Lecture 5: Value At Risk.

Slides:



Advertisements
Similar presentations
Chapter 25 Risk Assessment. Introduction Risk assessment is the evaluation of distributions of outcomes, with a focus on the worse that might happen.
Advertisements

COMM 472: Quantitative Analysis of Financial Decisions
Asset Pricing. Pricing Determining a fair value (price) for an investment is an important task. At the beginning of the semester, we dealt with the pricing.
McGraw-Hill/Irwin Copyright © 2004 by the McGraw-Hill Companies, Inc. All rights reserved. Chapter 3 Risk Identification and Measurement.
Chapter 21 Value at Risk Options, Futures, and Other Derivatives, 8th Edition, Copyright © John C. Hull 2012.
VAR.
Chapter 21 Value at Risk Options, Futures, and Other Derivatives, 8th Edition, Copyright © John C. Hull 2012.
Sensitivity and Scenario Analysis
Value at Risk Concepts, data, industry estimates –Adam Hoppes –Moses Chao Portfolio applications –Cathy Li –Muthu Ramanujam Comparison to volatility and.
RISK VALUATION. Risk can be valued using : Derivatives Valuation –Using valuation method –Value the gain Risk Management Valuation –Using statistical.
Value-at-Risk on a portfolio of Options, Futures and Equities Radhesh Agarwal (Ral13001) Shashank Agarwal (Sal13003) Sumit Jalan (Sjn13024)
4.1 Option Prices: numerical approach Lecture Pricing: 1.Binomial Trees.
CHAPTER 10 Overcoming VaR's Limitations. INTRODUCTION While VaR is the single best way to measure risk, it does have several limitations. The most pressing.
Market-Risk Measurement
Drake DRAKE UNIVERSITY Fin 288 Valuing Options Using Binomial Trees.
Value at Risk (VAR) VAR is the maximum loss over a target
Copyright K.Cuthbertson, D. Nitzsche 1 FINANCIAL ENGINEERING: DERIVATIVES AND RISK MANAGEMENT (J. Wiley, 2001) K. Cuthbertson and D. Nitzsche Lecture VaR:
Lecture: 4 - Measuring Risk (Return Volatility) I.Uncertain Cash Flows - Risk Adjustment II.We Want a Measure of Risk With the Following Features a. Easy.
Economics 434 – Financial Market Theory Tuesday, August 25, 2009 Tuesday, August 24, 2010Tuesday, September 21, 2010Thursday, October 7, 2010 Economics.
JUMP DIFFUSION MODELS Karina Mignone Option Pricing under Jump Diffusion.
Options, Futures, and Other Derivatives 6 th Edition, Copyright © John C. Hull Chapter 18 Value at Risk.
Value at Risk.
Lecture 7: Simulations.
Measuring Returns Converting Dollar Returns to Percentage Returns
Understanding Risk. 1.What is risk? 2.How can we measure risk?
Advanced Risk Management I Lecture 6 Non-linear portfolios.
1 MBF 2263 Portfolio Management & Security Analysis Lecture 2 Risk and Return.
Alternative Measures of Risk. The Optimal Risk Measure Desirable Properties for Risk Measure A risk measure maps the whole distribution of one dollar.
Diversification and Portfolio Risk Asset Allocation With Two Risky Assets 6-1.
Investment Analysis and Portfolio management Lecture: 24 Course Code: MBF702.
Probability Rules!. ● Probability relates short-term results to long-term results ● An example  A short term result – what is the chance of getting a.
LECTURE 22 VAR 1. Methods of calculating VAR (Cont.) Correlation method is conceptually simple and easy to apply; it only requires the mean returns and.
Chapter 13 Wiener Processes and Itô’s Lemma
Vegas Baby A trip to Vegas is just a sample of a random variable (i.e. 100 card games, 100 slot plays or 100 video poker games) Which is more likely? Win.
Lecture 6: Value At Risk Part 2. What we will learn in this lecture A recap on the end of last weeks lecture How we can extend our ideas of mean and variance.
Investment Risk Eric Higgins Department of Finance, KSU.
Chapter 7 – Risk, Return and the Security Market Line  Learning Objectives  Calculate Profit and Returns  Convert Holding Period Returns (HPR) to APR.
UNDERSTANDING RISK AND RETURN CHAPTER TWO Practical Investment Management Robert A. Strong.
Chapter 08 Risk and Rate of Return
PROBABILITY CONCEPTS Key concepts are described Probability rules are introduced Expected values, standard deviation, covariance and correlation for individual.
Fundamentals of Futures and Options Markets, 5 th Edition, Copyright © John C. Hull Value at Risk Chapter 18.
Value at Risk Chapter 16. The Question Being Asked in VaR “What loss level is such that we are X % confident it will not be exceeded in N business days?”
Investment Risk and Return. Learning Goals Know the concept of risk and return and their relationship How to measure risk and return What is Capital Asset.
Risk Analysis & Modelling Lecture 2: Measuring Risk.
Diversification of Parameter Uncertainty Eric R. Ulm Georgia State University.
Class Business Personal Data Sheets Groups Stock-Trak Upcoming Homework.
Risk Analysis & Modelling Lecture 10: Extreme Value Theory.
Monte-Carlo Simulations Seminar Project. Task  To Build an application in Excel/VBA to solve option prices.  Use a stochastic volatility in the model.
CDA COLLEGE BUS235: PRINCIPLES OF FINANCIAL ANALYSIS Lecture 3 Lecture 3 Lecturer: Kleanthis Zisimos.
INTRODUCTION For a given set of securities, any number of portfolios can be constructed. A rational investor attempts to find the most efficient of these.
 Measures the potential loss in value of a risky asset or portfolio over a defined period for a given confidence interval  For example: ◦ If the VaR.
Value at Risk Chapter 20 Options, Futures, and Other Derivatives, 7th International Edition, Copyright © John C. Hull 2008.
Lecture 8: Risk Modelling Insurance Company Asset-Liability.
The Black-Scholes-Merton Model Chapter B-S-M model is used to determine the option price of any underlying stock. They believed that stock follow.
1 BA 555 Practical Business Analysis Linear Programming (LP) Sensitivity Analysis Simulation Agenda.
Last Study Topics 75 Years of Capital Market History Measuring Risk
Options, Futures, and Other Derivatives, 5th edition © 2002 by John C. Hull 16.1 Value at Risk Chapter 16.
Options, Futures, and Other Derivatives, 4th edition © 1999 by John C. Hull 14.1 Value at Risk Chapter 14.
OPTIONS PRICING AND HEDGING WITH GARCH.THE PRICING KERNEL.HULL AND WHITE.THE PLUG-IN ESTIMATOR AND GARCH GAMMA.ENGLE-MUSTAFA – IMPLIED GARCH.DUAN AND EXTENSIONS.ENGLE.
Money and Banking Lecture 11. Review of the Previous Lecture Application of Present Value Concept Internal Rate of Return Bond Pricing Real Vs Nominal.
Chapter 13 Wiener Processes and Itô’s Lemma 1. Stochastic Processes Describes the way in which a variable such as a stock price, exchange rate or interest.
Chapter 5 Understanding Risk
5. Volatility, sensitivity and VaR
Market-Risk Measurement
Risk and Return in Capital Markets
Chapter 11 Risk ad Return in Capital markets.
Chapter Five Understanding Risk.
Chapter 3 Statistical Concepts.
Chapter 14 Wiener Processes and Itô’s Lemma
Statistical analysis and its application
Presentation transcript:

Lecture 5: Value At Risk

http://www.angelfire.com/linux/lecturenotes

What We Will Learn In This Lecture We will look at the idea of a stochastic process We will look at how our ideas of mean and variance of proportional change relate to the concept of a stochastic process We will look at the core concepts of Value At Risk and how they relate to the principles of stochastic processes

Random Variables In Sequence So far we have been thinking of random variables as ‘singular’ events. We have viewed random variables as single events that occur in isolation and not as part of an accumulative process across time. Movements in stock market prices or insurance company claims are not unique events but are a random processes that accumulate on a daily or hourly basis. We need to deal with random variables that behave as a sequences.

Our Thought Experiment We have a coin that we flip If it is heads we win £1 and if it is tails we lose £1 If we play this game once we can simply describe the outcomes in terms the 2 possible outcomes We could even describe the risks interms of the mean and variance of the outcomes. But what if we want to discuss the risk for people who play the game 10 times, 20 times, 1000 times? The amount the person stands to loose is obviously the accumulation of a series of individual random events (coin flips) We will call this accumulated sequence a random processes

Graph Of A Possible Game Total Winnings +£10 £0 Number Of Games Played -£10 Total Losses

The Expected Payoff And Variance Of Payoff Let us say we play with games 100’s of times for a sequence of 5 flips of the coin and from this sample calculate the mean and variance of Payoff for games involving 5 flips We will find that on average our payoff is zero and the standard deviation of payoff is 2.23 If we were to look at the mean and standard deviation of outcomes for various numbers of games played we would find the following: Games Played Expected Payoff Std Dev Payoff 2 1.414 3 1.731 4 5 2.236

Standard Deviation Of Payoff As the number of games played increase the standard deviation increases, but it increases at a decreasing rate.

Intuitive Explanation Our simple stochastic process made up of flipping a coin has produced an interesting result. As the number of steps in the stochastic process increases the standard deviation of the process increases but increases at a decreasing rate. By drawing out a tree of the outcomes we can see the as the number of steps increases the range of outcomes increases but at the same time the number of paths leading to the “centre” increases. These two offsetting results lead to the increase of variance at a decreasing rate. This is very similar to the result we observed for diversification in a portfolio, you can think of it as diversification across time!

Note: Also known as Pascal’s Triangle Density of Outcomes Steps 1 H T 1 1 T H H T 1 2 1 T H H T T H 1 3 3 1 T H H T H T H T 1 4 6 4 1 Note: Also known as Pascal’s Triangle

A Markov Chain Our simple stochastic process involving flipping a coin and adding the payoffs is an example of a Markov Chain A Markov Chain is where the probability of the various future outcomes is only dependent upon the current position of the sequence and not the path that led to that position In general path dependant processes need to be analysed using Monte Carlo simulations An example of a path dependant process is the modelling of an insurance company cash flows since bankruptcy introduces a ‘barrier’

What We Observe We normally observe the process and from that need to derive the stochastic behaviour of the change In the previous case would could derive a probability distribution for the payoffs of a single flip by differencing the process of Total Winnings and drawing an associated histogram If we were to do this we would see that we have a 50% chance of winning £1 and 50% chance of loosing £1 If the process was not a Markov chain we could not do this! Why?

Stock Price Stochastic Process The stochastic process we will use to model stock prices (and other assets/liabilities) is based on Brownian Motion or Wiener Process A Wiener Process is a stationary Markov Chain The proportional change is at each step is a random number sampled from a normal distribution These proportional changes ‘compound’ over time to produce the movements in stock prices This ‘compounding’ is different from the accumulation we saw in the coin flipping example

Stochastic Process Price At each step the proportional change in the stock price is a random variable from a normal distribution ? Time

Distribution For Tomorrows Price The stock price today is P0 and we know that the daily returns are taken from a normal distribution with mean m and standard deviation s then we can say that the price tomorrow P1 is: Where r0 the random variable representing daily returns We can see that the distribution for P1 is also normal We can use the normal distribution to describe the various outcomes for P1 Note that this is a Markov process, why?

Distribution Of Future Prices Let us extend this out to the probability distribution for the price the day after tomorrow: P2 is not normally distributed! It will be a Chi-Squared distribution because of the product of r0 and r1

We Need A Different Definition of Returns! The standard definition of returns makes the probability distribution of prices beyond one step in the future complex One solution would be to ignore the compounding effect of returns which would get arid of the nasty cross product term: This would mean that P2 would be normally distributed but will lead to other problems…

Continuously Compounded Returns Instead of defining returns like this: We will see that the continuously compounded definition is better:

Where Do Continuously Compounded Returns Come From? Imagine you have £100 in your bank and you earn a 10% annual interest on that amount, at the end of the year you will have 110 in you account: 100 *(1+0.1) Let us say your bank now pays interest semi-annually, what rate would they have to pay you to give you the same £110 at the end of the year? Notice that it is slightly smaller, why is that?

What Happens As We Compound Over Very Short Periods? In general we can define the compounding rate as: As n approaches infinity the value converges to a non-infinite value: Where e is a special number like p and is equal to 2.718282..

General Equations The relationship between P1 and P0 for a given continuously compounded return r is: And by taking natural logs of both side we can see that we can calculate the continuously compounded return as

Why Continuously Compounded Returns Are Good Let us say we know that continuously compounded returns are described by a normal distribution The relationship between the price today P0 and the price tomorrow P1, where r0 is today’s random proportional change P1 is log normally distributed

Now the relationship between P0 and P2 The relationship between P0 and PT where

Because e is a special type of function with a unique one-to-one mapping between the domain and range we can map the probability of observing a given P directly to the probability of observing a given R Random Prices (map) Random Returns (domain) There is a unique one-to-one mapping between a given random return and a given random price, therefore we say that the probability of observing a random price is determined by the probability of observing the random return it relates to!

The Behaviour Of Continuously Compounded Returns Across Time We have noted that continuously compounded returns over say a T day period time is simply equal to the sum of the individual random returns observed on each of those T days Also we can say that if prices are a Markov Chain then each of those return is sampled from the same distribution So we could say:

R will be normally distributed since it is the sum of T normally distributed normal variables The mean of R’s distribution will be T.m and the standard deviation T1/2.s Probability Distribution of R T1/2.s T.m -1.96.T1/2.s T.m +1.96.T1/2.s T.m Lower 2.5% tail Upper 2.5% tail

Lognormal Probability Distribution of P(T) P0.em*T Upper 2.5% tail Lower 2.5% tail

An example Imagine the price today is 100 and we know that the daily continuously compounded return follow a normal distribution with a mean of 0.3% and standard deviation of 0.1% Calculate the expected value of return in two days, the return which will only expect to see values greater than 2.5% of the time and the expected return we only expect to see values less than 2.5% of the time Translating these to values to the levels for prices:

Price Diffusion Boundaries Upper Probabilistic Boundary Expected Path Lower Probabilistic Boundary 100 Time

Value At Risk Value-At-Risk can be defined as “An estimate, with a given degree of confidence, of how much one can lose from one’s portfolio over a given time horizon”. It is very useful because it tells us exactly what we are interested in: what we could loose on a bad day Our previous ideas of mean and variance of return on a portfolio were abstract VaR gives us a very concrete definition of risk, such as, we can say with 99% certainty we will not loose more than X on a given day “Value at Risk” is literally the value we stand to lose or the value at risk!

The Value Of Risk On A Portfolio We are normally interested in describing the value at risk on a portfolio of assets and liabilities We know how to describe mean and variance of return on our portfolio interms of the mean, variance and covariance of returns on the assets and liabilities it contains We will now use this to describe the stochastic process of the portfolio’s value across time From this stochastic process of the portfolio’s value we will estimate the Value At Risk for a given time horizon

Our Method We can derive the continuously compounded mean and variance of a portfolio’s continuously compounded return for a portfolio from the expected return and covariance matrix of continually compounded returns for the assets it contains Under the assumption that the proportional changes in the portfolio’s value are normally distributed we can translate the mean and variance of these proportional changes to the diffusion of the portfolios value across time Using the diffusion process we can put a probabilistic lower bound of the portfolios value across time: So for example if we wanted to calculate the value of the portfolio we would only be bellow 2.5% of the time we would use the formula: Where m is the mean of returns on the portfolio and s is the standard deviation of returns on the portfolio

Portfolio Value Diffusion Value At Risk At Time T Expected Path For Portfolio PV0 Portfolio Value Will Only Go Bellow this 2.5% of the time Time T

Other Confidence Intervals The number -1.96 is the number of standard deviations bellow the mean we must go to be sure that only 2.5% of the observation that can be sampled from that normal distribution will be bellow that level Sometimes we might want to be even more confident such that say only 1% of the possible outcomes is bellow our value (-2.32 standard deviations bellow the mean) We can use the Excel Function NORMSINV to calculate the number of standard deviations bellow the mean we must go for a given level of confidence. For Example NORMSINV(0.01) = -2.32.

Zero Drift VaR One thing to notice is that the drift in the portfolio value introduced by a positive expected return can mean the Value at Risk is negative (ie we don’t expect to lose money even in the worse case scenario)! Sometimes VaR is calculated under the assumption that expected returns on the portfolio are zero: This is used as an estimate of VaR over short time periods such as days, or where we are uncertain of our estimates of expected return.

Diversified & Undiversified VaR Diversified VaR relates to the situation where we use estimates of the covariances of the portfolio’s assets to reflect their actual value Undiversified VaR is where we restrict all the correlations between the assets to be 1 (ie perfect correlation). This is a pessimistic calculation and is based on the observation that in a crash correlations between assets are high (ie everything goes down)