DOE Transmission Reliability Program Peer Review WAMS Outreach Project: Sharing of Knowledge & Technology John F. Hauer Pacific Northwest National Laboratory.

Slides:



Advertisements
Similar presentations
Advanced Energy Conference New York, NY October 31, 2012
Advertisements

Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
BPAs Generator Model Validation Technique/Tool MVWG Denver, CO May 18-19, 2009 Steve Yang Bonneville Power Administration.
Model Validation in Western Interconnection
Using Synchrophasors for Preventing Cascading Outages
Photos placed in horizontal position with even amount of white space between photos and header Sandia National Laboratories is a multi-program laboratory.
Marianna Vaiman, V&R Energy
New Energy Horizons Opportunities and Challenges Update on IEEE PC Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement.
Washington DC October 2012 A Vision for an Advanced Supervision and Control System for the Electric Grid Ramón A. León XM S.A. E.S.P Colombia.
and Trend for Smart Grid
Synchrophasors: Improving Reliability & Situational Awareness
1 Grid Modernization – A Strategic Imperative for 2050 Advanced Energy Conference May 1, 2013 By Carl Imhoff Electric Infrastructure Sector Manager Pacific.
Prepared by Tony Weekes Husam Al Hadidi Brian Archer.
1 1 Office of Science Lawrence Berkeley National Laboratory Distribution µ PMU Applications Joe Eto Emma Stewart
Introduction to Phasor Measurements Units (PMUs)
Duke Energy Carolinas Smart Grid Investment Grant Tim Bradberry Tim. NASPI Work Group Meeting October 12-13,
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
American Transmission Company Smart Grid Investment Grant Update Jim Kleitsch NASPI Work Group Meeting October 12-13,
Advanced Phasor Measurement Units for the Real-Time Monitoring
DOE Transmission Reliability Program Peer Review WAMS Outreach Projects in FY03 John F. Hauer Pacific Northwest National Laboratory Richland, WA
Review of BPA Voltage Control Conference
Texas Phasor Project ERCOT Reliability and Operations Subcommittee (ROS) February 12, 2009 Milt Holloway, Center for the Commercialization of Electric.
Academic Experience with Wide Area Sensors by Virgilio Centeno Virginia Tech PSC, Distributed Generation, Advanced Metering and Communications March 9,
Synchrophasor Measurement Implementation in ERCOT
© 2011 New York Independent System Operator, Inc. All Rights Reserved. Smart Grid Investment Grant Project Update Jim McNierney Enterprise Architect New.
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 Bulk Power and Reliability Proposed Changes to Form EIA-411.
Monitoring of Active Distribution Networks in Steady State and Transient Conditions by means of accurate synchrophasors measurements Mario Paolone École.
Synchrophasor: Implementation,Testing & Operational Experience
Integrated Security Analysis Pete Sauer, PSERC – Illinois Kevin Tomsovic, PSERC – WSU Steve Widergren, PNNL January 27-29, 2004 Washington, D.C. Transmission.
Frequency Response Initiative Robert W. Cummings Director of System Analysis and Reliability Initiatives NERC Standing Committees September 14-15, 2010.
Lessons Learned from the Texas Synchrophasor Network by Presented at the North American Synchrophasor Initiative (NASPI) Meeting Toronto, Ontario Thursday,
VISUALIZATION WHY WE NEED SYNCHROPHASOR TECHNOLOGY IN OPERATIONS John Ballance – EPG Presented to ERCOT Phasor Technology Workshop – November 16, 2012.
11 PMU simulation and application for power system stability monitoring Harmeet Kang Areva Technology Centre – Stafford, UK Sept MOSCOW.
Roadmap for Real Time Control Transmission Reliability Program Peer Review Washington DC, 27 January 2004 Jeff Dagle, Pacific Northwest National Laboratory.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
Enhanced State Estimation by Advanced Substation Monitoring PSerc Project Review MeetingTexas A&M University November 7, 2001 College Station, TX PIs:
SMART SENSORS FOR A SMARTER GRID BY KAILASH.K AND LAKSHMI NARAYAN.N.
1 Application of Synchrophasor Technology To CREZ System CREZ Technical Conference January 26, 2010 Navin Bhatt American Electric Power.
Eastern Interconnection Phasor Project Modernizing North America’s Electric Grid Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability.
CASE STUDY Disturbance event comparing PMU and SE voltage angle difference in ERCOT Prakash Shrestha Operations Engineer Advanced Network Application.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
DOE Transmission Reliability Program Peer Review WAMS Outreach Project: WECC Model Validation John F. Hauer for Ross Guttromson Pacific Northwest National.
Communication Delays in Wide Area Measurement Systems (WAMS) Biju Naduvathuparambil, Matthew C. Valenti, and Ali Feliachi Lane Department of Comp. Sci.
Overview of Real Time Grid Reliability Management Carl Imhoff Pacific Northwest National Laboratory January 27-29, 2004 Washington, D.C. Transmission Reliability.
A Trust Based Distributed Kalman Filtering Approach for Mode Estimation in Power Systems Tao Jiang, Ion Matei and John S. Baras Institute for Systems Research.
Real Time Tools Outreach Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability Research Review.
November 16, 2012 Synchrophasor Meeting Dynamic Model Validation Project Jonathan Rose Engineer, Resource Integration Sidharth Rajagopalan Engineer, Dynamic.
ECE 476 Power System Analysis Lecture 22: System Protection, Transient Stability Prof. Tom Overbye Dept. of Electrical and Computer Engineering University.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
PJM Interconnection Smart Grid Investment Grant Update
TIMING APPLICATIONS OF GPS High Energy Transmission with High Precision GPS Time Gaurav Sharma John Hannah Vivekanand Sivaraman.
Imagination at work. Paddy McNabb Senior Engineer January 2016 Grid Stability Applications Wide Area Monitoring System.
Slaven Kincic MVWG March System Model Validation Task Force (SMVTF) System Events for System Model Validation o 21th January event:  Colstrip.
1 Dr.Wang Yingtao Engineer Power System Department CEPRI,China Nov 2006 R&D OF REAL TIME DYNAMIC MONITORING SYSTEM IN CHIHA.
Discovery Across Texas: Technology Solutions for Wind Integration in ERCOT Using Synchrophasor Technology for Wind Integration and Event Monitoring in.
2017 WECC JSIS Report March 21, 2017.
ISO-NE Synchrophasor Related Projects
Authors : P. Mukhopadhyay, Abhimanyu Gartia, Samit Kumar Saha,
PMU Emulator for Power System Dynamics Simulators
APPLICATIONS OF GPS IN POWER ENGINEERING
Gaurav Sharma John Hannah Vivekanand Sivaraman
Peak’s Synchronized Measurements and Advanced Real-time Tools (SMART) Working Group (initiated in Oct-2017) Focus on operationalizing Synchrophasor tools.
Gaurav Sharma John Hannah Vivekanand Sivaraman
NASPI PMU Data Application Classification
2017 WECC JSIS Report March 21, 2017.
WISP Follow on Reporting.
NASPI PMU Data Application Classification
Hongming Zhang EMS Applications Manager, PEAK RC
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Presentation transcript:

DOE Transmission Reliability Program Peer Review WAMS Outreach Project: Sharing of Knowledge & Technology John F. Hauer Pacific Northwest National Laboratory Richland, WA Prepared for the Transmission Reliability Program – 2004 Program Peer Review, January 27-29, 2004, Washington, D.C.

Page 1 Project: WAMS Outreach for Sharing of Knowledge & Technology Objectives: 1.Expand the geographic reach of advanced wide area measurement systems (WAMS) to all regions of the North American interconnected grid. 2.Facilitate extraction & use of WAMS information for management of power system reliability & performance. 3.Facilitate development of technology, operational practices, and overall information infrastructure required by the objectives above.

Page 2 Deliverables: (established prior to August 14 Blackout) 1.Assistance in WAMS startup operations (technical advice, DOE/WAMS software, workshops) 2.Application of WAMS technologies (system tests, disturbance analysis, methods development for grid reliability management) 3. Validation of system dynamic performance (assessment of system behavior, comparisons against model results) 4.PMU evaluation & standards (Applications, functional requirements, laboratory tests, field evaluation, dialog with developers of technology & standards) Project: WAMS Outreach for Sharing of Knowledge & Technology

Page 3 Progress in FY03: 1.Extensive support to WECC technical groups in WAMS deployment, system tests, disturbance analysis, and model validation. 2.Several training workshops within the WECC and the eastern interconnection. 3.Extensive advice to developers and vendors of WAMS technology (see activity report for PMU testing). 4.Assistance in data management & analysis for the U.S.-Canada Blackout of August 14, These contributions are reflected in about 40 working documents, including confidential reports and two IEEE publications on the August 14 Blackout. Project: WAMS Outreach for Sharing of Knowledge & Technology

Page 4 WSCC Monitor Facilities Phasor measurement facilities: 8 PDCs (2 linked together) 40 integrated PMUs 7 stand-alone PMUs ~500 primary signals ~3.4 Mbytes per minute PPSM units: ~20 units ~560 primary signals ~2.8 Mbytes per minute Other monitors: ~10 units ~80 primary signals

Page 5 view(0,20) view(-20,20) Keeler-Alston trip oscillation activity breakuposcillations ambient activity Waterfall Display of Dynamic Activity Just Before WSCC Breakup on August 10, 1996

Page 6 AEP & Ameren PMUs on August 14, 2003 Rush Island Callaway Jackson's Ferry Kanawha River Primary disturbance area

Page 7 AEP Kanawha River bus frequency for Aug14 Blackout 12:00-16:10 EDT view(10,70)

Page 8 Measurements Backbone for WAMS East on August 14, 2003 [1] American Electric Power (AEP) 2 PMUs (Macrodyne 1690G), at 12 sps Continuous recording to corporate server software PDC based upon BPA/PNNL DSI tool box Ameren 2 PMUs (ABB RES521), at 60 sps Continuous recording to central PDC BPA PDC [2] Entergy 3 PPSMs (BPA/PNNL), at 20 sps Continuous local recording periodically downloaded to central locations [1]Performance of 'WAMS East' in Providing Dynamic Information for the North East Blackout of August 14, 2003, J. F. Hauer, Navin Bhatt, Kirit Shah, and Sharma Kolluri. IEEE/PES Panel on Major Grid Blackouts of 2003 in North America and Europe, IEEE PES General Meeting, Denver, CO, June 6-12, [2]Summary Description of the BPA Phasor Data Concentrator (PDC), K. E. Martin,. Internal Report of the Bonneville Power Administration, December Available: ftp.bpa.gov/outgoing/WAMS%20Information/

Page 9 Measured vs. state estimator value of Kanawha River bus angle for U.S.-Canada Blackout on August 14, P 3: KNRV Kanawha River Bus KV1 VAngR LcaseID=Blackout030814_AEP5hrAdj casetime=01/06/04_09:23:55 Time in Hours since 14-Aug :00 EDT Measured value AEP state estimator angle relative to Jackson's Ferry bus Data provided by Azra Hasanovic, AEP

Page 10 Evaluation of Phasor Technology

Page 11 Inconsistent Signals for NW Generation Trip Event on April 18, 2002 (initial offsets removed)

Page Pinnacle Pk Bus FreqL caseID=Aug10PMUs_APS_PPKrecs casetime=12/07/01_08:13:54 Time in Seconds Recording time span= 15:47: :57: PMU data from Doug Selin, Arizona Public Service Co. Challenge: Good measurements during protracted off-nominal frequency Western System Breakup on August 10, 1996

Page 13 Bus Frequencies Observed in New York Area for Aug14 Blackout Challenge: Good measurements during protracted off-nominal frequency U.S.-Canada Blackout on August 14, 2003

Page 14 3  voltage 3  current Three Phase Signal Generator Stored Test Signals For Playback Manual Controls Matlab Signal Generation Tools Phasor Data Concentrator (PDC) Data Handler #1 Data Handler #2 PMU 1 * Communication Link #1 Communication Link #2 PMU 2 PMU Network Response Data Real Time StreamReader Matlab Analysis Tools PhasorFile Utility Timing reference *Preferably a reference unit with well known characteristics Geometry and Nomenclature for Laboratory Testing of Synchronized Phasor Networks

Laboratory Tests of PMU Performance (RESERVE SLIDES FOR TECHNICAL QUESTIONS)

Page 16 Desired Characteristics for Next Generation Transducers High resolution & bandwidth, in control applications Rigorous protection against out-of-band input signals Absence of processing artifacts, such as spurious outputs Assured high accuracy, in metering applications Programmable outputs, for versatility of application Good networking options, both local and dial-in Option for synchronizing measurements against a precise external reference Overall affordability, considering all cost elements

Page 17 Fscan000480A /21/03_16:39:57 PMU1 Voltage1 FreqL PMU2 Voltage1 FreqL PMU3 Voltage1 FreqL PMU4 Voltage1 FreqL Input Freq timed to PMU Time in Seconds 1 sample time4 Measured Step Response of Four PMUs (Playback test file Fscan000480A)

Page 18 Measured Filter Performance of Four PMUs (Playback test file Fscan000480A) Fscan000480A Dec30 10/21/03_16:39:57 PMU1 Voltage1 VMag PMU2 Voltage1 VMag PMU3 Voltage1 VMag PMU4 Voltage1 VMag Input Freq timed to PMU4

Page 19 TEST FILE: PMU_Mod6006MseriesB Modulation frequencies are [ ] Hz Dwell is adjusted to yield sufficient response data for each modulation frequency. Note conspicuous aliasing near 30 Hz for PMU_Box4X30 (classical 4-cycle average). Exact frequencies and distortion components (if any) can be closely determined with Prony analysis. TEST ISSUES: a.Aliasing effects b.Modulation harmonics c. Noise levels TEST: Modulation of Balanced Hz carrier

Page 20 Frequency Aliasing in Four PMUs (Playback file Mod6006MseriesB)

Page 21 Relative Timing among Four PMUs (Playback file Mod6006MseriesB) Sorted PRS Table for pole1: TRange=[ ]+24.8 seconds Signal Freq in Hz Damp Ratio (pu) Res Mag Res Angle Rel delay (msec) PMU1 Voltage1 VMag PMU2 Voltage1 VMag PMU3 Voltage1 VMag PMU4 Voltage1 VMag Scaled Compass Plot for mode Hz PMU1 Voltage1 VMag PMU2 Voltage1 VMag PMU3 Voltage1 VMag PMU4 Voltage1 VMag

Page 22 DSItools Simulation, model PMU_Box1X60 Test file PMU_HarmTest5892B Magnitude of Voltage Phasor Time in Seconds H1=58.92 Hz, wt=1.0 H2=2*H1 Hz, wt=0.02 H3=3*H2 Hz, wt=0.05 H1H1+H2H2H3 H1+H2+H3 H1+H3

Evaluating Phasor Network Performance Under Field Conditions (RESERVE SLIDES FOR TECHNICAL QUESTIONS)

Page 24 Bus Angles from BPA State Estimator Compared Against PMU Measurements in BPA SCADA System Table provided by J. J. Graffy, BPA

Page 25 OBSERVATIONS Coverage of state estimator & SCADA extend across more than 1000 miles, but bus angles are consistent within a few degrees. State estimators provide a useful means for checking a new PMU installation for local wiring errors, or for wiring changes that may be needed due to remote transpositions of transmission line conductors. Even a mature state estimator can gain value by the use of PMU data as an independent means to detect incorrect status information or processing errors. Direct incorporation of phase angle data into state estimator calculations seems especially promising for state estimators that draw upon sparse measurements, or that operate in very demanding information environments. Bus Angles from BPA State Estimator Compared Against PMU Measurements in BPA SCADA System

Page 26 Modeshape Analysis to Determine Key Generators for Modeling & Control

Page 27 Relative timing of VMag signals: BCH vs. BPA BCH fault test on December 3, 2003

Page 28 Relative timing of PMU Frequency Signals WECC system event on October 9, NWosc_TimingA ING1 5L52 (PMU typeA) Instrument Freq Time in Seconds since 09-Oct :20: ING1 5L52 (PMU typeA) Estimated Freq

Page NWosc_BCH Time in Seconds since 09-Oct :50: Parasitic Voltage Oscillations in ING1 PMUA WECC system event on October 9, 2003 ING1 5L52 Voltage (PMUA) VMag ING2 5L52 Voltage (PMUB) VMag Data from Harry Lee, BCH