1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.

Slides:



Advertisements
Similar presentations
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
Advertisements

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
Risk Analysis and Management
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
1 Chapter 6 Risk Management. 2 Project Risks What can go wrong? What is the likelihood? What will the damage be? What can we do about it?
Types of Risks 1.Project risks –Impact schedule and cost –Includes budgetary, schedule, personnel, resource, customer, requirement problems 2.Technical.
Risk Management CS 414, Software Engineering I Mark Ardis, Rose-Hulman Institute January 28, 2003.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
CIS 375 Bruce R. Maxim UM-Dearborn
Chapter 25 Risk Management
Chapter 3 Project Management
1 Software Engineering: A Practitioner’s Approach, 6/e Chapter 25 Risk Management Software Engineering: A Practitioner’s Approach, 6/e Chapter 25 Risk.
Risk Analysis & Management
1 COSC 4406 Software Engineering COSC 4406 Software Engineering Haibin Zhu, Ph.D. Dept. of Computer Science and mathematics, Nipissing University, 100.
Chapter 25 Risk Management
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
Software Engineering Risk Management. Steps in Project Planning lScope—understand the problem and the work that must be done. lEstimation—how much effort?
Software Project Management Lecture # 8. Outline Chapter 25 – Risk Management  What is Risk Management  Risk Management Strategies  Software Risks.
Capability Maturity Model Part One - Overview. History Effort started by SEI and MITRE Corporation  assess capability of DoD contractors First.
1 Chapter 6 Risk Management. 2 Project Risks What can go wrong? What is the likelihood? What will the damage be? What can we do about it?
Software Project Management Lecture # 8. Outline Earned Value Analysis (Chapter 24) Topics from Chapter 25.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Risk Analysis and Management. Reactive Risk Management Project team reacts to risks when they occur. More commonly, the software team does nothing about.
Software Engineering Risk Management. Understanding Risks Risks involve :  Uncertainty – there are no 100% probable risks  Loss – if the risk becomes.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
Risk Analysis & Management
1 These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.
What is it? A risk is a potential problem — it might happen, it might not. But, regardless of the outcome, it’s a really good idea to identify it. Assess.
ﴀ These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
1.  an unrealistic deadline established by someone outside the software development group  changing customer requirements that are not reflected in.
These slides are designed to accompany Web Engineering: A Practitioner’s Approach (The McGraw-Hill Companies, Inc.) by Roger Pressman and David Lowe, copyright.
1Coming up: Project Risks Chapter 28 – Modified by Fleck Risk Analysis Slide Set to accompany Software Engineering: A Practitioner’s Approach, 7/e by Roger.
Risk Analysis 1. Project Risks 2 What can go wrong? What is the likelihood? What will the damage be? What can we do about it? Check : List of potential.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
Software Engineering B.Tech IT/II Sem-II Term: Unit-7 PPT SLIDES Text Books:1.Software Engineering, A practitioner’s approach Roger s. Pressman.
Software Engineering Lecture 6: Risk Analysis & Management.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
1 Chapter 24 Project Scheduling and Tracking Software Engineering: A Practitioner’s Approach, 6th edition by Roger S. Pressman.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
Software Project Management Lecture # 9. Outline Chapter 25 – Risk Management  What is Risk Management  Risk Management Strategies  Software Risks.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
1 Chapter 24 Project Scheduling and Tracking Software Engineering: A Practitioner’s Approach, 6th edition by Roger S. Pressman.
Chapter 3 Project Management Parts of this presentation is extracted from Ian Sommerville’s slides located at
Ashima Wadhwa.  Probably the most time-consuming project management activity.  Continuous activity from initial concept through to system delivery.
Chapter 25 Risk Management
Software Configuration Management
Software Engineering B.Tech Ii csE Sem-II
Risk Analysis.
Chapter 35 Risk Analysis Slide Set to accompany Software Engineering: A Practitioner’s Approach, 8/e by Roger S. Pressman and Bruce R. Maxim Slides copyright.
Chapter 25 Risk Management
Software Engineering: A Practitioner’s Approach, 6/e Chapter 23 Estimation for Software Projects copyright © 1996, 2001, 2005 R.S. Pressman & Associates,
Chapter 28 Risk Analysis Slide Set to accompany Software Engineering: A Practitioner’s Approach, 7/e by Roger S. Pressman Slides copyright © 1996, 2001,
Chapter 28 – Modified by Fleck
Chapter 25 Risk Management
Software Engineering: A Practitioner’s Approach, 6/e Chapter 23 Estimation for Software Projects copyright © 1996, 2001, 2005 R.S. Pressman & Associates,
Presented To: Sir Ali Raza Presented By: Kainat(06)Riffat(024)Asqsa(034) Group#06.
Chapter 6 Risk Management
Risk Management.
Software Risk Management
Presentation transcript:

1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Chapter 6 Risk Management

2 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Risk ? Risk Concerns Future Happenings

3 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Characteristics of Risk LossLoss Uncertainty

4 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Reactive Risk Management  project team reacts to risks when they occur  mitigation—plan for additional resources in anticipation of fire fighting  fix on failure—resource are found and applied when the risk strikes  crisis management—failure does not respond to applied resources and project is in jeopardy

5 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Proactive Risk Management  formal risk analysis is performed  organization corrects the root causes of risk  TQM concepts and statistical SQA  examining risk sources that lie beyond the bounds of the software  developing the skill to manage change

6 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Types of Software Risk Project Risk: Project Risk:  budgetary,  Staff  schedule,  resource Project Risk: Project Risk:  budgetary,  Staff  schedule,  resource Technical Risk Technical Risk  potential design  Implementation  interface  verification  maintenance Technical Risk Technical Risk  potential design  Implementation  interface  verification  maintenance Business risks Business risks  product that nobody wants  Not fit for current business situation  difficult to sale. Business risks Business risks  product that nobody wants  Not fit for current business situation  difficult to sale.

7 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Project Risks What can go wrong? What is the likelihood? What will the damage be? What can we do about it?

8 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 RISK Risk Management Paradigm control identify analyze plan track

9 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Risk Estimation ImpactImpact ProbabilityProbability

10 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Building a Risk Table RiskProbabilityImpactRMMM RiskMitigationMonitoring&Management

11 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Building a Risk Table RiskProbabilityImpactRMMM RiskMitigationMonitoring&Management

12 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Building the Risk Table  Estimate the probability of occurrence  Estimate the impact on the project on a scale of 1 to 4, where the scale is 1 – catastrophic 2 – critical 3 – marginal 4_ negligible  sort the table by probability and impact

13 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001  mitigation—how can we avoid the risk?  monitoring—what factors can we track that will enable us to determine if the risk is becoming more or less likely?  management—what contingency plans do we have if the risk becomes a reality? Risk Mitigation, Monitoring, and Management

14 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Risk Due to Product Size estimated size of the product in LOC or FP? estimated size of the product in LOC or FP? estimated size of product in number of programs, estimated size of product in number of programs, files, transactions? percentage deviation in size of product from percentage deviation in size of product from average for previous products? size of database created or used by the product? size of database created or used by the product? number of users of the product? number of users of the product? number of projected changes to the requirements number of projected changes to the requirements for the product? before delivery? after delivery? amount of reused software? amount of reused software? Attributes that affect risk:

15 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Risk Due to Business Impact affect of this product on company revenue? affect of this product on company revenue? visibility of this product by senior management? visibility of this product by senior management? reasonableness of delivery deadline? reasonableness of delivery deadline? number of customers who will use this product number of customers who will use this product interoperability constraints interoperability constraints sophistication of end users? sophistication of end users? amount and quality of product documentation that amount and quality of product documentation that must be produced and delivered to the customer? governmental constraints governmental constraints costs associated with late delivery? costs associated with late delivery? costs associated with a defective product? costs associated with a defective product? Attributes that affect risk:

16 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Risks Due to the Customer Have you worked with the customer in the past? Have you worked with the customer in the past? Does the customer have a solid idea of requirements? Does the customer have a solid idea of requirements? Has the customer agreed to spend time with you? Has the customer agreed to spend time with you? Is the customer willing to participate in reviews? Is the customer willing to participate in reviews? Is the customer technically sophisticated? Is the customer technically sophisticated? Is the customer willing to let your people do their Is the customer willing to let your people do their job—that is, will the customer resist looking over your shoulder during technically detailed work? Does the customer understand the software Does the customer understand the software engineering process? Questions that must be answered:

17 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Risks Due to Process Maturity Have you established a common process framework? Have you established a common process framework? Is it followed by project teams? Is it followed by project teams? Do you have management support for Do you have management support for software engineering Do you have a proactive approach to SQA? Do you have a proactive approach to SQA? Do you conduct formal technical reviews? Do you conduct formal technical reviews? Are CASE tools used for analysis, design and Are CASE tools used for analysis, design and testing? Are the tools integrated with one another? Are the tools integrated with one another? Have document formats been established? Have document formats been established? Questions that must be answered:

18 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Technology Risks Is the technology new to your organization? Is the technology new to your organization? Are new algorithms, I/O technology required? Are new algorithms, I/O technology required? Is new or unproven hardware involved? Is new or unproven hardware involved? Does the application interface with new software? Does the application interface with new software? Is a specialized user interface required? Is a specialized user interface required? Is the application radically different? Is the application radically different? Are you using new software engineering methods? Are you using new software engineering methods? Are you using unconventional software development Are you using unconventional software development methods, such as formal methods, AI-based approaches, artificial neural networks? Are there significant performance constraints? Are there significant performance constraints? Is there doubt the functionality requested is "do-able?" Is there doubt the functionality requested is "do-able?" Questions that must be answered:

19 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Staff/People Risks Are the best people available? Are the best people available? Does staff have the right skills? Does staff have the right skills? Are enough people available? Are enough people available? Are staff committed for entire duration? Are staff committed for entire duration? Will some people work part time? Will some people work part time? Do staff have the right expectations? Do staff have the right expectations? Have staff received necessary training? Have staff received necessary training? Will turnover among staff be low? Will turnover among staff be low? Questions that must be answered:

20 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001 Project: Embedded software for XYZ system Risk type: schedule risk Priority (1 low... 5 critical): 4 Risk factor: Project completion will depend on tests which require hardware component under development. Hardware component delivery may be delayed Probability: 60 % Impact: Project completion will be delayed for each day that hardware is unavailable for use in software testing Monitoring approach: Scheduled milestone reviews with hardware group Scheduled milestone reviews with hardware group Contingency plan: Modification of testing strategy to accommodate delay using Modification of testing strategy to accommodate delay using software simulation software simulation Estimated resources: 6 additional person months beginning Recording Risk Information