Rulemaking 14-12-014 PacifiCorp Responses to ALJ Ruling May 26, 2015.

Slides:



Advertisements
Similar presentations
Utility Needs and Smart Grid for Major Storm Events July 11, 2013 Edward Gray, PE Director – Transmission and Distribution Engineering.
Advertisements

Page 1 Outage Management Roy Hoffman 29 Jan 2001.
Outage Reporting Hierarchy Background Data Capture Structure Next Steps.
1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Fuses vs Circuit Breakers for Low Voltage Applications
Power Quality: A Closer Look Joe Watson APPA – Engineering & Operations Technical Conference April 18, 2005.
RURAL ELECTRIFICATION Standardisation and Quality of Supply Presentation to UPDEA February 2009 By Rob Stephen.
EPSON STAMPING ISO REV 1 2/10/2000.
Presented by Environmental Health and Safety
Chapter 19: Network Management Business Data Communications, 4e.
© ABB Group June 10, 2015 | Slide 1 1MRS A self healing power system for the accurate fault location and zone concept T&D Smart Grids Europe 2012.
1 March 1, 2007 Report An Overview October 30, 2006 – Staff Workshop.
Electric Distribution Reliability OIR R Workshop May , 2015.
Controlling Hazardous Energy
Scheduled Versus Event Driven Testing of Distribution Protection IEDs Dr. Alexander Apostolov, Benton Vandiver, Will Knapek, OMICRON electronics.
Metropolitan Planning Council Roundtable Discussion November 17, 2011 ComEd J. Tyler Anthony Senior Vice President, Distribution Operations.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
Module 7: Construction Phase
1 Entergy Transmission Asset Preservation Department 2004 Objectives Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
SWEDE - April 26 th, Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.
Electric Infrastructure Workshop Gulf Power Company January 23, 2006.
SDG&E Electric Reliability Reporting CPUC Workshops May 26-27, 2015.
APPA 2005 E&O Technical Conference Memphis, TN April 19, 2005
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
© ABB PTMV - 1, ABB Overhead Distribution Systems.
Need for protection Power system must be kept in operation continuously without major breakdowns This can be achieved in two ways: 1.Implement a system.
IAEC Reliability Webinar Presented by: Regi Goodale and Ethan Hohenadel December 11,
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
1 Barcelona May 2003 INFORMATICAL SYSTEM INTEGRATING THE RELIABILITY CENTERED MAINTENANCE THE SYSTEM IMPLEMENTATION.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Queensland University of Technology CRICOS No J Protection of distributed generation connected networks with coordination of overcurrent relays.
Utility Engineers, PC.  Generation  Transmission  Distribution.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
1 Case Study: Pacific Gas & Electric Company San Francisco Lifelines Council Edwards Salas Senior Vice President, Engineering and Operations, PG&E February,
Suggestion on How to Use
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
2009 Hurricane Season Preparations Florida Public Utilities Company May 6, 2009.
Modern Maintenance. Management
2014 Hurricane Season Preparedness Briefing Jorge Puentes Technical Projects Manager – Northeast and Northwest Divisions March 26, 2014.
Bywater Reliability Update Gary Huntley Entergy New Orleans, Inc. Regional Manager Entergy New Orleans, Inc. July 28, 2010.
1 Managing Distribution System Reliability at Southern California Edison Robert Tucker Thach “Nicholas” Duong Roger Lee OIR R Workshop May 26.
ECE 498HZ: Power Distribution System Analysis
Distribution systems basic techniques and radial networks.
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
Pepco Best Practices Study. 2 Best Practice Superior performance within an activity, regardless of industry, leadership, management, or operational approaches,
Florida Keys Electric Cooperative Association, Inc. Storm Hardening Florida Public Service Commission May 1, 2008 Scott Newberry, CEO John Stuart, COO.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
Power System Protective Relaying-Part One
Chapter 8. Electrical Systems
Application of Northern Virginia Electric Cooperative PUE
Utility Needs and Smart Grid for Major Storm Events
Overhead Distribution Systems
Predictive-Based Maintenance Strategy
Advanced Fuse-Saving Techniques
An-Najah National University
“Prepare, Prevent, Respond”
ABB SACE Maintenance Preventive Maintenance Program
4.5 Checking and Corrective Action Monitoring and Measurement
ELECTRICAL INSTALLATION AND MAINTENANCE (EIM) 5 INSTALL ELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION, POWER, LIGHTING, AUXILIARY, LIGHTNING PROTECTION.
Transmission Planning in a Modern Market Environment
Pacific Power Seismic Preparedness Update
Control of Hazardous Energy
Fire Alarm Tech Practice Test # 16 NICET
Presented by Environmental Health and Safety
Distribution Circuit Reliability Tool
Presentation transcript:

Rulemaking PacifiCorp Responses to ALJ Ruling May 26, 2015

1) A DESCRIPTION OF THEIR CURRENT CIRCUIT LEVEL RELIABILITY IMPROVEMENT PROGRAMS …Utilities shall each provide the following information…

State District Circuit Customer Circuit District Circuit Company Evaluates Reliability Performance At a Variety of Levels

Reliability Process: Is Based on Time & Location Daily comparison against device, cause code, duration thresholds are performed…FIRE web-based notification tool Periodic review to determine those which are not operating reliably or experiencing deteriorating trends 1)Tabular data reviewed: circuit metrics, including weighted blended score 2)Graphic data reviewed, including geospatial Evaluated by operations, engineering, maintenance and vegetation personnel Implement plans that are developed and monitor their delivery Review results & modify plan as needed Location Time

Reliability Programs: Many tools in the toolbox Fuse It or Lose It (FIOLI)-circuit coordination program Saving SAIDI-circuit hardening program, which could include animal guard installations, hot-spot vegetation treatment Network Initiatives-capital circuit enhancement, generally recloser installation, substation relay replacement Pilot Programs-evaluating new products or processes for implementation, i.e. spacer cable, TripSavers and Fusesavers (tapline reclosing devices) FIRE web-based threshold notification process Faulted circuit indicator installation Circuit infrared inspection Substation relay instantaneous trip settings

2) A DESCRIPTION OF THEIR CURRENT DISTRIBUTION SYSTEM MAINTENANCE PROGRAMS …Utilities shall each provide the following information…

PacifiCorp’s Distribution Maintenance Programs Include both Preventive and Corrective Components Preventive Maintenance inspect facilities, identify abnormal conditions, and perform appropriate preventive actions Transmission and Distribution Lines  Performed in accordance with General Orders 95, 128 and 165.  Patrol inspections are designed to identify damage or defects that may endanger public safety or adversely affect the integrity of the electric system.  Detailed inspections are in depth visual inspections of each structure and the spans between each structure or pad-mounted distribution equipment.  Pole intrusive testing includes a sound and bore to identify decay pockets that would compromise the wood pole’s structural integrity. Substations and Major Equipment  Performed in accordance with General Order 174.  Pacific Power inspects and maintains substations and associated equipment to ascertain all components within the substation are operating as expected. Abnormal conditions that are identified are prioritized for repair (corrective maintenance).  Pacific Power has a condition based maintenance program for substation equipment Protection system and communication system maintenance performed on a time interval basis.

PacifiCorp’s Distribution Maintenance Programs Include both Preventive and Corrective Components Corrective Maintenance Primary focus of the corrective maintenance plan is to correct the abnormal conditions found during the preventive maintenance process Transmission and Distribution Lines  Correctable conditions are identified through the preventive maintenance process.  Outstanding conditions are recorded in a database and remain until corrected.  Priority of conditions establishes corrective timeframes and General Orders (as appropriate). Substations and Major Equipment  Correctable conditions are identified through the preventive maintenance process, often associated with actions performed on major equipment.  Corrections consist of repairing equipment or responding to a failed condition.

PacifiCorp’s Distribution Maintenance Programs Wisdom is Incorporated into Reliability Planning Basic Premise Many safety code non-conformities do not result in reliability issues, however certain of them have a higher likelihood of resulting in poorer reliability  As a result, inspection results are reviewed when performing reliability planning and when investigating repetitive device operations.  Geospatial tool overlays inspection conditions onto circuit topology (GREATER).  Device operation tool (FIRE) associates inspection conditions with zones of protection of the circuit.  May be corrective immediately or queued up for annual planning process.

1)Review condition comments and evaluate their probability of causing any reliability issues… 2)Select conditions of interest 3)Press View Conditions in Powermap Tip…if you want to organize by map string use the Distribution Name column (click on the column heading) Reliability Tools: Device Performance with Inspection Results within Zone of Protection

Reliability Tools: Geospatial Overlay of Inspection Conditions with Reliability Performance

3) A DESCRIPTION OF THE DATA AND METHODOLOGY THEY USE TO IDENTIFY POOR PERFORMING CIRCUITS AND ANY SOLUTIONS USED TO RESTORE PERFORMANCE TO ACCEPTABLE LEVELS …Utilities shall each provide the following information…

Reliability Programs: Many measures to discern opportunities to improve reliability Industry benchmarks Company and district level comparisons Time based comparisons Circuit level performance Blended circuit metrics (i.e. circuit performance index) CPI = Index * ((SAIDI * WF * NF) + (SAIFI * WF * NF) + (MAIFI E * WF * NF) + (Lockouts * WF * NF)) Index: SAIDI: Weighting Factor 0.30, Normalizing Factor SAIFI: Weighting Factor 0.30, Normalizing Factor MAIFI E : Weighting Factor 0.20, Normalizing Factor 0.70 Lockouts: Weighting Factor 0.20, Normalizing Factor 2.00 Therefore, * ((3-year SAIDI * 0.30 * 0.029) + (3-year SAIFI * 0.30 * 2.439) + (3- year MAIFI E * 0.20 * 0.70) + (3-year breaker lockouts * 0.20 * 2.00)) = CPI Score Customer metrics (i.e CEMI, RPI)

Reliability Process: Examples of Data Reviewed State View of Data Circuit View of Data

Reliability Process: Output from Review Process Crescent City carry over from 2014: - no outstanding work. FIRE tasks etc.: - 5r171/170 high impacting, lots of loss of supply - 5r165 t/r from trees - 5r152 planned and vehicle accident, equipment failure, no actionable 2015 Plans: - 5r165: - look into relocating recloser to south branch at FP and add trip saver to east. - recloser will require more poles and reconfiguration. - other option is to install fault indicators at the pole where it splits. - need a fault indicator on south side of 100T fuse to indicate where to isolate, at FP r167: - install ~6,300 ft spacer cable between FP and FP Crescent City carry over from 2014: - no outstanding work. FIRE tasks etc.: - 5r171/170 high impacting, lots of loss of supply - 5r165 t/r from trees - 5r152 planned and vehicle accident, equipment failure, no actionable 2015 Plans: - 5r165: - look into relocating recloser to south branch at FP and add trip saver to east. - recloser will require more poles and reconfiguration. - other option is to install fault indicators at the pole where it splits. - need a fault indicator on south side of 100T fuse to indicate where to isolate, at FP r167: - install ~6,300 ft spacer cable between FP and FP Scoping Notes Worst Performing Circuits Project List

Reliability Process: Project Effectiveness

4) AN EXAMPLE USING SIMPLIFIED DATA OF HOW THE METHODOLOGY FROM QUESTION 3 ABOVE WOULD BE APPLIED …Utilities shall each provide the following information…

Example Improvement Identification  Circuit 5G83, in Weed, California, serving about 2,000 customers; deteriorating trend in CPI score

5) A DESCRIPTION OF AN HISTORICAL EXAMPLE OF A CIRCUIT THAT WAS SELECTED FOR REMEDIATION AND THE PLAN THAT WAS USED TO IMPLEMENT THE REMEDIATION …Utilities shall each provide the following information…

Example Improvement Plan  Circuit 5G83, Improvements as Below

6) A DESCRIPTION OF HOW BEST TO DEMONSTRATE COST-EFFECTIVE REMEDIATION OF POORLY PERFORMING CIRCUITS …Utilities shall each provide the following information…

Cost-Effective Improvement Example  Evaluate Cost to Improve Customers Interrupted and Customer Minutes Interrupted (ties to SAIFI and SAIDI)