01/07/08I. Ravinovich1 HBD Update Ilia Ravinovich DC Meeting, January 9, 2008.

Slides:



Advertisements
Similar presentations
Prototype Progress… The Stony Brook Crew & Bob Azmoun, Craig Woody.
Advertisements

Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
Machine Tools And Devices For Special Technologies Plasma machining Slovak University of Technology Faculty of Material Science and Technology in Trnava.
Benji Lewis APS April Meeting Hadron Blind Detector implementation during PHENIX Run-10 Benji Lewis On behalf of the PHENIX Collaboration.
1 Stony Brook Update T.K. Hemmick for the Tent Crew.
1 Stony Brook Update More on Voltage Asymmetry T.K. Hemmick.
1 Stony Brook Update Getting Serious about HBD East T.K. Hemmick for the Tent Crew.
Tent Update 5 Feb 2008 Matt Durham for tent crew.
Pelletron Battle – Field Report All Experimenters’ Meeting August 15, 2011 L. Prost (for A. Shemyakin)
CsI Photocathode Production and Testing
1 Stony Brook Update: T.K. Hemmick for the Tent Crew.
HBD Tasks Outline Thomas K Hemmick. New News  Second good QE result from Bob.  New quotes on reduced Glove Box:  $39,000 will not work (air lock too.
Seog Oh/ Duke University/September, 2003 TRT Workshop/ Peniscola, Spain Duke TRT Progress.
1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
HBD Meeting 3/14/06 B. Azmoun BNL Testing and Preparation of HBD Full Scale Prototype for Upcoming Engineering Run Puzzling Behavior of GEM’s To Do List.
1 Stony Brook Update Stretching your LEGS T.K. Hemmick for the tent crew.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
Cube Measurements Tent Crew. Scintillation BNL 241 Am Semi- collimated  Spectralon Diffuse UV Reflector SBD  -Trigger Scint. Light Poisson.
1 Stony Brook Update T.K. Hemmick for the Tent Crew.
1 HBD Update Setback via Gas Accident T.K. Hemmick for the HBD Crew.
1 Update on SB The Stony Brook Crew. 2 QE Reproducible in Addn’l Test Excellent QE again (basically identical). Excellent QE again (basically identical).
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
1 Stony Brook Update: Keep It Clean T.K. Hemmick for the Tent Crew.
1 HBD Plans for run-6 Itzhak Tserruya DC meeting, BNL, October 12, 2005 HBD status Plans for run 6 ( Back-up: details presented in Upgrades meeting yesterday)
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
1 HBD Update Itzhak Tserruya DC meetingJune 10, 2009 June 10, 2009.
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
1 Thomas K Hemmick May 17 th, The Gas Electron Multiplier: GEM Thomas K. Hemmick Stony Brook University.
Gas measurements and CsI photocathode studies at WIS Ilia Ravinovich November 2002 Weizmann Institute.
Prep for Gain Tests: Some Progress, Some Setbacks TKH for the Stony Brook Crew.
1 Progress on Cathodes Thomas K Hemmick, Richard Hutter, Alberica Toia, Bill Anderson, Jason Kamin.
1 HBD Update: DC Meeting June 2006 Thomas K Hemmick for the HBD Crew…
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
1 Sasha Milov DC meeting Nov 9, 2005 HBD upgrade status. Sasha Milov Nov 09, 2005.
1 HBD Towards Run-9 Itzhak Tserruya H/L meeting, April 3, 2008 April 3, 2008.
1 Stony Brook Update T.K. Hemmick for the Tent Crew.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Status Update Stony Brook Crew. Progress on Glove Box None to report. Bids still out. Have enough $$$ for big one. Expect no surprises.
1 Stony Brook Update: Ready to Start… T.K. Hemmick for the Tent Crew.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
Itzhak Tserruya, BNL, May13, HBD R&D Update: Demonstration of Hadron Blindness A. Kozlov, I. Ravinovich, L. Shekhtman and I. Tserruya Weizmann Institute,
HBD Status Report C. Woody For the HBD Crew DC Meeting June 13, 2007.
1 Stony Brook Update Jason Kamin… the Cleaning Machine! T.K. Hemmick.
1 Installation Logistics Itzhak Tserruya HBD meeting BNL, July 6, 2006.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
GEM tests at BNL Zvi, Sasha, Ilia and others. Triple GEM detector tests Last Tuesday after HBD meeting we exchanged CF4 by Ar/CO2 but still there were.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
1 Sasha Milov DC meeting Sept 12, 2007 HBD status Sasha Milov Sept 12, 2007.
1 HBD Update Back to the Future T.K. Hemmick for the HBD crew.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
1 Stony Brook Update: Another Frustrating week... However difference is isolated: CF 4 T.K. Hemmick for the Tent Crew.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
1 HBD R&D: Update Itzhak Tserruya (for A. Kozlov, I. Ravinovich and L. Shekhtman) Weizmann Institute, Rehovot DC meeting Feb. 14, 2003.
1 HBD Update Itzhak Tserruya Upgrades meeting, BNL, October 11, 2005 Full-scale Prototype status Safety Review Detector box construction GEM production.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Gold GEM Recovery Efforts/HBD Updates HBD Meeting 24 June 08.
Recent progress in large THGEM production On behalf of Trieste group and Rui de Oliveira (CERN) S. Levorato RD51 mini week1.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
1 HBD Update Itzhak Tserruya DC meeting, May 7, 2008 May7, 2008.
1 Stony Brook Update Back to the Future T.K. Hemmick.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
P HOTON Y IELD DUE TO S CINTILLATION IN CF4 Bob Azmoun, Craig Woody ( BNL ) Nikolai Smirnov ( Yale University )
1 Some updates on water and other items… Stony Brook HBD Crew…
Update on HBD Activities at BNL Craig Woody BNL HBD Working Group Meeting November 16, 2004.
1 Update from the Tent Thomas K Hemmick for the Tent People.
6/29/2016I. Ravinovich1 HBD status in Run-10 I. Ravinovich WIS.
1 Stony Brook Update Cross Roads T.K. Hemmick for himself.
Presentation transcript:

01/07/08I. Ravinovich1 HBD Update Ilia Ravinovich DC Meeting, January 9, 2008

01/07/08I. Ravinovich2 Main activities on the HBD front During last two months HBD crew has been working on resolving the HV instability issue. The activities were divided into several tasks: 1. BNL+SB+WIS people worked at BNL testing triple GEM stacks to find out the origin of the HV instability. 2. Stony Brook people worked at SB tent to improve the cleanliness of the assembly place, namely the glove box, and the CsI evaporator. 3. BNL people worked at SB to establish a cleaning procedure to recuperate non-performing GEMs.

01/07/08I. Ravinovich3 Triple GEM stack tests at BNL (I) We set up a test facility at BNL using Weizmann equipment that has been used for R&D, for test of the final GEMs and that was specially sent to BNL in November. This includes SS vessel test box, HV divider, preamps, CAEN HV PS etc. The goal was to figure out what is wrong, why the GEM stacks DO work in a stable mode (we did several endurance tests) at WIS and why they show HV instability at SB. I also brought with me in November five fresh standard GEMs from the new (2007) production using a different packaging in order to exclude also the possibility that the standard plastic box shipment did some damage.

01/07/08I. Ravinovich4 Triple GEM stack tests at BNL (II) During my last visit to BNL four triple GEM stacks were assembled and tested: 1. Stack # 1, called “Thanksgiving” stack because it was tested during the Thanksgiving holidays. All three electrodes were standard GEMs that I brought with me. The stack went up to a gain of ~5000 without any problem and showed stable operation. 2. Then we had a number of a stupid technical problems like gas system leaks, bad SHV connectors, broken mesh, CAEN HV PS problem etc. That cost us quite some time but finally we fixed them. 3. Stack # 2 (“Hanukah” stack): all three electrodes were again standard GEMs, a mixture of 2006 and 2007 GEM productions. These GEMs were shipped to SB using usual shipment (plastic box with 24 GEMs packed into a wooden box). This stack also reached stable operation at a gain of 5000.

01/07/08I. Ravinovich5 Triple GEM stack tests at BNL (III) 4. Stack # 3: all three electrodes were again standard GEMs that did not pass SB quality control. Pretest in the clean room showed no problem but going up to 400 V in CF 4 one GEM showed a non-ohmic behavior. We washed it with de-ionized water but without success. 5. Stack # 4 (test stack #1): made of a new Gold plated GEM without CsI (top) and two standard GEMs from the “Hanukah” set (middle and bottom). It had at the beginning 2-3 trips but then showed stable operation at a total voltage of 3700 V corresponding to  V=497 V and a measured gain of There were some more trials to test more stacks just before the Christmas holidays but they failed due to bad GEMs that need cleaning. 7. At that time it was decided that we take all successfully tested GEMs to SB, assemble the stacks inside the glove box and try to reproduce the same results that were obtained at BNL.

01/07/08I. Ravinovich6 Triple GEM stack tests at BNL (IV)

01/07/08I. Ravinovich7 Work at SB (I): Glove box 1. In the meantime the conditions in the glove box at SB have improved dramatically: - purchase of vacuum cleaner installed inside the glove box - particle meter installed inside the glove box 2. The particle meter shows a reading of 400 when blowing inside the stainless steel box as compared to 10,000 previously. 3. It was then decided to take to SB the GEMs successfully tested at BNL, to assemble the stacks inside the glove box and try to reproduce the results obtained at BNL.

01/07/08I. Ravinovich8 Work at SB (II): Glove box Two stacks were successfully installed and tested at Stony Brook reproducing the same results as obtained at BNL. The next step is to evaporate CsI on a Gold plated GEM and repeat the gain test. This test is in progress now as we speak.

01/07/08 Work at SB (III): CsI evaporator SB folks investigated the CsI evaporator with the dust meter and found that inside the unit was clean (class 1000) when they had not disturbed it. The evaporation box and the evaporator walls were relatively clean. However, it was possible to wipe the CsI powder off of a number of surfaces, some severe e.g. the PMT shield. The PMT shield is a SS wall. It is closer to the boats and is a “mirror finish” stainless steel. HUGE quantities of CsI dust are removed by a simple swipe of this plate. It was cleaned with DI water.

01/07/0810 Cleaning the GEMs with de-ionized water At SB, there is excellent de-ionized water: typically 18 M  -cm, alarmed below 16 M  -cm Delivered at “faucet pressure” Can be sprayed forcefully like a rambunctious kid with a garden hose:

01/07/0811 Cleaning success rate: 6 for 6! FIX: GEM 218 (was ok up to 350V but drew non-ohmic current higher than that) FIX: Au#206 dead short strip 15 washed once, no change. second wash + dry Ar at 500V, fixed. FIX: Cu#152: dead short, strip9. FIX: Cu#172: two SST (strips shorted together), strips 2&3 and 24&25. FIX: Au#221: two separate dead shorts. this is the gem that is part of "Test Stack 1". (Story follows…) FIX: Au#230: CsI coated GEM with no resistance. SUMMARY: HARD cleaning (forceful spray) works great and every GEM tested so far has recovered. We will continue to clean through everything we presently have.

01/07/0812 Plans Complete the tests at SB: evaporate CsI and demonstrate smooth ramp up and stable operation at a gain of Clean all GEMs before testing as STD procedure. Remove the 4 stacks assembled in the HBD (they reached operating conditions only after many discharges and 2-3 days conditioning) and retest them after washing. Resume stack assembly in the HBD. We will see how much we have achieved by the end of January and then judge whether we have a chance for an in-beam test before the end of run 8.