Slide title In CAPITALS 50 pt Slide subtitle 32 pt E2E IMS Interoperability Test Environment Ali Soujeh Senior Specialist, Interoperability Ericsson.

Slides:



Advertisements
Similar presentations
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Standards and Interoperability – Do they matter for ETPs? Dr. Fiona Williams, Research Director, Ericsson.
Advertisements

Slide title In CAPITALS 50 pt Slide subtitle 32 pt European R&D.
Multivendor Interoperability
Windows Server ® 2008 File Services Infrastructure Planning and Design Published: June 2010 Updated: November 2011.
Course: e-Governance Project Lifecycle Day 1
Identifying enablers & disablers to change
Your Technology Is Connected. Are You? Your technology doesn’t exist in a vacuum. Welcome to the networked and interconnected technology ecosystem where.
A concept for ease your business…. At heart, we are a network of people who are passionate about taking on immense challenges that matter to leading organizations,
The Telecom Initiative and WTO Non Tariff Barriers proposals Update May 2009 Per Döfnäs Telefonaktiebolaget LM Ericsson.
Monday, June 01, 2015 Aligning Business Strategy with IT Architecture Board & Governance- Key to Running IT as Business.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Converged SAE / NGN Architecture The ScaleNet Architecture R. Keller, A. Schieder, Ericsson.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Ericsson Nikola Tesla’s view of collaboration between academic communities and enterprises Gordana Kovačević,
Business Continuity and DR, A Practical Implementation Mich Talebzadeh, Consultant, Deutsche Bank
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Ericsson satsning på Public Safety - National Security HIØ Personalseminar – 9. mai 06 - Ed.
Total Quality Management
Slide title In CAPITALS 50 pt Slide subtitle 32 pt WATT WIDE AREA TINY TAGS.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Elements for successful partnership between Enterprise and University Ericsson in Croatia case EUPIDE.
By Saurabh Sardesai October 2014.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Proactive fault management in mobile core network Niko Isotalo Instructor: Ira Antikainen Supervisor:
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Frame Header Based Speech Quality Analysis Method in a Circuit-Switched Media Gateway Master’s Thesis.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt BSNL 3G Network Parameters affecting Data Speed
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Consumers’ Awareness of, Attitudes Towards and Adoption of Mobile Phone Security Stewart Kowalski, Ericsson.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt KPI Reporting and Analysis Templates Naren Mohan
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Improved project management practices as a key to the successful IS implementation Željka Požgaj*, Hrvoje.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Site DB creation and updates 05/08/2006 by Performance Team.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Developing a Testing Process for Remote Usage of Multimedia Messaging Centre Master´s Thesis Presentation.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt ESPA in WCDMA.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt WTO Information Technology Symposium: Convergence and the impact of Globalization Ulf Pehrsson VP Government.
BPK Strategic Planning: Briefing for Denpasar Regional Office Leadership Team Craig Anderson Ahmed Fajarprana August 11-12, 2005.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt The Development of Courseware for Smartphones Judy Nix Ericsson Education Ireland.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Simple DNA draft-krishnan-dna-simple-03 Suresh Krishnan Greg Daley.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Model based development for the RUNES component middleware platform Gabor Batori
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Static Call Admission Control and Dimensioning of Media Gateways in IP based Mobile Core Networks Mika.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Configuration Aware Distributed System Design in Erlang Gabor Batori, Zoltan Theisz, Domonkos Asztalos.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Dynamic and Persistent Scheduling for Voice over IP Traffic in the Long-Term Evolution Uplink Master’s.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
HUAWEI TECHNOLOGIES CO., LTD. Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Risk-based regression testing in a telecommunication system node Master’s thesis presentation
Slide title In CAPITALS 50 pt Slide subtitle 32 pt ANALYSING EFFECTS OF MALFUNCTIONS ON THE PERFORMANCE OF UMTS RADIO ACCESS NETWORKS Author: Antti Keintola.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Ericsson IMS CANTO 2005, St. Kitts Antonio Gómez Business Unit Systems.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Verification of a GPRS Charging System in a Simulated Test Environment Author: Kirsi Koskenheimo Supervisor:
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Ambient Networks Media Delivery in the 3GPP Framework Author: Outi Koski Supervisor: Heikki Hämmäinen.
Planning Definitions 9/25/2015. Components of a Strategic Plan Hinton, K.E. (2012). A Practical Guide to Strategic Planning in Higher Education. Society.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt SEND Certificate Profile draft-krishnan-cgaext-send-cert-eku-01 Suresh Krishnan Ana Kukec Khaja Ahmed.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Some Background about 3GPP SA4’s RTSP extensions Thorsten Lohmar.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt DNA wg IETF71.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Authentication/Authorization for possible deployments Relevant scenarios for CAFE.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Capacity Management in WCDMA.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Simple DNA draft-ietf-dna-simple-03 Suresh Krishnan Greg Daley.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Improvement of Software Delivery Process in the Telecommunications Industry Xian Sun
" The Importance of RM in strategic in sustainable service delivery How to avoid Service Delivery Protest ” Institute of Municipal Finance Officers & Related.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Multi-component KPI:s ETSI/STQ_Mobile(08)18TD10.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt ITU Joint Regional Conference in Alexandria Building secure societies Mr. Kent Halling, Senior Advisor.
TeleManagement Forum The voice of the OSS/BSS industry.
Workshop Discussion on Day-2
Total Quality Management
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
IBM Start Now Host Integration Solutions
Description of Revision
E2E IMS Interoperability Test Environment
MAZARS’ CONSULTING PRACTICE Helping your Business Venture Further
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

Slide title In CAPITALS 50 pt Slide subtitle 32 pt E2E IMS Interoperability Test Environment Ali Soujeh Senior Specialist, Interoperability Ericsson

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2005E2E IMS Interoperability Environment Outline  E2E Interoperability a key element  E2E IMS Interoperability a necessity  Success criteria for E2E IMS Interoperability  E2E IMS IOT Conditions  E2E IMS IOT Network  E2E IMS IOT and ETSI  E2E IMS IOT and Ericsson  Conclusion

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2005E2E IMS Interoperability Environment Access, core Network E2E Interoperability a key element User A1 Operator A User A2User B2 Operator B User B1 UNI NNI With the diversity kept, it’s working thanks to extensive e2e interoperability efforts carried out by the industry. The only way to keep the diversity and keep the operational excellence in the multi-vendor, multi-operator environment is e2e interoperability. operator unique services IMS Network Standardized E2E services operator unique services Standardized E2E services

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2005E2E IMS Interoperability Environment E2E IMS Interoperability a necessity  Conformance and Protocol testing initiatives are necessary but not enough: –Issues related to the E2E perspective is not detected in conformance testing. –In reality, deployment environment of IMS is much more complicated than the simple conformance and protocol testing environment. –New and standardized services are network agnostics, but dependency on legacy systems as the connectivity layer is ignored in conformance and protocol testing.  E2E IMS Interoperability is a quality assurance: –Prove of the concept in reality, validation and improvements of the specifications. –IMS standardization work is incomplete as long as the E2E Interoperability testing is not made a natural part of the standardization effort. –Bi-lateral testing between companies on a continuous basis, involves normally only a small part of the players in the ecosystem, though the major ones. –Multi-lateral E2E IMS Interoperability is a highly appreciated opportunity for the small players of the ecosystem.

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2005E2E IMS Interoperability Environment Success Criteria for E2E IMS IOT  E2E IMS Interoperability MUST be industry driven: –Only the industry can clearly define the boundaries. –Non industry driven activities tends to be never ending, costly, fragmented, unstructured… –Quicker consensus within the industry. Standards shall not create moving targets and keep changing for ever. –Not using the extensive testing experience within the industry is waste of capital. –Re use of deliverables within the industry, reduces testing costs and enriches testing. Giving the developers access to Standardized Interoperability Test Specifications, Trouble Reports and Test Tools ensures high quality testing within the industry and minimizes in the filed issues.  E2E IMS Interoperability MUST be done in a real network Environment: –No simulator is as real as a real network element and component. –Capturing integration issues for new standardized IMS services will ease deployment. –Hand over, Radio shadow, Roaming... Are all scenarios requiring a real network.

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2005E2E IMS Interoperability Environment Success Criteria for E2E IMS IOT, Contd.  E2E IMS Interoperability MUST be performed in different network environments: –Different Networks imply different capabilities and limitations. –Differences in Delays, QoS, Radio network dimensioning, traffic modeling etc...have impacts on the E2E perspective.  E2E IMS Interoperability MUST involve all member categories of the ecosystem: –Service performance, availability and usability is not only a server side issue, but also a client side. –Involvement of the test tool industry will create alignment possibility. –Operators involvement will give the possibility to run E2E interoperability in different network environments and will give an insight about the future integrations issues.  Any serious E2E Interoperability testing initiative MUST guarantee confidentiality of the results: –The aim is to resolve E2E interoperability issues before products are reached to the market. In other words Products can improve, the results are just a snapshot of a products life cycle. –Using the results as marketing tools may not be fare!

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2005E2E IMS Interoperability Environment E2E IMS IOT Conditions  The industry is geographically distributed all over the world: –Travel obstacles and Entry visa barriers –Language barriers –Culture differences  Different markets, different needs: –Statistics from different testing initiatives confirms a clear relation between geography and participation level. –Companies participation frequency in testing events is market dependent.  Test environment in America, Asia and Europe –Major markets –Existence of suitable test environments –Differences in deployment conditions

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2005E2E IMS Interoperability Environment E2E IMS IOT Network  Running a network is a costly business. –Joint activity with other initiatives such as OMA TestFests for IMS based enablers will:  Increase participation  Minimizes the cost for the organizer(s)  Provides the best problem detection occasions, due to presence of different service enablers and implementations –Maintaining network components from different vendors requires exensive knowledge updates. That might be a reason for considering:  Permanent test sites  Connectivity to already existing test sites

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2005E2E IMS Interoperability Environment E2E IMS IOT and ETSI  ETSI is the most suitable standardization body to organize the activity –Extensive experience from organizing such initiatives –Broad member base, opening the door for involving almost the entire industry –Capability in creation of short feedback path, shortening specification updates and initiating specification improvements –A trusted organization capable of keeping confidentiality of the results –Well known and respected standardization body

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2005E2E IMS Interoperability Environment E2E IMS IOT and Ericsson EEricsson as one of the major players in the market, takes it’s responsibility and provides the necessary support –W–We support such initiatives in form of: HHosting events PProviding access to necessary network components SSupporting operators, institutes who offer to host events –E–Ericsson’s support to all recent latest testing events, has proven that we are best in class and play our role seriously!

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2005E2E IMS Interoperability Environment Conclusion  E2E IMS Interoperability testing is a key element in ensuring operational excellence in a multi-vendor and multi-operator environment.  We as Ericsson believe that ETSI, as one of the most respected standardization bodies has an important role to play. ETSI has the capacity to establish the necessary ecosystem, define the boundaries, organize the activity and drive it.  We as Ericsson therefore would like to see a Task Force Team, established by ETSI, with the mission to aggressively take the stand and move the establishment task of the ecosystem, definition of the scope and organizing the activity forward.  Of course as ETSI member, we will be the first company to step forward, participate in and support such a task force team in it’s mission.  In addition we would like to see a time line for the task force team to be established, for the ecosystem to be defined and for the activity to get started.

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2005E2E IMS Interoperability Environment