supply & Installation Contract to  Systems Engineering Contract to  Consulting Services Contract

11  Off-the-Shelf IT Products contracts  Ready-made equipment and material, pre-installed software packages and consumables.  Services & Work element is incidental to the purchase – installation (including wiring for LAN) and standard training/orientation.  Logistics are straightforward enough to complete implementation in say six months.  Technical Support required is vendor’s or manufacturer’s standard warranty provisions.

12  Systems Supply/Installation & Systems Engineering Contracts  Complex IT Supply  Complex Software Engineering  System Development  Systems Integration Services  Consulting Services Contracts  Information System/Project Management Support  Development of ICT strategies/plans  User requirements  Functional specifications  Design of application software

13 PROCUREEMNT METHODS - BIDDING DOCUMENTS  Off-the-shelf IT Products Use Bank Standard Bidding Documents (SBD) – Procurement of Goods, May 2004 revised May 2005  Supply and Installation of Information System where different technical solution are not required – Use Bank SBD – Single Stage Bidding, March 2003

14 where different technical solutions are required - Use Bank SBD – Two Stage Bidding, March 2003  Consultancy Services The Bank’s Standard Request for Proposal (RFP) Document – May 2004

15  Based on technical products or service specification such as wide-area network (WAN) etc.  Where detailed functional or performance specifications are developed by the Purchaser  Specifications are likely to be met only by established products in the market such as established software packages. SINGLE STAGE PROCESS

16  Based primarily on business or performance requirements rather than any technical specifications  Buyers require different technical solutions from Purchaser TWO STAGE PROCESS

17  Proprietary Products  Bank discourages use of brand names. If brand name is mentioned this has to be followed by “or substantially equivalent” SPECIAL REQUIREMENTS

18  Proprietary Products…continued…  Commercial brand names can be used only if arguments and justifications are provided for -required HW/SW platform for proposed application. -“de-facto” industry standard -enterprise technology standard. -prior material investment.

19  Conflict of Interest  Consultant should perform systems analysis as a separate and prior activity.  Consultant should be independent of firm or firms performing the development and implementation activities and supplying technologies.

20  Use Standard Bid Evaluation Form;  Supply & Installation of information systems – Single Stage Bidding, October 2004  Annex I provides an Evaluation Guide for users  Examples. BID EVALUATION

21  Based on CIP (Carriage and Insurance Paid to Place of Destination i.e Project Site) as per Incoterms 2000  Website: PRICING OF FOREIGN GOODS IN ICB

22 HOW TO DOWN-LOAD IT STANDARD BIDDING DOCUMENTS and OTHER INFORMATION. Go to: Click on the documents you want to download

23