Courtesy of Holbert Apple Associates. 8621 Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Jonathan E. Aberts Spring 2009
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
BWI Hilton Hotel Thomas Sabol The Pennsylvania State University
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
Duquesne University Forbes Expansion
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
Mathew Nirenberg AE Senior Thesis Structural Option.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Third Avenue NY, New York Michelle L. Mentzer Structural Option.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
N EW Y ORK, N EW Y ORK 100 Eleventh Avenue © Tyler E. Graybill | Structural Option AE Senior Thesis Presentation | April 12, 2010 Faculty.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
 Building Background  Building Structural System  Problem Statement  Proposed Solution  Structural Investigations  Architectural Impact  Sustainability.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Nijad Rudy Boukhalil structural option spring’05.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
Student Health Center Jacob Brambley - AE (structural option)
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Hunter Woron Spring 2012 Structural Professor Parfitt.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Pearl Condominiums Philadelphia, PA
CONDOMINIUM TOWER & PARKING
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Outline Introduction Structural Redesign Gravity System
Ryan Johnson - Structural Option
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
RiverView Condominiums II Chicago, IL
Presentation transcript:

Courtesy of Holbert Apple Associates

8621 Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Building Introduction Owner: FP Wilco, LLC Structural Engineering: Holbert Apple Associates Size: 347,000 GSF Stories: 17 Height: 162 ft. Cost: $52 Million January 2015– February 2017 Courtesy of Holbert Apple Associates

8621 Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Building Introduction Occupancy: 13 floors of apartments 4 floors of parking & retail, etc. Features: - Geometry change at level 5 - Green Roof - Rooftop pool

8621 Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Gravity System - 8” slab w/ 4” drop panels ” post-tensioned flat plate

8621 Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Gravity System Two way PT system -Banded Tendons -Uniformly Distributed Tendons

8621 Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Lateral System -Ordinary Reinforced Concrete Shear Walls - 12” or 14” thick - located near stair and elevator cores - Additional beams added in parking garage

8621 Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Lateral System -Ordinary Reinforced Concrete Shear Walls - 12” or 14” thick - located near stair and elevator cores - Additional beams added in parking garage - Shear Walls vary in height

8621 Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Problem Statement - Building is acceptable as designed Proposed Solution - Consider impact on: - Architecture - Foundations - Vibrations - Cost - Scenario: redesign the apartment levels in steel - Compare overall project cost - Investigate effects on foundations and lateral system - Move a level of parking garage below grade - Design apartment levels using composite beams and girders - Create a modular bay size and column locations

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Gravity Redesign

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Typical Bay/Columns -Square → Rectangular Bays -Move Columns onto grid -Mirror building proportions in bay proportions ft. 192 ft.

8621 Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Parking Space OrientationMinimum Throughway Width 90° spaces24 feet 60° spaces18 feet Typical Bay/Columns -Square → Rectangular Bays -Move Columns onto grid -Mirror building proportions in bay proportions - Re-Orient Parking Spaces from 90° to 60°

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Vibrations Analysis Beam Layout Beam/Column Design Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Vibrations Analysis -Vibrations due to human walking activity -Minimize accelerations in the floor Deck Properties Concrete Strength4000 psi Steel Grade50 Deck Type1.5VLR20 Topping (in)4.5 Concrete WeightLW Total Slab Thickness (in)6 Force from Excitation Damping Ratio0.05 Acceleration Limit 18’ 24’ -Design Inputs: -Deck: 1.5VLR ” LW Topping -6’ beam spacing

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Vibrations Analysis Beam Layout Beam/Column Design Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Vibrations Analysis - Increasing beam sizes reduced steel utilization - Increase Interaction to Limited by deflections - Increase Deck Gauge and Space beams further - 1.5VLR16 - 9’ foot beam spacing

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Vibrations Analysis Beam Layout Beam/Column Design Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Beam Layout -Long Direction -Short Direction

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Vibrations Analysis Beam Layout Beam/Column Design Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Beam Layout -Long Direction -Short Direction -Deck can not support single mid-span infill beam

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Vibrations Analysis Beam Layout Beam/Column Design Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Beam Layout -Long Direction selected Beam Orientation Steel Weight (tons)# of Members# of studs Long590.92,22025,093 Short627.32,57728,387

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Vibrations Analysis Beam Layout Beam/Column Design Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Beam Layout -Long Direction selected Beam Orientation Steel Weight (tons)# of Members# of studs Long590.92,22025,093 Short627.32,57728,387

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Vibrations Analysis Beam Layout Beam/Column Design Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Column Design -W10 or W12 columns -Column depth constant through building height -Sizes vary along height for efficiency -Spliced every two floors

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Vibrations Analysis Beam Layout Beam/Column Design Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Column Design Exterior Column – H8Interior Column – D6 FloorSizeInteractionFloorSizeInteraction 10-16W10x – W12x – W10x – W12x – W10x – W12x W12x

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Lateral System

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Layout Shear Walls Moment Frames Foundation System Ventilation System Cost and Schedule Analysis Conclusion Lateral Layout -Reduced Building Weight -Seismic forces decrease -Wind Controls -Building height unchanged with less floors -Story forces increase

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Layout Shear Walls Moment Frames Foundation System Ventilation System Cost and Schedule Analysis Conclusion Lateral Layout -Reduced Building Weight -Seismic forces decrease -Wind Controls -Building height unchanged with less floors -Story forces increase

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Layout Shear Walls Moment Frames Foundation System Ventilation System Cost and Schedule Analysis Conclusion Lateral Layout -Reduced Building Weight -Seismic forces decrease -Wind Controls -Building height unchanged with less floors -Story forces increase

Lateral Layout - Remove isolated shear wall -architectural conflicts -ineffective in resisting torsion - Check without SW# Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Layout Shear Walls Moment Frames Foundation System Ventilation System Cost and Schedule Analysis Conclusion Drift due to Wind Case 2 in the X Direction Load CaseMax Drift (in)Allowable Drift (in)Pass / Fail X Direction (+M) PASS X Direction (-M) RE-EVALUATE

Lateral Layout -Remove isolated shear wall -architectural conflicts -ineffective -Add Moment Frames -reduce displacement -reduce torsion 8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Layout Shear Walls Moment Frames Foundation System Ventilation System Cost and Schedule Analysis Conclusion Drift due to Wind Case 2 in the X Direction Load CaseMax Drift (in)Allowable Drift (in)Pass / Fail X Direction (+M) PASS X Direction (-M) PASS

Lateral Layout -Remove isolated shear wall -architectural conflicts -ineffective -Add Moment Frames -reduce displacement -reduce torsion 8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Layout Shear Walls Moment Frames Foundation System Ventilation System Cost and Schedule Analysis Conclusion

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Foundation System

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Foundation System -Reduced Building Weight → Reduce Footing Size - Shared Column Footings → Two individual footings

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Foundation System -Reduced Building Weight → Reduce Footing Size - Shared Column Footings → Two individual footings

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Foundation System Foundation System Comparison Concrete (CY)Formwork (SFCA)Steel (tons) Existing Re-Designed % Decrease37.3%33.1%19.2%

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Ventilation System Design

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Ventilation System - Underground parking → Need to exhaust air - 4 Exhaust fans - Rely on air pressure to move clean air - Air exhausted safely away from pedestrian area.

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Cost Comparison

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Cost Comparison -Based on Cost Information from RS Means Steel System Cost Analysis Redesigned SystemCostNet Difference Steel Framing$9,452,439- $3,400,736 Foundation$1,028,110+ $721,356 Ventilation$52,274- $52,274 Additional Excavation$149,804- $149,804 Parking Spaces$79,380- $79,380 Totals$10,762,007-$2,960,837 - Cost Savings from Foundation Reduction

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Cost Comparison 6% Project Cost Increase 23% Structural Increase Total System Cost SteelConcrete $10,762,007$7,801,170 Per Square Foot Cost SteelConcrete $43.11$31.25

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion -Created a modular bay size with minimal architectural impact -Determine the feasibility of a steel system -Project cost increase - Provide underground parking - Re-design foundation system - Designed a steel gravity system with vibration controlling characteristics Courtesy of Holbert Apple Associates

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Acknowledgments A Very Special Thanks to: Holbert Apple Associates David Holbert & David Smith AE Faculty, especially Thomas Boothby Family, Friends, and Classmates Jesus Christ

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Questions and Comments?

8621 Georgia Avenue Building Introduction Problem Statement & Solution Composite Steel System Lateral System Foundation System Ventilation System Cost and Schedule Analysis Conclusion Questions and Comments?