ERP Lifecycle.

Slides:



Advertisements
Similar presentations
CH 4: Finding Your Unique Selling Point 14 January 2014 Lectured by: OR Vitou.
Advertisements

Upgrading the Oracle Applications: Going Beyond the Technical Upgrade Atlanta OAUG March 19, 1999 Robert Cooney.
Requirements Specification and Management
© 2007 AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures. Interactive Solutions & Design Group.
Enterprise Resource Planning
Planning for Enterprise Systems
1 Dr. Djamal Ziani SAP Project Management. 2 ASAP Accelerated SAP (ASAP) is SAP's standard implementation methodology. It contains the Roadmap, a step-by-step.
Migration MIGR-02. David Cervelli Managing Consultant Strategic Systems Group (SSG) June 2007 Preparing for an Implementation.
Ensuring Product Quality By Managing Critical Process Control Points BackgroundBackground A producer of nutritional supplements and baby formula was experiencing.
Rational Unified Process
SUMMER 2005 JUNE Preparing an Organizational Change Management Plan Org Change Management Activities by Project Phase.
Unit Five – Transforming Organizations
Chapter 1 Thinking Critically 2,4,5,9,10 Assoc. for Information Technology 1,2,3.
© Prentice Hall, 2005: Enterprise Resource Planning, 1 st Edition by Mary Sumner 3-1 Enterprise Resource Planning, 1 st Edition by Mary Sumner Chapter.
1 Walk-in slide. 2 How to Manage a System Upgrade The Good, The Bad and The Ugly of Conversions David Cervelli Managing Consultant April 25, 2006.
VENDORS, CONSULTANTS AND USERS
000000_1 Confidential and proprietary information of Ingram Micro Inc. — Do not distribute or duplicate without Ingram Micro's express written permission.
© Copyright High Performance Concepts, Inc. 12 Criteria for Software Vendor Selection July 14, 2014 prepared by: Brian Savoie Vice President HIGH.
Charting a course PROCESS.
Release & Deployment ITIL Version 3
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
Effective Methods for Software and Systems Integration
02/10/2011Ombati Thomas ENTERPRISE RESOURCE PLANNING (ERP)- SAP PRESENTATION November 2012.
S/W Project Management
IS 466 ADVANCED TOPICS IN INFORMATION SYSTEMS LECTURER : NOUF ALMUJALLY 21 – 9 – 2011 College Of Computer Science and Information, Information Systems.
Commercial Database Applications Testing. Test Plan Testing Strategy Testing Planning Testing Design (covered in other modules) Unit Testing (covered.
System Implementation. System Implementation and Seven major activities Coding Testing Installation Documentation Training Support Purpose To convert.
ERP E NTERPRISE R ESOURCE P LANNING Every Monday, 13:30 – 16:00 Last Updated: 31 March 2009ERP – Ir. H. Noor Hidayat, MMT.1.
ERP Implementation Lifecycle
Bring Your Business into the 21 st Century : Part 1 WasteExpo 2011 Improving Your Financial Management System.
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
Information Systems Technology Ross Malaga "Part III - Building and Managing Information Systems" III 11 Copyright © 2005 Prentice Hall, Inc MANAGING.
ERP IMPLEMENTATION LIFE CYCLE KASHIF SHAMIM. Enterprise resource planning ERP covers the technique and concepts employed for the integrated management.
16 1 Installation  After development and testing, system must be put into operation  Important planning considerations Costs of operating both systems.
ISYS 562 Microcomputer Business Applications David Chao.
普 华 永 道 Phase 1: Project Preparation Phase 1: Project Preparation Phase Overview Phase Overview.
The Development of BPR Pertemuan 6 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
VENDORS, CONSULTANTS AND USERS. WHY CAN’T COMPANIES DEVELOP THEIR OWN ERP PACKAGES? To develop an ERP package is a complex & time consuming activity which.
Core Banking Transformation: A Roadmap to a Successful Core Banking Product Implementation - PMI Virtual Library | | © 2008 Kannan S. Ramakrishnan.
Copyright © The OWASP Foundation Permission is granted to copy, distribute and/or modify this document under the terms of the OWASP License. The OWASP.
Chapter 7 Enterprise Resource Planning (ERP). Objectives After studying the chapter, students should be able to.. Explain definition of Enterprise Resource.
ERP IMPLEMENTATION LIFE CYCLE AND FRAMEWORK
Sage ERP X3 Standard Edition Methodology
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
ERP Implementation Lifecycle
ERP Implementation Lifecycle
What is project management?
Chapter 6 SYSTEMS DEVELOPMENT Phases, Tools, and Techniques.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
BizForceOne by MegaSolutionCenter (MSC), USA BIZFORCEONE OPERATING SYSTEM BEST FIT IMPLEMENTATION.
Business and Systems Aligned. Business Empowered. TM Global ERP Projects Author:Andrew McCumiskey Presentation for:University of Birmingham Course: Commercial.
Microsoft Dynamics Sure Step Rana Abdul Rahman. What we will cover What is Sure Step? Benefits of Sure Step methodology Project phases as per sure step.
Phases of ERP Implementation Lifecycle By ControlERP
Management Information Systems
Enterprise Resource Planning
BANKING INFORMATION SYSTEMS
M ERP (Enterprise Resources Planning)
IEEE Std 1074: Standard for Software Lifecycle
Description of Revision
VENDORS, CONSULTANTS AND USERS
Engineering Processes
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
MANAGING THE DEVELOPMENT AND PURCHASE OF INFORMATION SYSTEMS
Training 01: Project Lifecycle & Business Technology Analysis
Executive Project Kickoff
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

ERP Lifecycle

Different Phase of ERP implementation are- Pre-implementation Activities Project Preparation Business blueprinting Realization Final preparation and go live Support

ERP Life Cycle Pre implementation Activities Project Preparation Business blueprinting Realization Final preparation and go live Support

Implementation Team Training Post Implementation Phase Company Management ERP Vendors Pre-Evaluation Screening Package Evaluation Project Planning Gap Analysis Reengineering Configuration Implementation Team Training Testing End-User Training Go ahead Going Live Post Implementation Phase ERP implementation Lifecycle

Pre-implementation Activities Have crack team in place Feasibility/ROI study Getting budget for ERP implementation. High level requirement definition . High level scope definition. RFP for implementation partner selection. Evaluation and selection partner for imp. RFP for package selection. Evaluation and selection ERP package.

Project Evaluation Project team selection,organisation str. Project methods,stds formulation. Finalizing the strategy. Detailed project scoping. Technical preparation. Training

Business Blueprinting Modelling high level AS IS process Detailed req definition. BPR and process redesign Detailed TO BE modelling,TO BE process documentation. Identify gaps Define roles Blueprint audit. Blueprint sign off. Give core team configuration training.

Realization Configuration/customization. Unit testing. Integration testing. Developments for gaps. End user training.

Final Preparation and go live Stress and volume testing. End user acceptance testing and signoff. Conducting end user training. Data migration. Cutover planning and go live checklist. Help desk support finalization. Closing open project finalization. Pre go live audit. Go live audit.

Support Knowledge transfer to support team. Transition-documents,open issues. Regular support ,monitoring SLAs Measuring performance improvement. Upgrading

PROJECT PLANNING PHASE Project schedule Decision of phase Team leader DESIGN IMPLEMENTATION PROCESS TIME SCHEDULES, DEADLINES, ETC RESOURCES ARE NEEDED AND IMPLEMENTATION IDENTIFIED CONTINGENCIES, MONITOR THE PROGRAM, CONTROL MEASURES , CORRECTIVE ACTIONS PLANNING IS DONE BY TEAM LEADERS COMMITTEE WILL BE HEADED BY INCHARGE

GAP ANALYSIS Importance of Gap Analysis Gap analysis is a phase in the ERP implementation, where the organization tries to find out the gaps between the company’s existing business practices & those supported by the ERP package. This is the process through which companies create a complete model of where they are now & where they want to head in the future.

Main objective The main objective is to design a model, which both anticipates & covers any function gap. It has been estimated that even the best ERP package meets only 80% of the company’s functional gaps.

Different ways of finding gaps One of the most affordable, but most difficult, solutions entails altering the business to ‘fit’ the ERP package. Another solution is that the company can simply agree to live without a particular function. Other solutions include: Pinning your hopes on an upgrade or updating of software. Identifying a third-party product that might fill the gap. Designing a custom program. Altering the ERP source code.

GAP ANALYSIS Importance Main objective Different ways of finding FIND OUT THE GAPS BETWEEN BUSINESS AND ERP PACKAGE ALTERING THE BUSINESS TO FIT THE PACKAGE DESIGN A MODEL LIVE W/O A FUNCTION COVERS ANY FUNCTIONAL GAP UPDATING SOFTWARE COMPANY CREATES A MODEL IDENTIFYING A PRODUCT DESIGNING A PROGRAM ALTERING SOURCE CODE

RE-ENGINEERING: It is in this phase that the human factors are taken into account. Two different connotations 1st one is the controversial, involving the use of ERP to aid in downsizing efforts. There have been occasions where high level executives have invoked the reengineering slogan & purchased an ERP package with the aim of reducing number of employees. While every implementation is going to involve some change in job responsibilities, so it is the best to treat ERP as an investment as well as cost-cutting measure, rather than a downsizing tool. ‘Downsizing’ is a business practice that may have its place, but it should not be cloaked within the glossier slogan of ‘reengineering’. The 2nd use of the word re-engineering in the ERP field refers to an ERP implementation model initially designed & used.

The BPR approach to an ERP implementation implies two separate, but closely linked implementations involved on an ERP site i.e. a technical implementation & a business process implementation. The BPR approach emphasis the human element of necessary changes within the organization, which is generally more Time consuming & has received its share of criticism for creating bloated budgets & extended projects. The ERP market shifts to a mid-market focus & as all implementation are becoming more cost sensitive; the BPR approach has come under some real scrutiny.

RE-ENGINEERING Human factor taken into account Downsizing effort BPR APPROACH

CONFIGURATION IMPORTANCE OF CONFIGURATION This is the main functional area of the ERP implementation. Business processes have to be understood & mapped in such a way that the arrived solution matches with the overall goals of the company. THE PROTOTYPE A prototype- a simulation of the actual business processes of the company- will be used. The prototype allows for thorough testing of the ‘to be’ model in a controlled environment.

CONFIGURATION Main functional area Solution match with goals Prototype-allows for thorough testing Attempt to solve logistical problem Configuring reveals strengths & weaknesses Important for success of ERP implementation

As the ERP consultants configure & test the prototype they attempt to solve any logistical problems inherited in the BPR before the actual go-live implementation. STRENGTHS & WEAKNESSES Configuring a company’s system reveals not only the strengths of a company’s business process but also- & perhaps more importantly- its weakness. It is vital to the health of the company & to the success of the ERP implementation that those configuring the system are able to explain what won’t fit into the package & where the gaps in functionality occur.

TESTING: This is the phase where you try to break the system. Here we reach a point where we are testing real case scenarios. The system is configured & now we must come up with extreme case scenarios- system overloads, multiple users logging on at the same time with the same query, users entering invalid data, hackers trying to access restricted areas & so on. The test case must be designed specifically to find the weak links in the system & these bugs should be fixed before going live.