DOD LEED Implementation November 12th, 2009 John Ambert, LEED AP Cass | Sowatsky | Chapman + Associates.

Slides:



Advertisements
Similar presentations
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
Advertisements

Not Your Father’s Older Brother’s LEED: Energy & Commissioning Opportunities in LEED v4 Mark Gelfo, PE LEED AP BD+C, LEED AP O+M, CxA, EMP Director of.
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
Construction and Demolition Waste Management at UVM
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
International Code Council (ICC) Non-profit member focused association Approximately 50,000 members Develops the I-Codes (15 codes) Established in 1994.
Sustainability and Leadership in Energy and Environmental Design (LEED) Lessons Learned from The Fernald Preserve Visitors Center.
Green Building Leadership in Energy and Environmental Design (LEED)
Introductions: Tom Boyd – Tonn and Blank Construction, LEED Green Associate Tom Boyd – Tonn and Blank Construction, LEED Green Associate Sr. Martha Ann.
Building Enclosure Commissioning (BECx): Practical Project Implementation.
Sustainable Design & Construction at Yale University July 2009.
Introducing Connecticut LEED Program for Green Buildings
Chapter 11: More about USGBC and LEED 1 © 2015 Green Building Academy. All rights reserved.
Energizing Brownfield Projects Terri Smith Environmental Liability Management, Inc.
BECOMING GREEN Santa Margarita High School Academic Building.
Basic Building blocks for Developing a Sustainability Program Florida Healthcare Engineering Association September 22, 2010.
Session One: Introduction to Green Buildings and LEED Introduction to the LEED Rating System.
Kendal at Longwood Cottages Expansion Project Sustainable Development & LEED Certification.
Ripley Rasmus AIA LEED AP
Understanding Fundamental Concepts and Trends of Drafting
PRISHA PROPERTIES INDIA PVT LTD.
Learning by Design Using LEED to enhance teaching and learning.
The Future of Commissioning for Sustained Building Performance Birmingham, AL SERBCA Fall Conference Proposed LEED Requirements for Commissioning.
John Gundling. AGENDA  Eco One Solutions  Offered Services  Environmental Impact  C&D, The Connecticut Example  Achieving Exemplary Performance.
REVIEW Green Professional Building Skills Training Construction Management.
NEW YORK BANKERS ASSOCIATION Pennsylvania Credit Union Association Kevin W. Poirot Vice President May 23, 2008 Building Green: What You Should Know.
The Role of Compact Storage in Green Building Design Program No.: CSGBD Provider Name: Spacesaver Corporation Provider No.: J197.
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Sustainable Construction Technological Design Sustainable Construction © 2011 International Technology and Engineering Educators Association, STEM  Center.
High Performance Building Standard Regulations An Introduction.
LEED Mechanical Economic Analysis, Cost Reduction Strategies and Sustainability Support Services Reducing = Metal + Carbon + Energy + Water + Chemicals.
Phoenix Convention Center Phoenix, Arizona Overview of the ESTCP Energy & Water Program Technology Track Overview of Federal Technology Demonstration Programs.
LEED-NC Market Transformation As of All statistics exclude pilot projects 350 M gsf 50 States 13 Countries 323 Certified Projects 2805 Registered.
ENVELOPE. LIGHTING.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
Big Ten Sustainability Conference November 15-16, 2010 Energy Design & LEED Standards.
The Greening of the Rooftop Module 4 Green Building Rating Systems What Are They? How Do They Work?
So what? Efficiency is a good thing Not without consequences Need to think about comfort, health, productivity How do we achieve it Laws (energy codes)
Design for Energy Star Martha Layne Collins High School Shelby County School District Shelbyville, Kentucky.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Fundamentals of LEED v4 for
Chapter 8 - Integrative Process
Green Materials for building construction  Materials or products that Minimize resource use  Materials or products with Low environmental impact  Materials.
Integrative Process Lori A. Brown, LEED AP BD+C – Power Jam Study!Lorisweb.com1.
LEED Volume Certification Program for Operations & Maintenance and Guiding Principles Compliance CTG Energetics, Inc. Lisa Stanley, CEM, CPM, LEED AP O+M.
Planning for LEED ® © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture Leadership in Energy and Environmental Design LEED ® and its related.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
MVP Sustainability Green LEED LEED TM and its effect on tile subcontractors.
Fighting Fire with Fire: Fort Bragg Goes Platinum with a new LEED Fire Station Kim M. Fowler Senior Research Engineer Sustainable Design and Development.
Jeremy Curry, Jeffrey Williams, Gary McCleod, Matt Gorecki, Drew Lattuca.
Meeting the Sustainable Design Requirements of EO How Sandia National Labs is Meeting the Sustainable Design Requirements of EO Jack Mizner,
Fundamentals of LEED v4 for
Rick Khan, Director Federal Energy Management Program Department of Energy FEMP: Leading and Partnering with Agencies to Design and Build High Performing,
Green Building: What does the Fourth Little Pig Need to Know Before Choosing a Green Home.
LEED Implementation January 2015
LEED Defined Leadership in Energy and Environmental Design
LEED BD+C – Integrative Process
Green Building and Sustainable Architecture
INTD409 Interior Environmental Technology Fall 2016/17
2- INTD409 Interion Environmental Technology
2- INTD409 Interion Environmental Technology Fall 2014/15
LEED 2.2 for New Construction LEED 2.0 for Existing Buildings
Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 1.
Need to Know these terms:
Leadership in Energy and Environmental Design (LEED)
Abigail Fluke, Shawnice Whitfield, Hannah Harrison
Presentation transcript:

DOD LEED Implementation November 12th, 2009 John Ambert, LEED AP Cass | Sowatsky | Chapman + Associates

350 Design build projects Nationwide 58 Design build projects to achieve Certification Dormitories, Barracks, BEQs, Airport Hangers, Educational + Training Facilities, HQ facilities, Mess Halls & Dining Facilities, Child Development Centers, Medical + Dental Clinics, Mail Handling Facilities, Residential Housing, Military Infrastructure Staff : 27 BIM technology + LEED APs

John Ambert, LEED AP+ Bachelors of Architecture, Cal Poly SLO Minor: Sustainable Environments Worked on 26 LEED projects Certified – Platinum Level Navy + Army Projects USGBC + DOD Review Teams

Presentation Overview The Military and Sustainable Design LEED Diction Design Build Process Key Aspects of LEED Program Take Aways

The Military & Sustainable Design DOD Projects + Sustainability Economic Life Cycle Costs Operating Maintenance Social Improving the Quality of Indoor Environment Environmental Low Impact Development

What does the Military Gain from Sustainable Design?  Energy Savings 20-70%  Verified Performance  Lower Life-Cycle Costs  Reduced Compliance Burden Waste + Pollution  Enhanced Productivity

The Military & Sustainable Design LEED Diction LEED ≠ LEEDS Leadership in Energy & Environmental Design LEED AP Building = Certified People = Accredited

The Military & Sustainable Design LEED Diction LEED Building = High Performance Building Performance Based, Not Prescriptive Based on Consensus Standards ASHRAE, IES, ASTM, Inst. Of Transportation Engineers Green Guard, Green Label Plus, Green Seal LEED ≠ Building Code Agenda pushing Market forward

Design Build Process : Bidding + Proposal Goal Setting Charrette : Starting the LEED Machine Research + Analysis LEED Project Goals Analyze Project Impacts Cost Time Feasibility Flexible LEED Proposal Provide Options

Design Build Process : Kick Off Meeting w/ Government : Concept Design User Requests ROICC vs. RFP Key Design Decisions Orientation Daylight Ventilation HVAC Site Strategies vs. Synergies Singular Action with multiple benefits

Design Build Process : Schematic Design LEED “Champion” AP - Architect Facilitates Integrative Design Ongoing Iterative Cycle Charrette / Research + Analysis / Documentation Project Representative Involved from Proposal to Post Occupancy Information Source Reference Guide Coordinated Plan of Action Design + Field Team Quality Control Submittals LEED Letter Templates Supporting Documentation

Design Build Process : Schematic Design Design Eco-charrette Water Analysis Energy Calculator Daylighting HVAC Preliminary Material Selections Strategize

LEED Implementation Plan All activities relating to LEED requirements Design, Construction, Procurement, Submittals, Documentation Outline Integrated Design Process Timeline aligned with construction goals Strategize Design Build Process : Schematic Design

Energy Modeler Key Tool “Eye in the Sky” Coordinate all Trades Breakdown Percentages & Ways to Improve Limits GBCI Reviewer Questions Incentive & Rebates Savings by Design

Design Build Process : Schematic Design Question : What are the biggest costs in the building? Energy Modeler will work with the design team throughout process Multiple iterations Modeling elements now vs later

Design Build Process : Design Development LEED Checklist Project + Team Specific Roles Responsibilities Timeline Cost Impacts Work in Progress Re-Issued at critical points of Design & Construction Build in Buffer ~ 5% = 3-6 pts

Design Build Process : Design Development LEED Checklist Verify & Validate Decisions made in Schematic Design Finalize Material & Product Selections Integrate LEED into Specs & Drawings Commissioning

Design Build Process : Design Development RFP vs. End User Design Team = Middle Man Implement requests from Commander + ROICC Base Specific Standards B.E.A.P. Desired, Possible, Feasible RFP may define, but additional research is necessary to verify

Design Build Process : Design Development Commissioning (Design) Owners Project Requirements (OPR) Basis Of Design (BOD) Commissioning Plan Identify Systems, Team Responsibilities, Testing Procedures, Verification requirements MEP / Solar / Geothermal Specifications

Design Build Process : Design Development : Specifications Credits addressed in 3 approaches 1. General Conditions 2. Under Material & Product Sections 3. Direct notes on Drawings Language General Specs – Division 1 “ General Requirements” Thresholds illustrated Division Specific – Divisions 2-10 Minimum Requirements defined Performance + LEED Requirements Specifics without selecting Material Ex. Roofing : SRI = 29

Design Build Process : Design Development : Specifications Design Build = “ Outline Spec” Must address issues in all sections Create a tight set of specifications Critical Point between Design Development and Construction Documents Moving up or Down on the scale

Cost Estimator Fundamental to engage in process early Life Cycle Costs Understanding of LEED Higher levels of Certification through integrated design Positive + Negative Costs Design Build Process : Construction Documents

Design Build Process : Construction Specifications Analyze materials based on requirements Select Manufacturers Submittal Requirements Submittals LEED Compliance Document aka: LEED Contribution Statement

Design Build Process : Construction LEED AP (Construction Team) On-Site Instructor Foreman / QC / Subcontractors Representative ROICC + Base Manufacturer Construction Team + Company

Design Build Process : Construction LEED AP (Construction Team) Data Recipient Synthesize LEED Data Track & Report LEED Documentation Extract data from subs and enter into LEED Letter Templates Update documentation throughout Construction Process Work with Design Team LEED AP Prepares Construction Package

Design Build Process : Construction LEED AP (Construction Team) Trash Police On-Site sort for Diverting Waste Photographer Time Lapse of Construction Process Key SWWWP Indoor Air Quality items Verifier Materials selected are actually being implemented on site Site Reports from Commissioning Agent Gage Tracking Performance throughout

Design Build Process : Construction LEED Notebook Implementation Plan LEED Checklists LEED Timeline Material Information Cut Sheets LEED Compliance Documents Monthly Reports Waste Tracking

Design Build Process : Construction LEED Notebook Meeting Minutes ROICC / Base Requests & Actions Photographic Journal Completed templates + supporting documentation

Design Build Process : Construction Commissioning (Construction) Extra set of Eyes Commissioning Plan Involves Superintendant, PM + QC Specification back check Evaluates drawings + Installation Generates Commissioning Report Involves Owner + Construction Team to ensure proper actions are taken Operations & Maintenance Manuals included in Submittals

Design Build Process : Construction : Early Phases Site Documentation + Opportunities SWPPP Plan (CA) Erosion Control Identify Base Recycling Programs Off Site haulers + Locations IAQ Management Plan SMACNA Guidelines HVAC Protection + Housekeeping Plan During Construction + Pre Occupancy M&V Plan Ongoing Accountability of Energy Consumption over time Commissioning Plan

Design Build Process : Construction : Early Phases Educate field team Design AP + Construction AP New subs / QCs Commander + ROICC Incentives!! Waste Cleanliness Strategize material selections Top 5 : Block, Steel, Concrete, Gypsum Gather supporting Documentation LEED Worksheets

Design Build Process : Construction : Nearing Completion Update LEED Templates Use to track process IAQ Actions Air Quality Testing vs. Two week Flush Out Setting a Schedule for Deliverables Commissioning Report Innovation & Design Credits

Design Build Process : LEED Submittal Design Review Documentation uploaded to LEED Online vs. Sent to LEED AP Final coordination Meeting with Design Team Identify Prerequisites! AP to receive and distribute comments Provide substantial documentation or credits may be denied

Design Build Process : LEED Submittal Construction Review Design + Construction APs meet for group review Clearly address prerequisites with care Supporting Documentation Cut Sheets + LEED Compliance Documents Narratives Written by Construction LEED AP + field team Important to GBCI Review Teams Innovation In Design = collaboration

LEED & DOD projects Key Aspects Sustainable Sites Parking – BEAP Heat Island Effect – Roof vs. Non-Roof Open Space Stormwater Management

LEED & DOD projects Key Aspects Water Efficiency Landscaping – ATFP Dual Plumbing – Future Use Flush vs. Flow Base Preferences Maintenance

LEED & DOD projects Key Aspects Energy & Atmosphere Energy Model = Coordination between all trades Tweaking HVAC system in the field for Optimal Performance Measurement & Verification Ensures efficiency + functionality

LEED & DOD projects Key Aspects Materials + Resources On-Site sort vs. Co-mingle Recycled + Regional Materials Strategize to ensure achievement FSC Lumber COC Certification Camouflaged problem areas

LEED & DOD projects Key Aspects Indoor Environmental Quality Implement IAQ Plan early and revisit often VOC Limits Cheat sheet for distribution Low Emitting Materials Flat = 50g/L; Non-flat = 100g/L Primer = 100 g/L (GS ) NAUF wood

LEED & DOD projects Key Aspects Innovation In Design Exemplary Performance vs. Innovation Waste Diversion Water Efficiency Teams should look to maximize all Credits LEED Publishes a document of previously accepted ID Credits Adaptability / Future Proofing Be Creative

Take Aways Integrated Design Process Tight collaboration within a Multidisciplinary Team Whole Systems Thinking Start Documentation Early Educate and Encourage Field Team Not a typical construction project

Take Aways Plan a buffer into the Checklist 5% buffer (3-6 points) Push for Certification over Validation Improve Company Image + Portfolio Stand by your Commitment to Sustainability Post Completion Analysis

Contact Info: John Ambert