Demonstration Test Program for Long–term Dry Storage of PWR Spent Fuel

Slides:



Advertisements
Similar presentations
Operating Experience in Spent Fuel Storage Casks T.Aida, T.Hara, Y.Kumano Tokyo Electric Power Company IAEA-CN-178/KN27 3 June 2010.
Advertisements

1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
International Conference on Management of Spent Fuel from Nuclear Power Reactors, Vienna, 31 May - 4 June 2010 Anibal Barrera Life Extension Project Embalse.
INRNE-BAS MELCOR Pre -Test Calculation of Boil-off test at Quench facility 11th International QUENCH Workshop Forschungszentrum Karlsruhe (FZK), October.
Idaho Cleanup Project _____________________ ICP Spent Nuclear Fuel Examination Barbara Beller for Kathleen Hain, PBS-12 FPD April 15, NSNFP Strategy Meeting.
Lesson 17 HEAT GENERATION
Independent Spent Fuel Storage Installation (ISFSI) Dry Cask Storage NUCP
Manufacturing Technology
Preliminary Results of the AGC-3 Irradiation in the Advanced Test Reactor and Design of AGC-4 Proceedings of the th International Nuclear.
MTR Project BLACKSTONE Tjark van Staveren, NRG Steven Knol, NRG Matthew Brooking, EDF Energy September 18, 2013.
1 August 30-31,2010 Kyushu Electric Power Co.,Inc. Nuclear Power Operatio n Dept. Masahiro Yoshinaga Approach for dose reduction in Sendai NPS August 30-31,2010.
1 Demonstration Drop Test and Design Enhancement of the CANDU Spent Fuel Storage Basket in MACSTOR/KN-400 Woo-Seok Choi *, Jae-Yeon Jeon, Ki-Seog Seo(KAERI)
Outlook for the Requirements of the Nuclear Power Plant Irradiation Test in China SONG DANRONG Nuclear Power Institute of China.
International Conference for Spent Fuel Management from Nuclear Power Reactor Session 7 “Technological Innovations for Spent Fuel Storage” Meet the.
Nuclear Fuels Storage & Transportation Planning Project Office of Fuel Cycle Technologies Nuclear Energy A History of Standardized, Multipurpose Canister.
Radiation Effects in a Couple Solid Spallation Target Materials S.A. Maloy, W. F. Sommer, M.R. James, T.J. Romero, M.L. Lopez Los Alamos National Laboratory,
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
The JPARC Neutrino Target
International Conference on Management of Spent Fuel from Nuclear Power Reactors, May 31 – June 4, 2010 Incorporated administrative agency Japan Nuclear.
Fuel Behavior in Long-term Management of Spent Light-Water Reactor Fuel International Conference on Management of Spent Fuel from Nuclear Power Reactors.
Used Fuel Projections and Considerations John Kessler Manager, Used Fuel and HLW Management Program, Nuclear Infrastructure Council Sustainable.
Posiva Oy Olkiluoto Eurajoki Puh. (02) 8372 (31) faksi (02) DOPAS Demonstration of Plugs and Seals Posiva Plug Experiment POPLU at URCF.
Ottó Bede TBM Consortium Meeting, Brasimone WP5 - FEM analyses ITER PPE training session 7 December – 11 December 2009, Cadarache, France.
RIC 2009 Thermal Hydraulics & Severe Accident Code Development & Application Ghani Zigh USNRC 3/12/2009.
SAFETY AND LICENSING OF SPENT FUEL STORAGE AND TRANSPORT-Safety issues within spent fuel transport by AREVA Stéphane BRUT François DERLOT Laurent MILET.
Iván Fernández CIEMAT 2 nd EU-US DCLL Workshop, University of California, Los Angeles, Nov th, 2014.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
State and Development of the RIAR Techniques for In-Pile Investigation of Mechanical Properties of Materials and Products for Nuclear Engineering A.Ya.
Thermal Analysis of Spent LWR Fuel Casks Under Normal and Accident Conditions Miles Greiner University of Nevada, Reno Systems Analysis Technical Guidance.
Distributions of fission products on PCI in spent PWR fuels using EPMA
MANAGEMENT OF DAMAGED SNF HANDLING OPERATIONS AT PAKS NPP Е.А. Zvir, V.P. Smirnov Research and Development Company “Sosny”, Moscow, Russian Federation.
Andrea Salvini, CERN, L.E.N.A. Laboratory at Pavia University (Laboratorio Energia Nucleare Applicata) TRIGA Mark II pool research reactor.
0 Zinc Injection from Hot Functional Test in Tomari Unit 3 Nov MITSUBISHI HEAVY INDUSTRIES, LTD. HOKKAIDO ELECTRIC POWER CO., INC.
Nuclear Fuels Storage & Transportation Planning Project Office of Fuel Cycle Technologies Nuclear Energy Criticality Safety Assessment for As-loaded Spent.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Nuclear Thermal Hydraulic System Experiment
Feasibility Study of Supercritical Light Water Cooled Fast Reactors for Actinide Burning and Electric Power Production NERI program funded by the U.S.
Table of Contents  General Description  Concept of RX Vessel and Location of Defect  Radiation Dose Control  Repair Schedule of Bottom Header Defected.
Safety and Licensing of Spent Fuel Storage Facilities Vonna Ordaz, U.S. NRC Presented at International Conference on Management of Spent Fuel from Nuclear.
ISOE/ATC ALARA Symposium 2006 The Japan Atomic Power Company 1 Progress of the Zinc Injection in Tsuruga NPP Unit 2 October 12, 2006 THE JAPAN ATOMIC POWER.
JAERI nuclear analyses for IFMIF T. Umetsu, M. Yamauchi and M. Sugimoto Presented by Takeo NISHITANI Japan Atomic Energy Agency (JAEA) IAEA Technical Meeting.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
USE OF THE AXIAL BURNUP PROFILE AT THE NUCLEAR SAFETY ANALYSIS OF THE VVER-1000 SPENT FUEL STORAGE FACILITY IN UKRAINE Olena Dudka, Yevgen Bilodid, Iurii.
Experimental and numerical studies on the bonfire test of high- pressure hydrogen storage vessels Prof. Jinyang Zheng Institute of Process Equipment, Zhejiang.
Developing a Data Base Supporting Very long- term Storage of Spent Nuclear Fuel R E Einziger, Ph.D., E. Benner, and C. Regan Spent Fuel Storage & Transportation.
4/2003 Rev 2 I.4.9h – slide 1 of 24 Session I.4.9h Part I Review of Fundamentals Module 4Sources of Radiation Session 9hFuel Cycle – Spent Fuel IAEA Post.
MethodAdvantageDisadvantage Landfills: Waste is buried in the ground  rotting material produces methane gas which cold be collected  filled ground.
4/2003 Rev 2 I.4.9h – slide 1 of 24 Session I.4.9h Part I Review of Fundamentals Module 4Sources of Radiation Session 9hFuel Cycle – Spent Fuel IAEA Post.
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Results of First Stage of VVER Rod Simulator Quench Tests 11th International QUENCH Workshop Forschungszentrum Karlsruhe October 25-27, 2005 Presented.
Nuclear Power Plant How A Nuclear Reactor Works.
1 Cryogenic Design and the 4 He Evaporative Purifier David G. Haase, et al., North Carolina State University.
Nuclear Power Plant How A Nuclear Reactor Works. Pressurized Water Reactor - Nuclear Power Plant.
How can heat be transferred?. Objectives Describe conduction as a method of heat transfer. Outcomes C: Define conduction. B: Explain conduction in terms.
LOW PRESSURE REACTORS. Muhammad Umair Bukhari
5K shield removal experiment in STF cryomodule Norihito Ohuchi 2008/11/181ILC08-GDE-Meeting (CHICAGO)
ISOE Asian Technical Center 2005ALARA Mini-Workshop Fugen Nuclear Power Station, JAEA- 1 Demonstration of Zinc Injection Technique in Fugen Nuclear Power.
Slide 1 3rd EC/IAEA/ISOE Workshop on ”Occupational Exposure Management in Nuclear Power Plants” Fuel decontamination at Ringhals 1 with the new decontamination.
1 Demonstration Test Program for Long–term Dry Storage of PWR Spent Fuel 2 June 2010 M. Yamamoto, The Japan Atomic Power Company The Kansai Electric Power.
REACTOR PRESSURE VESSEL
New nTOF target: Design Issues
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Nuclear Power Plant.
LOW-POWER RESEARCH REACTOR FOR EDUCATION AND TRAINING
Heat Exchangers Heat Exchangers.
BASIC PROFESSIONAL TRAINING COURSE Module XVIII Decommissioning Case Studies Version 1.0, May 2015 This material was prepared by the IAEA and.
TRANSPORTATION CASK AND CONCRETE MODULE DESIGN FOR MANAGING NUCLEAR SPENT FUEL PRODUCED IN BUSHEHR NUCLEAR POWER PLANT A.M. TAHERIAN Iran Radioactive Waste.
Presentation transcript:

Demonstration Test Program for Long–term Dry Storage of PWR Spent Fuel IAEA-CN-178/08-03 Demonstration Test Program for Long–term Dry Storage of PWR Spent Fuel 2 June 2010 M. Yamamoto, The Japan Atomic Power Company The Kansai Electric Power Co., Inc. Kyusyu Electric Power Co., Inc. Mitsubishi Heavy Industries, Ltd.

Contents 1. Introduction 2. Demonstration Test Program Test Overview and Process Fuel Assemblies for Test Outline of Test Container Verification Method of Fuel Integrity Confirmation during Storage Tests 3. Designing of Test Container Current Knowledge and Experience Simulated Environment of Actual Casks 4. Summary

1. Introduction Mutsu interim spent fuel storage facility in Japan is preparing for the maximum 50-year storage of spent fuel in dry metal casks for both transportation and storage. To reduce risk of radiation exposure to workers and waste materials, the facility has no hot cells, and the spent fuel will be confirmed for their integrity indirectly by monitoring casks during storage and transported after the storage without opening the cask lid. Lots of fuel cladding integrity investigations in Japan Lots of demonstrations & experiences in overseas Dry storage experiences of BWR fuel in Japan Long-term storage test for “fuel integrity” in domestic research facility to accumulate knowledge and experience on long-term integrity of PWR spent fuel during dry storage. To make assurance doubly sure on safety of transportation after storage.

2. Demonstration Test Program (1/5) Test Overview and Process Time Schedule of Demonstration Test of PWR Fuel Storage Fiscal year 2009 2010 2011 2012 2013 –2022 2023 –2032 2033 –2042 2043 –2052 - - - Planning & Designing Manufacture & Preparation Storage test & Inspection Planning Designing Safety analysis Licensing Manufacturing of test container Thermal test Preparation & Fuel inspection Loading to container (48GWd/t fuel) (55GWd/t fuel) 48GWd/t type fuel test 55 GWd/t type fuel test Gas sampling

2. Demonstration Test Program (2/5) Fuel Assemblies for Test Up to two spent fuel assemblies (Type 48GWd/t and 55GWd/t ) will be stored. 48GWd/t : Some of the fuel rods were used for PIE tests, and now it is stored in the pool of the hot laboratory in Tokaimura (NDC). 55GWd/t : a proper spent fuel will be prepared in the future. Fuel assemblies Assumed for Tests Type 17×17 48GWd/t Fuel Assembly Type 17×17 55GWd/t Fuel Assembly Burn-up (MWd/t) 42,800 (past record) ≤55,000 (assumption) Cooling period 19 years (as of October, 2012) >10 years (as of October, 2022) Cladding material Zircalloy–4 MDA or ZIRLO Remarks 15 empty fuel rods* Non *Fuel rods used in PIE are never used for long-term storage tests.

2. Demonstration Test Program (3/5) Outline of Test Container item Description Compo-nents - Lid (Steel, Resin, Double metal gasket) - Body (Steel, insulator, Resin) - Basket (Steel, Boron-Al) - Outer thermal insulator Size - Height : Approx. 5.2m - Outer diameter Approx. 2.2m Contents Max. 2 PWR spent fuel assemblies Cover gas Helium (negative pressure) Lid Outer thermal insulator* Inner thermal insulator Mid-body Cross section Inner container PWR spent fuel assemblies Basket spacer (Boron-Al) Neutron shield Basket (Stainless steel) Trunnion *Note: Outer thermal insulator installed at loading only 48GWd/t F/A is removed when 55GWd/t fuel assembly is added.

Inspection of fuel after storage test Investigation of cause 2. Demonstration Test Program (4/5) Verification Method of Fuel Integrity Loading to test container* * The following inspections of sampled cover gas are to be carried out at the start of storage test after fuel loading; – Kr-85 radioactivity analysis – Gas composition analysis [ 48GWd/t fuel assembly] Inspection of fuel before storage test Start of Storage Test under Dry Condition – Visual inspection of fuel assembly 10 years Analysis and monitoring during storage test Loading to test container* [ 55GWd/t fuel assembly] Inspection of fuel before storage test – Kr-85 radioactivity analysis – Gas composition analysis – Monitoring of surface temperature of test container – Monitoring of containment boundary pressure of test container – Visual inspection of fuel assembly Increase of Kr-85 level End of Test Inspection of fuel after storage test Suspension of Test Investigation of cause Flow Diagram of Test Program – Visual inspection of fuel assembly

2. Demonstration Test Program (5/5) Confirmation during Storage Tests Sampling of cover gas in test container - Confirm detection of fuel leakage - Induction of cover gas into sampling pod - Scheduling every 5 years - Radioactive gas (Kr-85) analysis with a Ge detector - Gas components analysis with a mass spectrometer Temperature monitoring - Estimate temperature history of fuel rods - Installation of thermocouples on the outer surface in the middle area. - Calculation of the fuel rods temperature with a previously-verified assessment tool by thermal performance tests. Pressure monitoring - Confirm maintenance of containment of the test container - Monitoring of helium gas pressure at the lid boundary. - Installation of pressure gauges to a buffer tank leading to gap of double metal gaskets.

Evaluation of Degradation Events 3. Designing of Test Container (1/4) Current Knowledge and Experience Evaluation of Degradation Events Conditions to be considered Technical Evidence Actual Conditions of Stored Cask Test Conditions (target) Thermal degradation No embitterment due to hydride reorientation, failure due to creep strain, recovery of irradiation hardening, or stress corrosion crack under 100MPa or less circumferential stress at 275°C Around 230°C (Gradually decrease with decrease in decay heat) (Gradually decrease with decrease in decay heat) Chemical degradation Negligible oxidation/hydrogen absorption during storage (inert gas atmosphere) compared to that during in-core irradiation He gas atmosphere Moisture: 10% or less Radiation degradation Negligible neutron irradiation influence during storage Saturation of mechanical strength due to neutron irradiation at relatively low burn-up (around 5GWd/t) Burn-up of stored fuel: Maximum 47GWd/t Burn-up of contained fuel: 5GWd/t or more Mechanical degradation Maintenance of integrity under normal test conditions of transport (free drop) (Acceleration :20 to 45G) During storage: static position During earthquakes: Acceleration of 1G

Radiation degradation Mechanical degradation 3. Designing of Test Container (2/4) Simulated Environment of Actual Casks Chemical degradation The test container is filled with helium gas having negative pressure as with actual dry cask cavity. Vacuum drying operation is carried out before backfilling of helium gas. Amount of moisture is confirmed. Mechanical strength of cladding tubes shows saturation and ductility shows slow deterioration at low burn-up (around 5GWd/t). Test fuel Burn-up is 42.8GWd/t. (Irradiation dose is 1021 to 1022n/cm2) The test container is statically positioned in a vertical direction. Radiation degradation Mechanical degradation

Schematic drawing of Max. Temperature transition 3. Designing of Test Container (3/4) Simulated Environment of Actual Casks --- Temperature Thermal degradation The maximum temperature of fuel cladding tubes during the storage test is set as around 230°C regarding to design value of actual casks. Gradual decrease of fuel temperature is simulated considering to the condition of actual casks. 0 10 Test Time (year) Maximum temperature (°C) 230 210 55GWd/t fuel assembly 48GWd/t fuel assembly 3 2 1 Schematic drawing of Max. Temperature transition

3. Designing of Test Container (4/4) Simulated Environment of Actual Casks --- Temperature Heat load and max. temperature of cladding at initial test conditions Beginning of test Addition of 55GWd/t fuel assembly Loaded fuel assemblies 48GWd/t (cooling for 19 years) 48GWd/t (cooling for 29 years) & 55GWd/t (cooling for 10 years) . Heat Load 547 W 1472 W (455+1017 W) Initial max. temperature of fuel cladding Approx. 250°C (at 48GWd/t fuel assembly) Approx. 230°C (at 55GWd/t fuel assembly) Thermal analyses were conducted for estimation of max. temperature of fuel claddings covered with He gas. The obtained temperatures will meet the aimed temperature around 230°C or more. Thermal Analyses of Test Container (during loading of 48&55GWd/t fuel assemblies)

4. Summary Some Japanese utilities are planning to conduct a long-term storage test for up to 60 years by placing PWR fuel assemblies in a test container simulating temperature and internal gas of actual casks to accumulate knowledge and experience on long-term integrity of PWR spent fuel assemblies during dry storage. The storage test plans such as test methods and inspection items, and container design have been prepared. In the future, safety analyses, licensing and manufacturing of the test container are to be done, and the storage test of 48GWd/t fuel assembly will start in fiscal 2012. Thermal design of the test container is important. Its temperature is controlled with thermal insulators and heat-transfer performance is confirmed by heat transfer tests at the completion of the container. Others ----- Japan Nuclear Energy Safety Organization (JNES) plans to participate in this test from a regulator’s standpoint. We will discuss its details in the future.

Supplemental OHP Confirmation of containment Inert gas inlet / outlet Lid part Web data logger Wireless Server Non–controlled area Controlled area V3 V2 V1 V4 V5 V10 V6 V7 V8 V9 PC Buffer tank P1 P2 T1 T2 Schematic Drawing of Pressure Monitoring