ANL-FNAL Collaboration Meeting: Superconducting RF ANL: Mike Kelly, Scott Gerbick, Bill Boettinger (NE) FNAL Collaborators: Kerry Ewald, Cristian Boffo,

Slides:



Advertisements
Similar presentations
T. Saeki (KEK) 15 May 2014 AWLC2014 at FNAL
Advertisements

SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Superconducting RF Cavity/Cryomodule Development at Fermilab (Industrialization) C.M. Ginsburg (FNAL) Proton Accelerators for Science and Innovation 2.
1 Collaboration%20Meetings/SMTF%20Collaboration%20Meeting.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
Cavity-Coupler Treatment & Testing Preparation of crab cavities for KEKB RF aging of input couplers. 17 th September 2009, LHC-CC09 at CERN K.Nakanishi.
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
US Cavities Status and Plan Mark Champion 01 October 2009.
Shekhar Mishra, Fermilab Mark J. Oreglia, Univ. of Chicago
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
Perspective on ILC SC Technology Collaboration Fermilab-China Bob Kephart ILC Program Director Fermilab.
ATLAS Intensity and Efficiency Upgrade ATLAS USERS MEETING Speaker: Mike Kelly Physics Division May 15, 2014.
Elliptical SRF Cavities Mike Foley. Fermilab Feb 13-14, 2007DOE SCRF Review2 Elliptical SRF Cavities PREVIEW OF PRESENTATION –Brief review of established.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
Needs of a European SCRF Facility - the BIG plan Lutz Lilje DESY -MPY- DESY 11/2006 Planning Resource needs.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Update on SRF Activities at Argonne Mike Kelly, Peter Ostroumov, Mark Kedzie, Scott Gerbick (PHY) Tom Reid, Ryan Murphy (HEP) Thomas Proslier, Jeff Klug,
ILC R&D at Fermilab Robert Kephart. ILC Americas f Fermilab May 15-18, 2006FY06 DOE Annual Review2 Outline Fermilab ILC Goals Fermilab’s role in the GDE.
Status of cavity fabrication facility at KEK H. Hayano, KEK Cavity Industrialization Study at KEK Superconducting RF Cavity Technology and Industrialization.
Plans for Future SRF Infrastructure Shekhar Mishra ILC Program Fermilab.
ILC Cavity and Cryomodule Overview Shekhar Mishra Fermilab.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
SRF Plans at ANL & FNAL Bob Kephart ILC Program Director, Fermilab ANL-FNAL-U of C Collaboration Meeting Oct 12, 2009.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal Shekhar Mishra (Hasan Padamsee, John Mammosser, Mike Kelly) For the WBS 9 Collaboration.
TILC09 / SCRF Session Update on S0 Work in the Americas Region Mark Champion, Fermilab With slides provided by: Zack Conway, Cornell Rongli Geng, Jefferson.
Advanced Energy Systems, Inc. Prototype Cavity Fabrication & Test Presented by Ilan Ben-Zvi, BNL for Michael Cole, AES.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Status of U.S. Cavity & Cryomodule Industrialization Bob Kephart LCWS10/GDE Beijing, March, 2010.
TTC Meeting, Frascati, 5-7 December Summary of EP discussions at Oct SMTF meeting at FNAL T. Tajima (LANL), C. Boffo (FNAL)
R&D Expected in Cooperation with Vendors ILC Baseline Assessment Workshop Mark Champion September 09, 2010.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
ILC Americas Cavity and Cryomodule R&D Shekhar Mishra ILC Program Fermilab Talk presented at DOE Annual Program Review Breakout Sessions – Wednesday, May.
CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
Lutz Lilje DESY -MPY- Summary of the Superconducting RF WG DESY -MPY Overview on talks given List European Assets.
DISCUSSION BCP in subassemblies or in fully assembled cavity? Silvia Verdú-Andrés | Brookhaven National Laboratory | 11 December 2015 Thanks to Mike Kelly.
Centrifugal Barrel Polishing at Fermilab (Tuesday, December 6th at 10:20) Tesla Technology Collaboration IHEP, Beijing December 5 th -8 th, 2011.
Cavity Processing for 
F ILC/SRF Strategic Planning OHAP Rich Stanek September 17, 2009.
Overview on DESY Infrastructure and up date/ grade Activities schedule status and plans Axel Matheisen DESY.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Plans for Gradient R&D and Cavity Processing and Testing in the Americas Region in FY08-09 Mark Champion 21 April 2008.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
7th SRF Materials Workshop FRIB SRF Cavities 7/16/12 Chris Compton.
General Accelerator Development B&R KA A LABORATORY-UNIVERSITY COLLABORATION TO UNDERSTAND PERFORMANCE LIMITS OF SRF CAVITIES (DE-PS02-09ER09-05)
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
N. Dhanaraj 1 Single Cell Program - Status Single Cell Program - Status March 1, 2007 Thursday.
SRF Infrastructure at Fermilab (and more) Rich Stanek Engineer’s Week February 15, 2010.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
SRF Infrastructure Changes Required for a CW linac Robert Kephart FNAL AAC Meeting November 16, 2009.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
SRF Advances for ATLAS and Other 
July 5th,2006John Mammosser, Jlab ILC – Electropolish Development (EP) Plans/Progress/Problems/Performance Jefferson Lab J. Mammosser, L. Phillips, C.
ILC R&D Board Meeting: SRF Cavities Status and Plans
ANL Proposal to Perform Electropolishing for the ILC
ILC Cavity & Cryomodule Overview
Cavity and Cryomodule R&D
Presentation transcript:

ANL-FNAL Collaboration Meeting: Superconducting RF ANL: Mike Kelly, Scott Gerbick, Bill Boettinger (NE) FNAL Collaborators: Kerry Ewald, Cristian Boffo, Dan Olis, Allan Rowe Speaker: Mike Kelly May 18, 2007

2 ANL SRF Group M. Kelly, J. Fuerst, S.Gerbick Z. Conway (Grad. Student) K. Shepard (1 day/week) Coordination Nb procurement, QA Mechanical & EM design Chemistry Clean processing & assembly Testing AES Sciaky Niobium tooling and forming Electron beam welding ANL Shops Meyer Tool Brazing Stainless machining ILC AEBL ERL 203 Cold Test Facility 203 Surface Prep Lab SCSPF HINS SRF Accelerator Projects ANL SRF Facilities Manpower Projects in Superconducting RF (ANL perspective) Collaborators K. Ewald, A. Rowe, D. Olis ATLAS

3 SRF at ANL Effort for ILC FY07 ANL interest is to develop the complete capability for building, processing, testing, operating elliptical cavities

4 Major Areas of ANL/FNAL SRF Collaboration Cavity Processing Infrastructure ( ) Chemistry/Clean rooms Scrubber Ultra-pure water system High-pressure water pump Electropolishing System, 12 design meetings since Oct. 06 Cathode/Cathode Loading – FNAL lead Cavity mechanical assembly – ANL lead High-pressure water rinsing/single cavity clean assembly “G150” Surface Prep Laboratory at ANL 3.9 GHz Cavity Buffered Chemical Polishing

5 ILC-Americas Planning: ANL/FNAL to Lead Cavity Processing

6 Technical Approach: A Horizontal Electropolishing System

7 Technical Approach: Cathode Loading, Acid Draining, Water Rinsing

8 Electropolishing Design Review at ANL, Feb Reviewers: Hasan Padamsee (Cornell), Kenji Saito (KEK), Tsuyoshi Tajima (LANL), Lutz Lilje (DESY), Axel Matheisen (by phone DESY), Marc Ross (FNAL), John Mammosser (JLAB) Presenters: Mike Kelly (ANL), Cristian Boffo (FNAL) Does the design meet the ILC specifications? Will the system be ready for commissioning in July 2007? Assess the suitability of the design for performing one EP procedure per week in FY Charge to the Committee The committee report was very positive; manpower critical path

9 SCSPF: Superconducting Cavity Surface Processing Facility Location: Argonne Building 208 Facility Cost with manpower $2M Safety Review Completed in 2006; 700 man-hours and $100K EP Operations started in m

10 SCSPF: ANL Portion

11 Commissioning the SCSPF: Electropolishing Last of 6 QWR for ATLAS Upgrade, May 07 Entry into ANL chemistry room after EP

12 Assembling/Testing Hardware for ILC Cavity Processing Electropolishing system mechanical frame Cavity handling system for chemistry & clean rooms

13 Status of ANL-FNAL collaboration in SRF ANL-FNAL have had an effective collaboration on electropolishing EP Design Specification 100% complete EP Engineering Design 100% complete EP Design Review 90% complete EP System/component procurement 90% complete EP system assembly 40% complete We are on track to perform electropolishing for ILC by July 2007 ANL-FNAL collaborating on high-pressure rinsing for the joint facility; began in April on design/construction (initially de-scoped due to CR in FY07) Continued effective ANL-FNAL SRF effort require a (more) focused and sustained effort of a (larger) group of technical together with management.

14 Additional Material: A Cavity Holding Fixture Spider Assembly 2.5 cm stainless (titanium) tube clamps here using aluminum “seat” clamp Pin with expanding diameter “quick” pin

15 Additional Material: HPR in G150 facility Supplied with 18 M  -cm deionized water at 20 l/m, up to 3000 PSI Rinsed and dried in a curtained clean area

16 Additional Material: Test of End Group Fri. Feb 9, 2007 Filled with water, rotated shaft on lip seal at 20 rpm, pressurized to 2 PSI First test looks good; long term operation to be tested

17 Additional Material Fluoride specific electrode; untested; requires dilution by ~50X