· © 2012 Perspectives GmbH PoA Standards Courtney Blodgett Joint Coordination Workshop, Bonn 24 March 2012.

Slides:



Advertisements
Similar presentations
UNFCCC Complexities in demonstration of additionality of a POA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer.
Advertisements

Summary of Public call for Inputs on PoA
Difficulties in Verification of a PoA: DOEs Perspective by Dr. Kaviraj Singh Workshop on Programme of Activities (PoA) under the CDM: Challenges and Road.
The Integration of PoA and NAMA; how can one support the other Ingo Puhl South Pole Carbon Asset Management Ltd. Bonn, 8. May 2011 Prepared by South Pole.
DNV Climate Change Services AS: Trine Kopperud 05 May 2011 DOEs perspective: DOE Liability in context of PoA Workshop on Programme of Activities under.
CONOR BARRY, Team Lead OSD UNFCCC Secretariat SDM programme Setting expectations of the workshop Bonn, 7- 8 May 2011 Workshop on Programme of Activities.
Workshop on Programme of Activities under CDM, Bonn, 7-8 May 2011
UNFCCC Recent Challenges in Implementing PoAs from a Commercial Perspective 8 th May 2011 Mischa Classen Senior Project Manager Regulatory Affairs and.
PoA Challenges & Opportunities
BASELINE STANDARD UNFCCC secretariat workshop
UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
Durban Decisions on the Clean Development Mechanism DUAN Maosheng Chair of the CDM Executive Board First SDM Joint Coordination Workshop Bonn,
Regional Distribution
UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
1 7th Joint Coordination Workshop I 12 March 2011 Investing in PoAs Dr. Francois Beaurain 7th CDM Joint Coordination Workshop 12 March 2011 asset management.
A Project Developers view on lessons learned and challenges with PoAs (module 2.2) 24 March 2012 Mischa Classen Executive Committee, Project Developer.
PoA AFTER Cancun - READY TO TAKE OFF NOW
Zertifizierung Project Cycle – Programme of Activities 7th CDM Joint Coordination Workshop Jun Wang; TÜV NORD CERT GmbH
UNFCCC secretariat, SDM Ronald Twesigye, Fellow A Case Study on The Uganda Municipal Solid Waste Compost Program The Seventh CDM Joint Coordination Workshop.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Conor BARRY Improving and demonstrating efficiency in CDM processes 7 th Joint Coordination.
· © 2011 Perspectives GmbH Programme of Activities Lessons learnt & PoAs as a chance for CDM Host Countries UNFCCC.
UNFCCC, SDM/Standard Setting Unit Janak Shrestha, Programme Officer Current Status- Extension of simplified modalities for demonstration of additionality.
Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.
Validation and verification report templates
Wrap-up session IV Module 4.1, Extension of simplified modalities for demonstration of additionality Mr. Peer Stiansen, CDM EB member 1 st Sustainable.
Defining Standardized Baseline: The role of DNAs Malin Ahlberg Co-Chair of the DNA Forum 13 March 2011, Bonn.
SDM programme, UNFCCC secretariat Wenxin Li, Programme Officer Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
Implementation of the Suppressed Demand Guidelines in New and Existing SSC Methodologies Carolyn Luce, Small Scale Working Group Member FIRST SDM JOINT.
UNFCCC secretariat, programme Gyungae Ha, Programme Officer Ensuring sustainability in project assessment 7 th CDM Joint Coordination Workshop, Bonn, Germany,
Best Practices on PoA Development Dr. Oscar Coto II National CDM Workshop Belize August 2011.
T HE W ORLD B ANK C ARBON F INANCE U NIT Standardised Baselines Framework March 24-25, Bonn.
“Workshop on PoA: Challenges and Road Ahead” Session 10: - Should liability be shared by DOE and PP/CME - Perspectives of DOEs DOE/AIE Forum | Werner Betzenbichler.
UNFCCC secretariat Overview of the PoA and business models Training-Workshop on the “Uganda Municipal Waste Compost Programme” 21st -24th Oct 2013, Mukono.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
TÜV SÜD South Asia Programme of activities (PoA) - Requirements & Challenges in CPA inclusion By Vijayanand TÜV SÜD South Asia
UNFCCC Secretariat Latest updates on PoAs rules including multicounty PoAs Karen Ortega Regional Workshop (31 August - 2 September), Bogota, Colombia.
CDM PoA CPA. What is a Programme of Activities? Definition: A programme of activities (PoA) is a voluntary coordinated action by a private or public.
Programmatic CDM Joergen Fenhann DFC 9. August 2011.
T HE W ORLD B ANK C ARBON F INANCE U NIT PoAs and liability – the issue P RESENTATION AT UNFCCC P O A WORKSHOP M AY 2011 BY F ELICITY S PORS (F
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
Accreditation of Independent entities under JI - Status of JISC work Georg B ø rsting UNFCCC Technical Workshop on Joint Implementation, 9-10 March 2006.
UNFCCC How to address DOE Liability in context of PoA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer Forum.
Regional Programms Climate Change Mitigation Alexandra Soezer Carbon Technical Advisor Bonn, March 24 th 2012.
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF V IETNAM R ENEWABLE E NERGY D EVELOPMENT P ROGRAM (REDP) O PERATIONS.
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF P ROGRAM AND CPA LEVEL MONITORING, P REPARATION OF M ONITORING.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 9.1 „Application of Sampling in.
CFL Lighting Scheme – Bachat Lamp Yojana CDM Requirements.
Module 1.2 – CDM Project Cycle Calibration Calibration through enhanced CDM-AP direct communication with stakeholders (DOEs/ATs) A. Ricardo J. Esparta.
Simplified modalities for demostration additionality to EE and RE projects: Approach to demostrate additionality in micro scale projects in Peru Ministry.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
ENERGY STAR for Residential Light Fixtures Durability Implementation June 23, 2003.
Roundtable on Validation and Verification Issues in LULUCF Projects The World Bank, Washington DC August 24-25, 2009 Issues in Validation of A/R Projects.
Best Practices for Preparing PoA- DD and CPA-DD UNFCCC Workshop on PoAs, 7 May 2011 Dr. Christoph Sutter CEO, South Pole Carbon Asset Management Patrick.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
T HE W ORLD B ANK C ARBON F INANCE U NIT CDM Programmes of Activities : O PPORTUNITIES TO IMPROVE IMPLEMENTATION P RESENTATION AT HCC M EETING, M AY 31,
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 8.1 „Additionality in the context.
Validation and Verification of CDM projects SGS Climate Change Programme Shivananda Shetty Business Manager – SGS India Syed Khursheed Zaidi Operation.
TÜV SÜD Industrie Service GmbH CDM JCW Bonn 12 March 2011 Module 1.2 „existing barriers within the current PoA rules” An analysis from a DOEs perspective.“
Steps for Submission of New Baseline Methodologies National Workshop on Baseline Methodologies CD4CDM Project (Phase II) 31 March – 1 April 2004 Sami Mostafa.
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
OECD Annex I Expert Group CDM Portfolio update Jane Ellis (OECD) AIXG seminar, 21 March 2005.
“Status of the CDM Project Pipeline " Jørgen Fenhann, UNEP Risø Centre Jerba CDM Investment Forum Sept Content of the presentation: 64 CDM.
“Workshop on PoA: Challenges and Road Ahead” Session 2: Challenges in implementation of PoA policy and procedures - Experiences and challenges from the.
Standardized baselines
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Q&A sessions at UNFCCC SB26
Small-Scale Projects Under JI
THE KYOTO PROTOCOL AND BEYOND: A LEGAL PERSPECTIVE, Siena June 10, 2006 The Clean Development Mechanism: Challenges and Opportunities Axel Michaelowa.
Presentation transcript:

· © 2012 Perspectives GmbH PoA Standards Courtney Blodgett Joint Coordination Workshop, Bonn 24 March 2012

· New PoA Standards  Standard for demonstration of additionality, development of eligibility criteria and application of multiple methodologies for Programme of Activities -Approved EB 65  Also relevant: Standard for sampling and surveys for CDM project activities and programmes of activities -Approved EB 65 2

· Key challenges of PoA standards - timing  Deadline of 25 July for uploading for registration -226 PoAs in validation* -15 PoAs submitted in February -Average time for start of comment period to requesting registration: 255 days, approximately 8.5 months -Average time from requesting registration until registration: 100 days (approximately 3.3 months) -= Already a tight schedule for being registered by High number of PoAs in non- LDCs: 32 PoAs in China, 27 in South Africa, 22 in India, 12 in Indonesia, 10 in Kenya  Compliance with the standards adds further complications/ possible delays to validation 3 * March 2012 CDM Pipeline, UNEP Risoe

· Key challenges of PoA standards - Implementation  Co-ordinating & Managing Entity (CME) Manual -Useful document for thinking long term -But adds significant complications during validation -20 – 40 page document -Adds a substantial amount of extra work (and therefore adds to the cost) during validation which adds to the 2012 time pressure -Currently no precedence for a CME manual -A standardized optional template would be useful for facilitating writing and validation 4

· Sampling and survey standards  Single sampling plan covering a group of Component Project Activities (CPAs) now allowed -For micro or small scale PoAs applying a 95/10 confidence/precision -When there is either homogeneity of included CPAs or the differences among the included CPAs is taken into account in the sample size calculation -Highly relevant for i.e. energy efficient lighting and cookstove PoAs  Reduces transaction costs by not needing to sample each and every CPA  Very positive step: remains to be seen how DOEs apply the standards during validation 5

· © 2012 Perspectives GmbH Thank you! Courtney Blodgett +49 (0)