E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, 2008 1 Field investigation Installation site confirmation Roof-mounted.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Solar PV On-Site Guide Solar PV On-Site Installers Guide.
Fixed and mobile scaffolds
Educatory Electro Services t/a EE Services
Solar Schoolhouse and San Mateo College Designing and Installing Solar Electric Systems Types of Solar Electric Systems For Technology Teachers San Mateo.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Scissor Lift Safety Training
Quad Plus Shredder Drive Maintenance Joe Kowalkowski Engineering Manager – Recycling Industry
Installation. Indoor Unit Installation Typical Installation.
§ – Subpart L Oklahoma State University2.
Today’s Meeting There are approximately 25 people killed by electricity per year in Australia (average for the last 7 years), 700 people are hospitalised.
Subpart R Steel Erection
Introduction to B-tek “Digital” load cell Shows complete assembly as in the “Centurion” Truck Scale. Shows complete assembly as in the “Centurion” Truck.
Proper Use of Extension Cords Proper Use and Electrical Hazard Awareness for Extension Cord Users Module 2.
ELECTRICAL/ELECTRONIC WORKBENCHES. ELECTRICAL/ELECTRONIC WORKBENCHES References 1.) MIP 6652/006 A-1 (Inspect and Test Disconnect Switches, Inspect Workbench,
Solar PV Design Implementation O& M March 31- April 11, 2008 Marshall Islands 9. Operation & Maintenance Yoshikazu Kogetsu 9. Operation & Maintenance Yoshikazu.
2-4. Solar Panels.
Installation. Indoor Unit Installation Typical Installation.
Fall Protection in the Roofing Industry
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE.
Electrical Safety - Construction. Electricity - The Dangers About 5 workers are electrocuted every week Causes 12% of young worker workplace deaths Takes.
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, 8・5 - Field Inspection Items Visual inspection and verification.
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
By Carlin Bright. Electricity The flow of electrons in a conductor.
Purpose Power lines Equipment Assured Grounding GFCI Conclusion.
Construction Safety Council. by David G. Allie Subpart R - Steel Erection ( ) Tiered buildings not adaptable to temporary floors - Safety.
Lamma Power Station Solar Power System. 2 Content Project Background Site Selection Amorphous Silicon Thin Film Photovoltaic System Environmental Benefits.
Copyright 2005 Ted "Smitty" Smith Two Minute Drill Number Three Improving your skill in code Look Up Increasing Speed Drill.
The Saigon CTT Semester 1 CHAPTER 9 Le Chi Trung.
INTRUSION ALARM TECHNOLOGY
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, What about battery additives that are supposed to “rejuvenate”
Scissor Lift Safety Training Working Safely on Scissor Lifts 29 CFR OSHA Scaffolding Safety Requirements.
Introduction  Exceptionally long life & high switching speeds.  Non contact, zero operation force.  Wear & maintenance free operation.  Bounce free.
Electrical Safety.
1 Lesson 3 Computer Protection Computer Literacy BASICS: A Comprehensive Guide to IC 3, 3 rd Edition Morrison / Wells.
Electrical Safety in Construction. Objectives In this course, we will discuss the following: Common electrical hazards Standards relating to those hazards.
1a.  Exposed part  Live or energized part  De-energized part 1a.
Solar Energy Technology Science Summer Camp Session 9: Fri 9:00 AM - 12:00 N : Field trip to Energy Masters and Installing/Commissioning the System.
Mounting System for new modules Module AIT-PL-6. Mounting way The mounting system for new frameless modules AIT PL-6 was designed and is produced by Spanish.
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Preventive Maintenance.
Proper Use of Extension Cords
Copyright © 2010 Delmar, Cengage Learning. ALL RIGHTS RESERVED. Unit 34 Installing Branch Circuits.
Electrical Safety Craig Shurson CSP, ARM Regional Loss Control Coordinator Hortica - The Florists Mutual Company.
Sageon Power Module Distribution Sageon Rack Trim Pieces.
SERVICE ENTRANCE EQUIPMENT
Copyright ©2014 , JAE Electronics, Inc. Confidential DW Series Overview JAE May 2014 Battery Connectors for Power Storage.
PV System Design and Installation LO 10 Performance Analysis and Troubleshooting.
2014 NEC C ODE C HANGES C LASS P ART II Ted “Smitty” Smith 8/15/2014 E Light Electric Services, Inc.
ELECTRICAL INSTRUMENTS ( service and utilization )
UNIT-5. ELECTRICAL SAFETY, WIRING & INTRODUCTION TO POWER SYSTEM
E4 Electrical Installation
INSTALLING ELECTRIC PANEL GENERATOR
E4 Electrical Installation
Circuits Electrical Wiring.
Subpart K Electrical Long recognized as a serious hazard.
Chapter 31 Battery Systems.
HOME ELECTRICAL SAFETY
Personal Protective Equipment
Electrical Safety.
§ SUBPART L SCAFFOLDS 1.
EET 323 – Electrical System Design Lecture 9: Grounding
EET 323 – Electrical System Design Lecture 11: Panel-boards and Switch-boards Instructor: Radian Belu, PhD.
Click anywhere to get started…
A. Touching both terminals with the hands can cause electrical shock
Electrical components and systems
Presentation transcript:

e8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Field investigation Installation site confirmation Roof-mounted Confirm that a lift to the roof is provided. Wall-mounted Determine whether or not the provision of scaffolding and a man lift truck is necessary. Ground-mounted Recognize the work range of construction equipment (yumbo). Verification of installation conditions Deck roofCheck waterproof type. Folded plate roofCheck folded plate fixture type. Sloping roof Verify inclination and anti-slip properties Confirmation of interconnect ed point Circuit breaker for interconnected system Confirm an extended space. High-voltage protection relay If an outage line is separated from the system, confirm the separating point. Verification of piping and wiring routes Route check Determine whether or not the provision of scaffolding and a man lift truck is necessary. Determine whether the existing route can be used. Introduction route check Verify installation location of construction equipment (wrecker ). 8・3 - Construction Maintenance Points (1)

e8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Entrance Marking Temporary office Provide an on- site office. Determine whether or not the provision of scaffolding and a man lift truck is necessary. Temporary yard Provide a materials yard. Provide a yard close to the site. Marking Marking based on reference line Check the drawing. Confirm shadows. Introduction Crane placement Placement of crane at predetermined location Verify hoisting loads and construction equipment. Confirm the operating, hanging and signaling workers. Prohibit admittance to work area. Inspect the hoisting accessory. Rooftop carePrevention with control panel Install to prevent the wind from blowing solar cell modules. Provision of access made by stage planks. Bind stage planks. CraningCraning the platform and solar cell modules Confirm the stability of the crane and load at a lift of 30 cm above the ground. Do not enter the space directly beneath loads. 8・3 - Construction Maintenance Points (2)

e8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, 8・3 - Construction Maintenance Points (3) Fixture mounting Mount fixture.Mount fixtures to marking. Assembly of platform Assemble the platform. With stainless bolts, mount the platform to fixture. Confirm that the platform top is horizontal and the platform is upright. Platform installation Installation of solar cell module Mounting solar cell module to the platform Carefully handle the solar cell module, and mount it to the fixture without damaging the module. Align modules flush with longitudinal and lateral lines. During mounting, workers shall communicate with one another. Solar cells installation

e8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, 8・3 - Construction Maintenance Points (4) Wiring between solar cell modules Wiring of connector cables between modules Confirm that the circuit and system are constructed according to the drawings. Connection between solar cell modules Wiring of connectors between modules Confirm the polarity and system of the cable connectors, and connect them. Confirm that the cable plug is securely connected. After the connection between modules, cover terminals with insulation tape to prevent short-circuits. Equipment mounting Mounting power conditioner and interconnection board Mount according to the drawing. Mount so that devices cannot cast shadows on each other. Be careful not to damage the casing. Laying electrical conduits Using hangers, saddles and other metal supports, mount conduits. Mount according to the drawing. Laying cable rackWith metal supports, mount the cable rack. Mount according to the drawing. Laying cable Select line types and distance, according to design drawing. Be careful not to damage the covering of the cable. Aligning cablesMount cables to insulock by insulation lock. Connecting wires Connection to switchboards Use of appropriate terminals Electrical piping and wiring work

e8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Breaker, OVGR and extension Outage With electroscope, confirm an outage. Circuit breaker and OVGR extension Ground units. Ground all devices. ZPD and OVGR are mounted. ZPD and OVGR are mounted in place. Circuit breaker extension Outage With an electroscope, confirm outage. Mount breaker. Mount circuit breaker in place. Restoration Check inside of cubicle. Outage work (remodeling switchboards) 8・3 - Construction Maintenance Points (5) Inspection Visual Inspection Visual Inspection of Equipment Confirm that devices are free from cracks. Open-Voltage Measurement Measurement of voltage per system with tester Measure the voltage of each circuit in inverter, and record. Insulation resistance measurement Measurement of insulation resistance with megger Check batteries. Verify the connections to the grounding terminals. Solar cell circuit Measure voltage across grounding terminals, and record. Voltage across inverter and interconnected system Measure voltage across batteries and across lines, and record. Voltage across interconnected system and interconnected point Measure voltage across batteries and across lines, and record.