Meeting in Bishkek February 13, 2006 Meeting in Bishkek February 13, 2006 ENVSEC Initiative in Central Asia REHRA PROJECT STATUS, OUTLOOK AND REMARKS.

Slides:



Advertisements
Similar presentations
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
Advertisements

Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Risk Reduction of Mining Accidents in the Tisa Basin Adriana Eftimie – Director PIU National Agency for Mineral Resources NATO/CCMS Pilot Study “Prevention.
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
1 NATIONAL TECHNICAL UNIVERSITY OF ATHENS (NTUA) School of Chemical Engineering Unit of Environmental Science and Technology (UEST) Katherine Haralambous.
A project implemented by the HTSPE consortium This project is funded by the European Union SUSTAINABLE GROWTH LIFE
THE ROLE OF CIVIL SOCIETY IN WELFARE MIX MODEL CREATION Best Practice Model Social Center "Home of colors"
United Nations Economic and Social Commission for Asia and the Pacific Kitakyushu Initiative for a Clean Environment M. Aslam Khan Chief, Environment Section.
The United Nations Economic Commission for Europe (UNECE) Convention on the Protection and Use of Transboundary Watercourses and International Lakes A.
Project Implementation Plan and Principal Activities
IAEA International Atomic Energy Agency Senior Regulators Meeting Technical Cooperation Programme Supporting Radiation Safety Infrastructure in Member.
By: Ms. Adelaida B. Roman Head, Network Support Component Regional Resource Centre for Asia and the Pacific Thailand.
International legal Agreements - working together in the environment sphere Massimo Cozzone Italian Ministry for the Environment, Land and Sea 4th EU-Central.
Development of lake Druksiai/Drisviaty Basin Management Program Feasibility study.
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
TASK FORCE ON WRDs SURVEILLANCE TASK FORCE ON WRDs SURVEILLANCE Monica Francesca Blasi, Paola Meli, Mario Carere, Enzo Funari National Institute of Health.
Uranium Mining and Remediation Exchange Group, UMREG2012 Vienna 7 – 8 November 2012, DEVCO Nuclear Safety 1 EU - Instrument for Nuclear Safety Cooperation.
Joanna Fiedler Enlargement and Neighbouring Countries Unit DG Environment European Commission REReP → RENA Vision of the European Commission PEIP Regional.
Disaster Preparedness and Prevention Initiative for South Eastern Europe DPPI SEE Seminar on Strengthening Cooperation with Candidate Countries and Western.
North American Commission For Environmental Cooperation Chemicals Management in Mexico Chemicals Management in Mexico M AURICIO LIMÓN AGUIRRE Under Secretary.
EU perspective on occupational health and safety - role and place of unions Károly György Kiev, December December Károly György, MSZOSZ.
June 12-16, 2005 Ottawa, Canada NATO CCMS Pilot Study PREVENTION AND REMEDIATION IN SELECTED INDUSTRIAL SECTORS: Mega-Sites Transboundary Cooperation for.
EEA Grants Norway Grants Annual Programme Report Template Brussels, 20 November
The Berlin Process to support water management in Central Asia Seminar “The UNECE Water Convention” World Water Week Stockholm 19 August, 2009 Dr. Martin.
Dr. Ágnes TÖTTŐS Migration Expert/ Ministry of Interior, Department of European Cooperation/ Hungary Tel:
1 LIFE+ COUNCIL WORKING GROUP 4 OCTOBER Discussion Points 1. LIFE+ in Context: Environment funding under the Financial Perspectives.
“Development of the Co-operation within the Convention on Long Range Transboundary Air Pollution” Karin Kindbom IVL Swedish Environmental Research.
Information and transboundary cooperation – challenges and responses Francesca Bernardini United Nations Economic Commission for Europe.
56th Regular Session of the IAEA General Conference
Technical Meeting on Milestones for nuclear power infrastructure development Radiation Protection Khammar Mrabit Head, Regulatory Infrastructure and Transport.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Towards a harmonised water quality and pollution risk management LLIV-303 project “HOTRISK” Riga, LEGMC,
National and regional activities for environment observations Natalya Shulgina Uzhydromet World Environmental Day Round Table GEO CBC7 Meeting 5 June,
Cross-border projects 2007: Jelgava - Siauliai Jelgava city administration Liene Rulle project manager.
Male’ Declaration Male’ Declaration Work Programme for 2010 by Secretariat UNEP.
ICS-UNIDO - Trieste, ITALY ICS is headquartered at the AREA Science Park, close to the city of Trieste. The AREA is home to many organizations. ICS works.
Male’ Declaration Male’ Declaration Review of Progress in Phase III by Secretariat UNEP.
The Male’ Declaration Proposal for Phase 4 Implementation.
CWC project: next stop Tbilisi Francesca Bernardini United Nations Economic Commission for Europe.
EXISTING EFFORTS TOWARD SEIS IN CENTRAL ASIA Almaty, September 13, 2012.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Ukraine Petro Nakhaba All-Ukrainian Public Organization “ Chysta Khvylya ” Deputy Head Kyiv, Ukraine Contaminated Sites Management Joint UMOE-DEPA Project.
National Protection and Rescue Directoratewww.duzs.hr Presented by: Mr. Damir Trut, Deputy Director25 February 2008, Bled-Slovenia.
Flood Task Force Report to the 4th Meeting of the Parties 20 to 22 November 2006 Bonn.
Cooperation and synergies for better environment – efforts by CAREC EU-Central Asia high-level conference on environment and water 13/14 February 2013.
BUG SURVEYS : An Initiation of Transboundary Co- operation Małgorzata Landsberg-Uczciwek Voivodeship Inspectorate of Environmental Protection in Szczecin.
THE REGIONAL ENVIRONMENTAL CENTER for Central and Eastern Europe THE REGIONAL ENVIRONMENTAL CENTER for Central and Eastern Europe “Development of a National.
TEMPORAL VISUALIZATION OF DATA FROM THE FRENCH SENTINEL NETWORK.
Environment and Security Initiative - ENVSEC - Working Group on Integrated Water Resource Management October 2008.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
6/12/ ORIGINS, BENEFITS AND THE PATH FORWARD BRS Secretariat December 2015 SYNERGIES UNDER THE BASEL, ROTTERDAM AND STOCKHOLM.
Agenda item 4: Draft Offshore Action Plan Gabino Gonzalez, Programme Officer 4th Meeting of the EcAp Coordination Group Athens, Greece, 9-10 October 2014.
ITC-ILO/ACTRAV Course A Trade Union Training on Occupational Safety, Health & HIV/AIDS (26/11 – 07/12/2012, Turin) Introduction to National Occupational.
Annual Review Meeting for Cohesion Policy Funds Specific Thematic Focus 2 - Review the status and state of play of smart specialization strategy.
Current efforts of SEIS introduction to Central Asia
Hidefumi Imura Professor, Nagoya University
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Emerging Policy Issues Nanotechnologies and manufactured nanomaterials
Nick Bonvoisin Secretary to the Convention on the
McDonald’s Kalender 2009.
Water Scarcity Activity Water Scarcity Drafting group
McDonald’s calendar 2007.
McDonald’s calendar 2007.
Péter Kovács Ministry of Interior of Hungary
Hyogo Environmental Advancement Association (HEAA)
2015 January February March April May June July August September
Presentation transcript:

Meeting in Bishkek February 13, 2006 Meeting in Bishkek February 13, 2006 ENVSEC Initiative in Central Asia REHRA PROJECT STATUS, OUTLOOK AND REMARKS

STATUS, REMARKS AND PERSPECTIVES Page 2 February 2006 Better understanding, monitoring and controlling environmental pollution and public health risks posed by industrial activities in the Fergana Valley.Better understanding, monitoring and controlling environmental pollution and public health risks posed by industrial activities in the Fergana Valley. Development of respective national and regional monitoring strategies, plans, networks as well as the institutional strengthening of the regulatory bodies and their supporting scientific background institutions.Development of respective national and regional monitoring strategies, plans, networks as well as the institutional strengthening of the regulatory bodies and their supporting scientific background institutions. PROJECT’s AIM

STATUS, REMARKS AND PERSPECTIVES Page 3 February 2006 ENVSEC Initiative - REHRA Project in Central Asia KyrgyzstanKyrgyzstan UzbekistanUzbekistan TajikistanTajikistan FOUR SITES SELECTED

STATUS, REMARKS AND PERSPECTIVES Page 4 February 2006 Rapid risk assessment and ranking of environment and health mutual trans-boundary risks originated by the selected industrial sites, with prioritisation of risks related to individual sites. Definition of preventive and mitigation measures necessary reduce the identified risks, including recommendations for emergency situations management. PROJECT’s OBJECTIVES/STEPS

STATUS, REMARKS AND PERSPECTIVES Page 5 February 2006 To promote the public participation on the risk management.To promote the public participation on the risk management. To support the institutional strengthening of the national Bodies competent in monitoring and management of industrial risks.To support the institutional strengthening of the national Bodies competent in monitoring and management of industrial risks. To provide scientific support to the competent Institutions.To provide scientific support to the competent Institutions. PROJECT’s OBJECTIVES/STEPS

STATUS, REMARKS AND PERSPECTIVES Page 6 February 2006 THE APPROACH : Transfer and share ofexperiences and organization (not only external expertise)Transfer and share of experiences and organization (not only external expertise) Work performed by trained CIEs, with assistance of ICAROWork performed by trained CIEs, with assistance of ICARO Orientation toward the problem-solving, since the very beginningOrientation toward the problem-solving, since the very beginning

STATUS, REMARKS AND PERSPECTIVES Page 7 February 2006 Pilot project Driving lines Feasibility, project, funds Risks lowering interventions PILOT TO SOLUTION APPROACH

STATUS, REMARKS AND PERSPECTIVES Page 8 February 2006 April 2005: Training seminar in Cortona and designation of CIEsApril 2005: Training seminar in Cortona and designation of CIEs May-June : First mission in Uzbekistan, contracting Osh UnitMay-June : First mission in Uzbekistan, contracting Osh Unit June-July : Starting info/data organization & collectionJune-July : Starting info/data organization & collection August: Training informatic seminar for Osh UnitAugust: Training informatic seminar for Osh Unit September: Transfer of informatic tools, starting in Kyr/TajSeptember: Transfer of informatic tools, starting in Kyr/Taj October – November: Starting of investigations supplementary campaign in Kir and Taj – Starting assessment process in KyrOctober – November: Starting of investigations supplementary campaign in Kir and Taj – Starting assessment process in Kyr December 2005 – January 2006: Restarting and rerouting the Project in UzbekistanDecember 2005 – January 2006: Restarting and rerouting the Project in Uzbekistan January 2006: Completion of investigation supplementary campaing in KyrkyzstanJanuary 2006: Completion of investigation supplementary campaing in Kyrkyzstan MILESTONES

STATUS, REMARKS AND PERSPECTIVES Page 9 February 2006

STATUS, REMARKS AND PERSPECTIVES Page 10 February 2006 STATUS General info/data framework acquiredGeneral info/data framework acquired Drilling and sampling in the pond completed.Drilling and sampling in the pond completed. Chemical analysis of the mud, nearby river waters and wells performedChemical analysis of the mud, nearby river waters and wells performed Air sampling and analysis in programmeAir sampling and analysis in programme KyrgyzstanKyrgyzstan HAIDARKEN – ANTIMONY FACTORY WASTES POND Maps elaboration: Topographic, geologic and hydrogeologicMaps elaboration: Topographic, geologic and hydrogeologic Assessment to be completed within March 2006Assessment to be completed within March 2006 Reporting to be completed within April 2006Reporting to be completed within April 2006

STATUS, REMARKS AND PERSPECTIVES Page 11 February 2006 STATUS General info/data framework acquiredGeneral info/data framework acquired Drilling and sampling in the tailing ponds completed.Drilling and sampling in the tailing ponds completed. Chemical analysis of the muds, nearby water wells in progressChemical analysis of the muds, nearby water wells in progress Air sampling and analysis in programmeAir sampling and analysis in programme KyrgyzstanKyrgyzstan KADAMJAJ – ANTIMONY FACTORY WASTES POND Maps elaboration: Topographic, geologic and hydrogeologicMaps elaboration: Topographic, geologic and hydrogeologic Assessment to be completed within March 2006Assessment to be completed within March 2006 Reporting to be completed within April 2006Reporting to be completed within April 2006

STATUS, REMARKS AND PERSPECTIVES Page 12 February 2006 STATUS General info/data framework acquiredGeneral info/data framework acquired Drilling and sampling in the dump in progress.Drilling and sampling in the dump in progress. Chemical analysis of the dump samples and nearby water wells in programmeChemical analysis of the dump samples and nearby water wells in programme Air sampling and analysis in programmeAir sampling and analysis in programme KANIDABAM PESTICIDES DUMP Maps elaboration: Topographic available, geologic and hydrogeologic in programmeMaps elaboration: Topographic available, geologic and hydrogeologic in programme Assessment to be completed within April 2006Assessment to be completed within April 2006 Reporting to be completed within April-May 2006Reporting to be completed within April-May 2006 TajikistanTajikistan

STATUS, REMARKS AND PERSPECTIVES Page 13 February 2006 STATUS General info/data framework to be restartedGeneral info/data framework to be restarted CIEs organization and cooperation framework to be establishedCIEs organization and cooperation framework to be established No investigations supplementary campaign programmed (Industrial accident risk assessment)No investigations supplementary campaign programmed (Industrial accident risk assessment) Informatic tools to be deliveredInformatic tools to be delivered Maps elaboration: Topographic, geologic and hydrogeologic in programmeMaps elaboration: Topographic, geologic and hydrogeologic in programme FERGANA OIL REFINERY Assessment to be completed within May 2006Assessment to be completed within May 2006 Reporting to be completed within June 2006Reporting to be completed within June 2006 UzbekistanUzbekistan

STATUS, REMARKS AND PERSPECTIVES Page 14 February 2006 OUTLOOK KANIDABAM PESTICIDES DUMP TajikistanTajikistan PROJECT AND FEASIBILITY STUDY FOR RECLAMATION AND PUT-IN-SAFETY OF THE DUMP. Proposal has been already presented to possible donors, since the Bratislava meeting (Under POP Convention or other forms). The Project shall be shared and jointly led with local experts and structures and shall foresee the utilization of the national resources

STATUS, REMARKS AND PERSPECTIVES Page 15 February 2006 OUTLOOK HAIDARKEN WASTES POND Proposal has been already presented to possible donors, since the Bratislava meeting (Under POP Convention or other forms). The Project shall be shared and jointly led with local experts and structures and shall foresee the utilization of the national resources KyrgyzstanKyrgyzstan FEASIBILITY STUDY FOR RECLAMATION AND PUT- IN-SAFETY OF THE POND.

STATUS, REMARKS AND PERSPECTIVES Page 16 February 2006 REMARKS ENVIRONMENTAL MONITORING (?) ENVIRONMENTAL AND TERRITORY BASIC DATA/INFO PUBLIC AWARENESS AND PARTICIPATION PROACTIVE ATTITUDE FOR PROTECTING THE ENVIRONMENT