Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”

Slides:



Advertisements
Similar presentations
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Advertisements

G O D D A R D S P A C E F L I G H T C E N T E R Code 300 Overview Codes 323: Mission Assurance Branch Name:Joe Hall Title: Associate Branch Head Office:Mission.
NASA’s Goddard Space Flight Center LRO SRR Project Management.
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
Risk Assessment & Risk Management at GSFC
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
Effective Methods for Software and Systems Integration
FIELDS iCDR Solar Probe Plus FIELDS Instrument CDR Introduction 1Peter Harvey.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
SwRR 4/28/ Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
VST: dome THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS Ing. Davide Fierro THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS.
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety Believe it or.
Mandatory Technical Standards Engineering Management Board Goddard Space Flight Center July 10, 2003 Updated October 7, 2003 HQ/Code AE R. Weinstein.
Development programs and model philosophy1 Preliminary design review Prototype program Critical design review Qualification program Qualification review.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 N. Virmani Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
Quality Activity Matrix Presented by Sandra Toalston President, SanSeek 1.
Refined ECSS Software Process Model Elements SD-TN-AI-0570, Issue 5 APPENDIX D.
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
JLab Software Assurance Program A Risk Based Approach to Software Management.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
V&V of COTS RTOS for Space Flight Projects The 1st Annual NASA Office of Safety and Mission Assurance (OSMA) Software Assurance Symposium (SAS) Michael.
ENGINEERING LESSONS LEARNED AND SYSTEMS ENGINEERING APPLICATIONS Paul S. Gill and Danny Garcia, NASA Technical Standards Program Office William W. Vaughan,
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
DPE CSSW Process Model Annex A WP-400 ECSS Case Study.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
Constellation Space Transportation Planning Office July 30, 2009.
Over View of CENELC Standards for Signalling Applications
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
RLV Reliability Analysis Guidelines Terry Hardy AST-300/Systems Engineering and Training Division October 26, 2004.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section 17 1 GLAST Large Area Telescope: Performance & Safety Assurance WBS: 4.1.A.
Safety and Mission Assurance Plan AMS-02 R EBASELINING O UTBRIEF July 15, 2004 NT/David Kaplan
Alpha Magnetic Spectrometer NASA / DOE National Aeronautics and Space Administration AMS-02 ROAD TO COFR Mike Fohey July 15, 2004.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Accelerator Readiness Review October 31, 2006
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
THEMIS Mission Assurance
Lesson 4 Systems Engineering Plan Exercise Team #
Acronym List AIA Atmospheric Imaging Assembly AS AMBI/Summit driver
Peer Review Agenda (Suggested).
BRIAN KLATT MISSION ASSURANCE MANAGER
Lockheed Martin Canada’s SMB Mentoring Program
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
EMIS 7307 Chapter 6.
Instrument PDR Summary of Objectives
PSS verification and validation
DOE Review of the LCLS Project October 2006
GLAST Large Area Telescope:
DOE Review of the LCLS Project 7-9 February 2006
Presentation transcript:

Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”

GSFC ST5 PDR June 19-20, Mission Assurance Organization Project Manager Systems Assurance Manager Quality Assurance Quality Engineering S/W Quality Assurance Inspection/Audits Certification/Training NCRCA MRB Systems Safety and Reliability Systems Safety Engineer Reliability Engineer Environmental Program Materials Engineering Materials Engineer Coupon Analysis Material Usage Agreements Analysis Lab Parts Engineering Parts Engineer Parts Selection/stocking Alerts Analysis Lab Systems Review Office OSSMA (Code 300) GSFC

ST5 PDR June 19-20, Mission Assurance Requirements Tailored from the requirements suggested by the Mission Assurance Guidelines GPG Contained in “Mission Assurance Requirements for the ST5 Project”, ST Technical Reviews in addition to Peer Reviews –System Concept Review (SCR) – Completed May 2000 –Preliminary Design Review (PDR) – June 19-20, 2001 –Critical Design Review (CDR) –Pre-Environmental Review (PER) –Mission Operations Review (MOR) –Pre-Shipment Review (PSR) –Flight Operations Review (FOR) –Flight Readiness Review (FRR)

GSFC ST5 PDR June 19-20, Mission Assurance Requirements Design Verification –Performance Verification Plan (PVP) –Verification Program based upon GEVS-SE –Verification Matrix (for both H/W and S/W) –Environmental Test Matrix –Procedures and Reports –Protoflight and Acceptance testing to ST5 S/C Specification and Requirements document (ST ) Protoflight testing shall be performed on the first Flight Unit of the ST5 constellation Acceptance testing shall be performed on follow-on Flight Units

GSFC ST5 PDR June 19-20, Safety –“ST5 System Safety Implementation Plan”, ST Approved –Assumes use of ELV, and not Shuttle –Developers provide required information for GSFC Safety Engineer –GSFC has overall safety responsibility Parts Requirements –PPL-21, Grade 2 as baseline. Lot specific Qualification and DPA implemented based on part heritage. Parts Control Plan currently in draft form; is being implemented for all subsystems. –Parts Control Board review of selected parts. Approved parts will be added to ST5 PAPL and posted on web site. Mission Assurance Requirements

GSFC ST5 PDR June 19-20, Electronic Packaging and Process –NASA Workmanship Standards –Coupon Evaluation Materials –NASA Publication 1124, Outgassing Data for Selecting S/C Materials, shall be used as a guide. –Materials approved via a Materials Control Board chaired by Project Materials Engineer –Materials must meet CVCM level 0.1% and TML of 1.0% –Non-approved materials or nonconventional use of materials processed via Materials Usage Agreement (MUA) –GSFC S , GSFC Fastener Integrity Requirements Mission Assurance Requirements

GSFC ST5 PDR June 19-20, Reliability –FMEA – To be completed by CDR –Fault Tree Analysis - To be completed by CDR –Probability Risk Assessment (PRA) –Assessments shall include Worst Case Analysis, Parts Stress Analysis, and limited life items program Mission Assurance Requirements

GSFC ST5 PDR June 19-20, Mission Assurance Requirements Quality Manual (or equivalent) required from major subcontractors (All are due prior to CDR) –Cold Gas Micro-Thruster System - Marotta Scientific Controls, Inc. Approved –Li-Ion Battery - AEA Technology –X-Band Transponder Communications System - AeroAstro Received Draft Version – Flexible Cable - Lockheed Martin Astronautics, Denver –Autonomous Ground-Based Constellation Management S/W - JPL/Bester Tracking Systems, Inc –Magnetometer - UCLA Received Draft Version

GSFC ST5 PDR June 19-20, Mission Assurance Requirements Contamination –Contamination Control Plan S/W –S/W Management Plan Configuration Control Quality Assurance Testing Performance Validation Matrix IV&V –MOA with Code 307 outlining the extent of IV&V