Future Developments at ISOLDE Richard Catherall ISOLDE Technical Coordinator ISOLDE Workshop and Users Meeting 17 th – 19 th December 2012.

Slides:



Advertisements
Similar presentations
ISOLDE WS 2007 Results with ISCOOL a new Radio Frequency Quadrupole Cooler and Buncher at ISOLDE P. Delahaye, H. Frånberg, AB-OP-PSB, ISCOOL, COLLAPS,
Advertisements

Operational aspects 2008 run ISCOOL Isolde workshop Nov 2008 Erwin Siesling.
First Experiments with the Laser Ion Source and Trap (LIST)
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
On-line tests RFQ cooler ISCOOL A quick summary P. Delahaye, H. Frånberg, I. Podadera ISCOOL, COLLAPS, ISOLDE collaboration.
Radioactive Ion Beam (RIB) Production at ISOLDE by the Laser Ion Source and Trap (LIST) Sven Richter for the LIST-, RILIS- and ISOLDE IS456 Collaborations.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
Noyaux CERN- ISOLDE Yorick Blumenfeld.
Target conceptual design WP6, ESR9 CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Serena Cimmino – Stefano.
EN-STI Group meeting 1 st February 2013 EN-STI Group meeting 1 st February 2013 Interventions for LS1 Elodie Macario EN/STI.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
Status of The HIE-ISOLDE Design Study Richard Catherall EN-STI ISCC Meeting 30 th October 2012 CERN.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
CAS, BilbaoMueller, Ugena, Velez, Zerlauth May 31 st v0 SCC – Industrial ADS.
K. Riisager, TA8 ISOLDEEURONS PCC-Meeting, Mainz (Germany), April 2006 Recent highlights from ISOLDE News from the facility –Users meeting, February.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
Richard Catherall EN-STI 2 nd February 2011 ISCC Technical Report & Report from the Standing Group for the Upgrade of ISOLDE.
RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE.
The REXTRAP Penning Trap Pierre Delahaye, CERN/ISOLDE Friedhelm Ames, Pierre Delahaye, Fredrik Wenander and the REXISOLDE collaboration TAS workshop, LPC.
24 January 2001J. Lettry1 ISOLDE Introduction –PSB-beam, Targets –Ion-sources Facility performance –Front-ends and robots –Target production –Safety.
The status and future prospects Fredrik Wenander, ISOLDE workshop 26/ Outline 1.Motivation and physics reach 2.Machine performance 3.Beam-line layout.
Status of the Source of Polarized Ions project for the JINR accelerator complex (June 2013) V.V. Fimushkin, A.D. Kovalenko, L.V. Kutuzova, Yu.V. Prokofichev.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Proton Driver Keith Gollwitzer May 31, Initial Design Overview For design purposes, the following is assumed –H - beam comes from PIP II and follow-on.
RILIS: new advances and future prospects V. Fedosseev for ISCC meeting 10 November 2015.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
Technical report for ISOLDE INTC 19 May 2007 Mats Lindroos.
HIE-ISOLDE Design Study Richard Catherall EN-STI-RBS ISOLDE Workshop and Users Meeting th – 27 th November 2013.
Trends in Heavy Ion Physics Research, Dubna, May Present and future physics possibilities at ISOLDE Karsten Riisager PH Department, CERN
Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
ISOLDE Technical Report Richard Catherall ISOLDE Technical Coordinator 50 th INTC meeting 1 st July 2015.
ISOLDE Technical Report INTC Meeting 31 st October 2012 Richard Catherall EN-STI.
Pekka Suominen 2010 CERN Plasma ion sources for radioactive molecular ion beams.
2 Workshop 2014 Status of the Project Klaus Blaum, MPI for Nuclear Physics, Heidelberg for the Collaboration CERN, Geneva,
Status of the Design Study Richard Catherall EN-STI-RBS.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
LIST status and outlook Sven Richter for the LIST-, RILIS- and Target-Collaborations 21 st of August 2013.
LIEBE: Design of a molten metal target based on a Pb-Bi loop at CERN-ISOLDE 6/25/2014 LIEBE project meeting1 T. De Melo Mendonca, M. Delonca, D. Houngbo,
Riccardo Raabe (IKS, KU Leuven) for the Collaboration INTC 01/02/2012 INTC-O-014 Storage ring facility at HIE-ISOLDE: Technical Design Report.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
An Integrated Remote Target Handling System for CERN’s MEDICIS Radioactive Isotope Production Facility Keith Kershaw, Stefano Marzari, Jean-Louis Grenard.
THE MAFF IH-RFQ TEST STAND AT THE IAP FRANKFURT A. Bechtold, J. Fischbach, D. Habs, O. Kester, M. Pasini, U. Ratzinger, J. Rehberg, M. Reichwein, A. Schempp,
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
HIE-ISOLDE Design Study Safety and Beam Quality Challenges for the HIE-ISOLDE Frontend Jacobo Montaño (EN/STI/RBS) HIE-ISOLDE Workshop, November 2013 *
Linking TSR to ISOLDE Fredrik Wenander, TSR workshop, CERN, Outline 1. Machine parameters 2. Operational experience 3. Beam-line layout 4.
January 30, 2007 CERN Resonant laser ion sources By V. Fedosseev.
Proposal to the INTC, 21. May 2007
Studies for Developing the MW-station Ion Source
Alexander Aleksandrov Spallation Neutron Source Oak Ridge, USA
Richard Catherall EN-STI 2nd February 2011
Workshop, 10/2012 “The Project”
Status of The HIE-ISOLDE Design Study
Technical Report for ISOLDE
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Future R&D: beta-beam Mats Lindroos Mats Lindroos.
Design of a PET-isotope-based hadron therapy facility
ISOLDE Technical report for INTC 21/5/2007
Magdalena Kowalska, CERN PH-SME-IS
EffiCAS Efficient Facility for Ions at CAS
Technical report for ISOLDE INTC 19 May 2007
Technical Report for ISOLDE
ELENA Extra Low ENergy Antiproton Ring
CERN-ISCC Meeting “Storage Ring Facility at HIE-ISOLDE”
Physics Design on Injector I
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Multi-Ion Injector Linac Design – Progress Summary
Presentation transcript:

Future Developments at ISOLDE Richard Catherall ISOLDE Technical Coordinator ISOLDE Workshop and Users Meeting 17 th – 19 th December 2012

Outline Introduction …the last few years Target area – Robots – Hot cell – Access – New storage Target Development – Recent developments – RILIS – ISOLDE Experimental Hall – HIE-ISOLDE Design Study – Extraction electrode – Target developments – Off-line separator – RFQ Cooler – Charge Breeder upgrade

The last few years… 2005 The Class A Labs 2009 REX Shielding 2010 & 2011 Front End and HT tube insulator replacement 2008 ISCOOL

The Future ISOLDE Facility Robot Upgrade

The Target Handling Robot Upgrade 5 Shielded shelves Exchange point

The New ISOLDE Robots

The Target Handling Robot Upgrade: The New Remote Handling System Two industrial 6 axis robots fixed to a suspended 7 th linear axis Radiation resistant – Deported electronics, radiation resistant materials… Complete refurbishment of the system Improved functionalities – Storage, visual inspection More flexibility Large scale mock-up testing before installation 7

Design changes for the new remote handling system Design change of specific parts – New gripper with redundant functions – Implementation of feedback of each status – Control system includes recovery method – No electronics in the target area – Based on a industrial robot and linear transport system 8

The Future ISOLDE Facility Hot Cell Access Target Storage

Hot Cell: Requirements for waste treatment and packaging 10

Hot cell layout 11

Alpha Gamma Hot Cell: Status Functional and technical specifications prepared. – In collaboration with the Paul Scherrer Institute. Invitation to tender September 2012 Project approved by Finance Committee Delivery expected January

CHECK POINT RP PAD CLEFS MMAD EDMS no PAD-MAD Access Installation planned for the end of 2013 Robot barrier will be integrated MAD can be removed for Front End passage

Building 179 extension New storage – Eliminate the need to transport irradiated targets on the CERN site – Easier handling for access to new hot cell – Compatible with new CERN access system (PAD/MAD) – Compatible with new robots – Buffer zone/dispatch Medicis laboratory – New off-line separator connected to RABIT system – Preparation laboratory

The Future ISOLDE Facility Target Development RILIS 2GeV p-beam at ISOLDE

N S RF antenna P fwd ≤ 250 W f RF = 0.01 – 400 MHz RF antenna P fwd ≤ 250 W f RF = 0.01 – 400 MHz Axial magnetic field for Helicon mode generation Two-stage extraction system for improved ion beam quality U el = 0 – 3 kV Two-stage extraction system for improved ion beam quality U el = 0 – 3 kV Plasma chamber SiO 2, Ø = 12 mm, l = 100 mm Plasma chamber SiO 2, Ø = 12 mm, l = 100 mm Gas feed Plasma electrode Tungsten, Ø = 0.9 mm Plasma electrode Tungsten, Ø = 0.9 mm  Developed by the TISD group for the production of CO + and CO 2 +, N 2 +, and noble gas beams;  First online operation 2011/09, upgraded system tested 2012/11;  Strong gain achieved on 10 CO and 11 CO; HfO 2 target, T = 1700K buffer gas: 97% Ar, 3% CO 2 10 CO 11 CO 15 CO 16 CO The Helicon ion source

LIST device:LIST assembly: Ion repeller  LIST was successfully tested with UCx-target -> No loss of performance over 5 days  Suppression of Na-, Al-, K-, Fr-, U-isotopes studied -> Suppression factors varied from 100 to 1000  Laser ionization of radioactive Mg and Po in LIST Laser ionized 30 Mg Suppressed 26 Na, 46 K LIST mode RILIS mode Fr suppression and laser ionization of Po in LIST First ever LIST on-line physics result: hyperfine structure of 217 Po Ionization and suppression of contaminants by LIST: Laser Ion Source and Trap (LIST) On-Line at ISOLDE RF terminals By Daniel Fink

INTC – IS Ne ISOL ISOLDE from static salt target: Concept Salt condensation Yield, D [m2/s] T. Mendonca (CERN), E. Noah (UNIGE), R. Hodak (Comenius univ), M. Allibert, V. Ghetta (LPSC) TISD team (S. Cimino, S. Marzari), EN-MME, TE-VSC Featured (with 6 He beams) in CERN activity report and EPN (43/5) * And record yields of 11C as CO+ Static molten salt target for 18 Ne* for  -beams

Tests of simulations with geometry I: Predicted n-rich Zn/Rb improvement of ~ x20 New converter geometry I : 5 e 3 80Zn, 5 e 1 80Rb /  C Zn, ~5 e 2 81Rb/  C  Measured improvement ca x200 ( instead of x20) Yet some teething problems: clear thermal and mechanical weaknesses Onboard for phase II (2014): Keeping the same Impurity/beam improvement, and increase of yield R. Luis et al, EPJ A 2012 TISD team, S. Marzari, B. Crepieux New n converter – phase I

ISOLDE RILIS future developments Investigate RILIS for refractory metals at ISOLDE Improved RILIS schemes for the Dual RILIS system IONIZATION SCHEMES Installation of a reference cell at RILIS Pulsed amplification of CW seeded Dye laser or TiSa Improved motorzation of Narrow-band TiSa IN-SOURCE SPECTROSCOPY Further optimization of LIST Improving the laser ion time structure or using a time focus for effective beam gating SELECTIVITY IMPROVEMENTS Extension of RILIS cabin -Enlarged entrance/storage and work area to maximize the useable laser laboratory space Implement a dedicated, high power Nd:YAG laser for non resonant ionization -High beam quality industrial laser could significantly improve efficiency for many schemes. -Would simplify RILIS setup, increase reliability and reduce setup time. -Testing is underway this week GENERAL RILIS DEVELOPMENTS On-call operation -Installation of a machine protection and monitoring system to reduce reliance on shift-based operation -To be implemented during LS1

Blaze laser test Test of non-resonant ionization step for the gallium scheme Blaze laser installed at RILIS on Monday 17 th Dec! >2x efficiency improvement for Ga! x2.2 40W at 10 kHz 17ns Pulse Low Jitter Gaussian beam Much better transmission efficiency to ion source A similar efficiency improvement should be expected for the 17 RILIS elements that use non-resonant ionization for the final step!

2 GeV proton ISOLDE Extension of the 2GeV energy upgrade of the PS-Booster Letter of Intent submitted to Research Board Isotopes produced from fission reactions gain x1.4 on average Fragmentation products gain x2 to x5 Spallation products gain of more than x6 for exotic isotopes.

The Future ISOLDE Facility ISOLDE

Combine HIE-ISOLDE beams with Heidelberg heavy-ion Test Storage Ring TSR at MPI-K Heidelberg First storage ring with ISOL-facility! Circumference: m Vacuum: ~few 1E-11 mbar Acceptance: 100 mm mrad Multiturn injection: mA current Electron cooler: transverse T cool in order of 1 s RF acceleration and deceleration possible TSR and HIE-ISOLDE, a nice couple with: broad range of elements and isotopes wide energy range e-cooled beams cw beams in-ring and external experiments

HIE/REX and TSR compatible 1. REX/HIE and TSR well adapted energy wise IonZqA/qBreeding time (ms) 7 Be F Ni Sn Sn * 182 Pb * 182 Pb EBIS upgrade needed * to be tested A/q = 4.5 W = 10.2 MeV/u βγ = A/q = 2.5 W = 16.8 MeV/u βγ = HIE stage 2b 2. Need to hold the ions for up to 2 s in REX low energy stage => REXTRAP essential Many different ways of operating the TSR 3. REXEBIS capable of producing sufficiently low A/q for almost all elements (< 10 MeV/u)

TSR ISOLDE HIE-HEBT HIE-Linac extraction line Proposed layout to fit the TSR: * Installation above the CERN service-tunnel * Tilted beam-line coming up from the machine. * Injection beam-line calculated * Study of building performed Possible TSR installation

1. TSR at ISOLDE technical design report M. Grieser et al., EPJ Special Topics May 2012, vol 207, Issue 1, pp Approved by CERN Research board, May 2012 “The installation of TSR, as an experiment to be included in the HIE-ISOLDE programme, was approved by the Research Board. The timescale will be defined once the study of its integration has been completed.” Next steps Within HIE-ISOLDE project Charge breeder upgrade study to: A.Cover all TSR physics casesB. Go to >10 MeV/u beam energy Bare nuclei up to Z~60 Li-like to U 3. Integration study on-going Report to CERN management Q3 2013

The HIE-ISOLDE Design Study Baseline parameters due to Linac 4 and PSB upgrade 1x10 14 protons per bunch (3x10 13 ) 900ms Booster supercycle? (1200ms) 2GeV beam energy? (1.4GeV) ~ 14kW of primary beam (2.8kW)

Redesign of Extraction System Fixed electrodes, larger apertures, simpler and more compact frame See poster by Jacobo Montano Carrizales

Thermal Studies Re-design of target – Indirect heating of target container – Uniform heat distribution across the target container – Heat pipes for cooling

Off-line 2 Mass Separator Layout A test bench for validation FE FE + RFQ FE + RFQ + 90° magnet FE + WF + RFQ + 90° magnet

RFQ Cooler Approach – Alignment Adjustable alignment of the electrodes – Pressure gradient Reduce pressure at injection and extraction electrodes by adding more holes to the plates RFQ Cooler will be part of the test stand Drawings done and procurement started RFQ Cooler design report done CST Particle Studio used: – To simulate particle trajectories – To provide acceptances on parts of the machine – To diagnose electrical charge build up – Shapes, voltages and distances can be simulated Carla Babcock

Important changes compared to REXEBIS: Electron energy increase (x30) : HV design Electron current increase (x10-20): HEC 2 electron gun Current density increase (x50-100) : high compression Brillouin type gun, magnetic field increase ( 2 → 6 T) Current increase (x10-20) + HV: high power dissipation at the collector Current increase + XHV: distributed differential pumping system Design layout for breeder upgrade

Summary An impressive transformation of the ISOLDE Facility is planned for the coming years – Target area – Medicis – HIE-ISOLDE – – Target development There will be an inevitable impact on operations – Resources – RIBs > from target to TSR – Safety, Access…

Thank you for your attention Acknowledgements – T. Stora – B. Marsh – K. Flanagan – S. Marzari – F. Wenander – J-L Grenard – A. Shornikov – J. Montano – C. Babcock – S. Cimmino – T. Giles – V. Barozier – M. Kronberger – A. Stadler – …and the ISOLDE Collaboration