29 MARCH 2010 Captive Blocks : Major Bottlenecks – Land, Environment / Forest Clearances 19.11.2012 4 th Coal Summit 2012 BP Singh Director (Projects),

Slides:



Advertisements
Similar presentations
Thirty-sixth Session of the UN Statistical Commission 1-4 March 2005 New York, USA Keeping Pace with Development: Challenges for the National Statistical.
Advertisements

State Bank of Pakistan Various Departments
POLICY CHANGES REQUIRED FOR INCREASED COAL PRODUCTION BY V K ARORA
Petroleum, Chemicals and Petrochemicals Investment region (PCPIRs) Specialty Chemicals Conclave
RISK ADVISORY SERVICES Green State IT Strictly Private and Confidential 29 September 2014 An initiative towards higher maturity for managing software.
Round Table on Implementing Trade Facilitation in Transition Economies Geneva, 31 May 2002 Strategy for the facilitation of transit transport in Ukraine.
Using Market-Based Instruments to Achieve Environmental Policy Goals: Using Market-Based Instruments to Achieve Environmental Policy Goals: The Case of.
Transportation Strategy Board July 28, 2010 Responsible Growth.
ENPI FLEG Regional Activities: WWF’s Progress, Achievements and Impacts Elena Kulikova Director of Forest Programme WWF Russia.
A presentation on e-Procurement
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
1 September 2, 2011 Secretary Ministry of Economic Affairs ECONOMIC DEVELOPMENT POLICY, FOREIGN DIRECT INVESTMENT AND PRIVATE SECTOR DEVELOPMENT.
 Coal is the primary source of energy in India and accounts for about 55% of the total energy supplies. INTRODUCTION  Coal contributes to the extent.
District Domestic Product compilation and its uses.
Developing Guiding Principles for ICT in Education Policy
Interactive Meeting with Mr Anil Swarup, Additional Secretary, Cabinet Secretariat on “Delayed Projects” FICCI Investment Tracking Mechanism.
MBA (Trimester) Term V Module Title : Project Finance and Management
LAND ACQUISITION WITH SPECIFIC REFERENCE TO PESA & FRA Presented by Collector & DM, Kalahandi.
Neighborhood Preservation and Revitalization Division Board of County Commissioners March 10, Neighborhood Improvement Plan.
1 Framework Required to Ensure Long-term Sustainability - Environmental and Socio- cultural concerns.
Remarks of R.P. Singh CMD, SJVN Limited. Power Scenario in India & Neighboring Countries All India Installed Capacity (As on 30th September, 2014) Sector.
Dubai Government Policies for Enhancing the Competitiveness of Multimodal Transportation and Logistics Cluster June 2014.
Mining Lease Application Assessment: Processes within the Minerals and Energy Division PIRSA.
Load shedding in Pakistan Reasons & Remedies February 9, 2009 By Muhammad Ziauddin.
An update from the National Committee on Levee Safety Presented to the TWCA by Karin M. Jacoby, PE, Esq. June 17, of 14An Involved Public and Reliable.
Roundtable Conference on Coal 2011 Way forward to Meet Demand of Coal Current & Future Assessment for Coal Industry In India by Mr. V K Sehgal Mg Director.
Influence of foreign direct investment on macroeconomic stability Presenter: Governor CBBH: Kemal Kozarić.
Presented by Christopher Msipu Phiri.  Location ◦ South Central part of Africa ◦ Landlocked Country with eight neighbors  Size ◦ Km2  Population.
PREPARATION OF PERSPECTIVE PLAN FOR
National Development Plans Review Saudi Arabia 3 rd and 7 th National Development Plans For: Professor Habib Alshuwaikhat By: Ahmad A. Alkadi CP202 – Planning.
The contents of this document are confidential LEGAL ISSUES IN LAND ACQUISITION FOR LARGE SCALE SOLAR PROJECTS 1 USAID | India Consultation Workshop: Accelerating.
EVALUATION AND APPRAISAL REPORT MAJOR COMMUNITY ISSUES RELATED TO COMPREHENSIVE PLAN Board of County Commissioners/ Local Planning Agency Joint Meeting.
Coal Shortage in India-Way Forward ( ) 1 Coal Shortage in India- Way Forward U Kumar Advisor (Coal Essel Mining & Industries Ltd Aditya Birla Group.
1 Solid Fuel Requirement of Gujarat State A L Thakor, GM (LP&S / P,R&D) - GMDC.
19 November th Coal Summit November th Coal Summit COAL SECTOR MAJOR ISSUES  Domestic Coal shortage has emerged as the.
The Future of Energy Markets in India: Structure and its Regulation Anoop Singh Dept. of Industrial and Management Engineering, Indian Institute of Technology.
Mid Day Meal Scheme AWP&B Arunachal Pradesh.
FOURTH CABINET RETREAT 20 – 21 DECEMBER 2011 PRESENTATION BY MOTIE.
Christopher Sheldon Senior Mining Specialist Mining Policy Division The World Bank Group Integrating Local Economic Development into World Bank Mining.
Special Railways Phase III Proposed approach to regulatory changes Jakarta 16 May 2011.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
Sanjeev Aggarwal Amplus Infrastructure Developers Private Limited Clearances and Land Acquisition for Coal Blocks Way Forward to Meet Demand of Coal.
WP1: IP charter Geneva – 23rd June 2009 Contribution from CERN.
GROWTH MANAGEMENT DEPARTMENT FY Budget Worksession July 11, 2011.
Indian Road Construction. ROAD TRANSPORT SCENARIO Economic Growth : 5 - 6% Road Transport Sector Demand Grows at 10 – 12% Need for Road & Transport Infrastructure.
SEA in the Czech Republic Prague, 24 September 2008.
OVER VIEW OF INDIAN POWER SECTOR INDIAN POWER SECTOR 27 th January, 2010.
1 PRESENTATION TO THE PORTFOLIO COMMITTEE ON THE OVERVIEW OF THE NDPW PRESENTED BY THE TOP MANAGEMENT COMMITTEE 26 MAY 2004.
1 A G2C and G2G portal of Ministry of Environment, Forest and Climate Change, Government of India.
1 T HE R IGHT TO F AIR C OMPENSATION AND T RANSPARENCY IN L AND A CQUISITION, R EHABILITATION AND R ESETTLEMENT A CT,
NCOP PRESENTATION OF THE MINERAL RESOURCES 2010 / 11 BUDGET DATE 12 MAY 2010 DEPARTMENT OF MINERAL RESOURCES.
RENEWABLE ENERGY POTENTIAL IN INDIA
Achievements in IPPC Directive Implementation: problems and constraints Albania Ministry of Environment 3 rd BERCEN Exchange Programme for the Environmental.
UPDATE: One Stop Shop Centre. 3 LOCAL INSTITUTIONS THAT AIM TO ASSIST.
Energy Sector of Turkey “General Overview and Policy Objectives” Sinem ÇAYNAK General Directorate for Energy Affairs IEA Turkey IDR Meeting December 8,
European Structural and Investment Funds for railways in Poland November 2015 Wolfgang Munch, Deputy Head of Unit DG Regional and Urban Policy.
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
The Crash Course for Municipal Planning Commission Members in Cumberland County 1.
NS4960 Spring Term 2017 China: Shift Away from Coal
PRESENTATION ON RFCTLAR&R ACT, 2013 BY Sri Sangram Keshari Mohapatra JOINT SECRETARY, R&DM DEPARTMENT GOVT OF ODISHA.
PRESENTATION OF FINDINGS GRANTEES NEED ASSESSMENT
CHAPTER 5 TECHNICAL ANALYSIS.
The National Land Records Modernization Programme (NLRMP)
Challenges in Financing Renewable Energy
“Regulatory Reforms for Adequate Availability of Natural Resources for Manufacturing” JSW STEEL LTD – JANUARY,
“Iron ore Deadlock : Breaking the Logjam”
FOREST CLEARANCE AND REPLACEMENT IN BRIEF
NS4960 Spring Term 2018 China: Shift Away from Coal
Rail transport developments Agenda point 7.2
India Energy Congress 2013 Sustainable Sources of Energy February 2013.
Presentation transcript:

29 MARCH 2010 Captive Blocks : Major Bottlenecks – Land, Environment / Forest Clearances th Coal Summit 2012 BP Singh Director (Projects), NTPC Ltd.

PRESENTATION OUTLINE Mine Development – The Key Processes Power & Coal Sector Scenario Major Issues / Bottlenecks in Mine Development : Land Acquisition, Forest & Environment Clearances Strategies For Dealing with Bottlenecks

INSTALLED CAPACITY All India total generation capacity 2,09,276 MW* Coal Based Generation capacity 1,20,103 MW (about 57 %) Capacity addition achieved during XI Plan 57,964 MW Coal based Capacity addition 48,540 MW (> 83%) PROJECTED CAPACTIY (Figs in GW) # Terminal Year % GDP Growth Rate % GDP Growth Rate Power Sector Scenario Dependency on Coal will continue as the primary & most reliable source for power generation in India. *Figures as on (Source – CEA Report) # As per Integrated Energy Policy As per Approach Paper for 12 th Plan, capacity addition target is MW, out of which MW through Thermal, MW from Hydro & 5300 MW from Nuclear.

At the end of 12 th plan, coal-based installed capacity of MW envisaged with coal requirement of 842 million tonnes. Capacity Addition & Coal Requirement

S.No Details a)Indigenous coal requirement b)Indigenous coal availability from : i)CIL ii) SCCL35 iii) Captive mines25100 c)Total availability of indigenous coal d)Shortfall in indigenous coal availability (a-c)53242 e)Requirement of imported coal to meet the shortfall in indigenous coal availability f)Requirement of imported coal for imported coal based projects 2440 g)Total requirement of imported coal (e+f) (Fig in Million Tonnes) Source: CEA / MOP, GOI Coal Demand-Supply Scenario in the Power Sector More emphasis required on domestic coal production – Thrust on Captive Mines

Source: CIL/ MOC, GOI Raw Coal Production in India V ery nominal increase in production since last 3 years (Almost Stagnant)

Govt. of India allocated coal blocks for Captive Mining since 1993 Captive Coal Block Allocation Source: MOC No. of Coal Blocks, allocated till date218 De-allocated till date29 Bank Guarantee deducted5 Coal production commenced in about 30 blocks and peak production capacity reached only in 9. ‘Delay in development’ is the reason for de-allocation as cited by MOC. Coal block development schedule of MOC needs a re-look and be made REALISTIC.

Detailed exploration and preparation of GR Mining Plan preparation and approval Land Acquisition Obtaining of Statutory Clearances Infrastructure Development OB Removal & Coal Production Mine Development – Key Processes

PLANNING / FEASIBILITY Exploration / Preparation of Geological Report Surface Master Plan Conducting Studies - Hydrogeological studies - Socio Economic studies - Transport studies - Environmental studies Mining Plan - Approval Land Requirement Applications for Clearances STAGE - I STAGE - II OBTAINING CLEARANCES Forest Clearance Environment Clearance LAND ACQUISITION AND REHABILITATION & RESETTLEMENT OF PAP’s Issuance of Notifications Calculation of Compensation Disbursement of Compensation Rehabilitation Action Plan Physical Possession of Land & Rehabilitation of PAP’s APPOINTMENT OF MDO STAGE - III CREATION OF INFRASTRUCTURE Rail Link Coal Handling Plant Approach Roads MINE DEVELOPMENT Removal of OB Coal Production Stages in Development of Coal Mine

With Regional, Promotional and Detailed Exploration by GSI, CMPDI, SCCL etc., the estimation of coal resources of India reached to 285 Bt. Reserves as on Geological Resources of Coal Proved% IncreaseIndicatedInferredTotal% Increase Exploration in India Source: MOC, GOI Estimates of coal resources during last 6 years : in Million Tonnes Govt of India may put more thrust on enhancement of rate of exploration.

Detailed Exploration As per the guidelines for detailed exploration, boreholes to be drilled in 400 meters interval. In case of detailed exploration in forest area, at present 20 nos. of boreholes allowed in 10 Sq. Km. area. For meaningful Geological Report, at least about 8 nos. of boreholes per Sq. Km. area required. MOEF may allow drilling of 8-10 nos. of boreholes / Sq. Km. in forest area without requirement of forest permission. Local resistance during exploration - State support is of utmost importance.

Main Bottlenecks in Captive Mine Development  Huge time being taken in obtaining of - Forest Clearance - Environment Clearance  Land Acquisition – problematic  Lack of coal transportation infrastructure

Forest Clearance – Long Process

1.Estimation of Land Requirement 2.Application to Nodal Officer/PCCF/DFO for Forest Diversion 3.Survey of forest area, Enumeration of trees and demarcation of Forest land 4.NOC from Village Advisory Committee / Gram Samittee 5.NOC on jungle-jhari land / Revenue forest by State Govt. 6.NOC under FRA DGPS survey & its authentication by State Bodies like ORSAC (in Odisha) 8.Processing of Forest proposal : DFO - CF - CCF/RCCF - PCCF - Secy (Forest) State Govt - MoEF, New Delhi 9.Site Inspection by Regional office of MOEF – Submission of Report to MOEF, New Delhi 10.Presentation to Forest Advisory Committee of MOEF by AIG (Forest) 11.Approval of FAC recommendation by Hon’ble Minister of Env. & Forests 12.Stage-I forest clearance by MoEF, Delhi 13.Demand note from DFO for NPV of trees & Compensatory Afforestation - Payment by block allocatee, Identification of land for compensatory afforestation 14.Submission of compliance report of Stage-I clearance to DFO - CF - CCF/RCCF - PCCF - Secy (Forest) State Govt - MoEF, New Delhi 15.Processing of Stage-II proposal at MOEF – approval by IG / DG, Forests 16.Stage-II clearance from MoEF 17.Order by DFO/RCCF to start demarcation of forest land, Safety zone and CA areas 18.Approval of State Forest Deptt. to start tree felling and transportation of tree logs Forest Clearance – Cumbersome Process MOC schedule stipulates 6 months to complete all these activities – Unrealistic in present scenario

Forest Clearance - Factors contributing to Delay  Issuance of “No-Objection Certificate” on jungle-jhari by Dist Admn.  Issuance of “No-Objection Certificate” on Forest Rights Act by Dist Admn - Conductance of Gram Sabhas & certification of its proceedings.  Old / not updated land records / forest records, Mismatch of habitants / persons in actual possession of the forest land, wrt available land records.  Involvement of number of Central / State Government departments and slow processing of proposal at State Forest Dept. and MOEF.  Site inspection & submission of inspection report by Regional Office of MOEF to MOEF, New Delhi.  Non-availability of alternate land for compensatory afforestation.

Pakri- Barwadih Chatti- Bariatu KerandariTalaipalliDulanga * Important Pre-requisitesTime taken in months Approval of Mining Plan NOC on jungle-jhari NA Process Time taken in months Processing of Stage I proposal by State Govt Site inspection and forwarding of report to MOEF FAC meeting and Stage I approval Stage II clearance49--- Clearance for tree felling6---- * NTPC lost 13 months for Dulanga coal block due to ‘No-Go’ area issue. NTPC’s experience in forest clearance

Forest Clearance – Suggested Measures Regular updation of land and forest records. Creation of land data bank by Forest Dept. in advance for Compensatory Afforestation. State Forest Department need to process the proposals within strict timelines. Process repetition like site inspection by PCCF as well as Regional Office of MOEF, etc. may be avoided. More number of Forest Advisory Committees (FACs) may be constituted by MOEF.

Geological Report Site Clearance / TOR Mining plan Approval Engagement of Agency Preparation of EIA/EMP Submission to SPCB Public Hearing NOC from SPCB Submission of Comprehensive EIA/EMP along with Schedule II Performa to MOEF Clearance by Expert Committee Environment Clearance Stage I Forest Clearance MOC schedule stipulates 6 months to complete all these activities – Unrealistic in present scenario Environment Clearance - Flow Chart

Pakri- Barwadih Chatti- Bariatu KerandariTalaipalliDulanga Key processes causing delaysTime taken in months Conductance of public hearing and NOC from SPCB EAC meeting and grant of clearance *18 * NTPC’s experience in environment clearance * In-principle clearance accorded – final clearance after Stage-I forest clearance

Environment Clearance – Suggested Measures State Pollution Control Board may act in time-bound manner – Public Hearing Report submission Some sort of environment clearance for cluster of coal blocks may be thought of. MOEF may consider more number of Expert Appraisal Committees (EACs).

Land Acquisition – Factors contributing to Delay Processing of proposals / issuance of notifications and disbursement of payment by State Govt. / District Admn. Non-availability of land records / very old records with Dist Admn. Inadequate manpower at Block / Dist. level. Slow processing of Govt. land proposals at various level of State Govt. Absence of Policy for dealing with encroachers of less than 30 yrs. Approval of R&R Plan by State Govt. Local resistance - Law & Order situation Non-standardization of procedures – varying from State to State.

Land Acquisition – Suggested Measures Specialized land acquisition department / agencies by State Governments may facilitate land acquisition process such as IDCO in Odisha, MSIDC in Maharashtra. Special land acquisition cell at Dist. level. Uniform R&R Policy for Coal Mining. Regular updation of land records, digitization. Databank of land for public purposes. Maintenance of comprehensive and intelligent map database. Instant production of Cadastral maps of any scales, themes and sizes. Processing of land proposals – e-filing. Mining Industry can grow only with active support & involvement of State Govt.

Infrastructure Development Most of the major coalfields not connected with Railway infrastructure. Development of Railway infrastructure takes huge time – facing with issues like forest clearance, land acquisition, law & order situation, etc. Support of State Govt. lacks in creation of rail as well as road infrastructure. Obtaining of non-coal bearing area clearance troublesome. Some suggestions : Expeditious development of Rail / Road with State support Dedicated freight / coal corridor Master Network before allocation of coal blocks with firm plan for Rail corridor.

Captive Mining in India to excel To sum up ……..

Conclusion Active support & involvement of respective State Govt. MOC considering ‘Reserve Price’ for coal blocks – Milestone-based payment to State Govt. Special thrust of State Govt. for land record updation & digitization. Expeditious Environment & Forest clearances – Process simplification, Cut short process repetitions, Single-window approach, more nos. of FACs, EACs. Infrastructure Development : Expeditious development of Rail / Road with State support Dedicated freight / coal corridor Master Network before allocation of coal blocks with firm plan for Rail corridor. Special Task Force for monitoring the project implementation. Adoption of latest technology & best practices in Mining (UG & deep OC), deployment of high capacity HEMM, indigenous manufacturing. Incentive to captive coal mines to maximise production & to allow sale of surplus coal to other power generators after meeting own coal requirement for the life of the project.

Thank You