Brian Ross, Principal, CR Planning, Inc. Local Best Practices for Solar: Planning, Zoning, Permitting 1 Solar Minnesota November 26, 2012.

Slides:



Advertisements
Similar presentations
Options appraisal, the business case & procurement
Advertisements

Open for Business December Being Open for Business is a Priority for the City of Hamilton Mayors Open for Opportunity Task Force
PERMIT INTAKE Applicant is greeted by permit staff Permit staff determines nature of permit, assists in gathering forms, and begins calling necessary staff.
S T A T E O F C A L I F O R N I A The Department of General Services Grid Neutral Schools Division of the State Architect, Department of General Services,
Advancing Alternative Energy Technologies Glenn MacDonell Director, Energy Industry Canada Workshop on Alternatives to Conventional Generation Technologies.
Solar Energy Florida Electric Cooperatives Association 2014 Finance & Accounting Conference Glenn Spurlock September 17, 2014.
DRAFT SUSTAINABLE COMMUNITIES CLIMATE ADAPTATION GUIDEBOOK Kate Marshall, SRA International, Inc. (703) ,
Regulatory Environment and Small-hydro Development Professor Priyantha D C Wijayatunga Public Utilities Commission of Sri Lanka and University of Moratuwa.
P EREGRINE E NERGY G ROUP Installing Renewable DG in High Performance Schools in Connecticut Steven Weisman Peregrine Energy Group, Inc. April 10, 2006.
The Nuts and Volts of Community Solar... USGBC Green Scene RJM Construction 701 North Washington Avenue February 26, 2015 Brian Ross, AICP, LEED GA.
November 22, 2011 Historical Commission Mission : To promote, preserve and protect Alachua County’s historic resources.
KEC Policy Forums - September 26, 2007 Kansas Energy Council Public Forum on Draft Policy Recommendations Liz Brosius KEC Director.
2 A Brief Energy Trust Primer Product of 1996 Regional Review and 1999 Oregon Legislation establishing a 3% public purpose charge on two electric investor.
1 VIABILITY OF SOLAR ENERGY BASED ELECTRICITY GRID- REGULATORY CHALLENGES AND OPPORTUNITIES Nigerian Electricity Regulatory Commission, Abuja Presentation.
Brian Ross, Principal, CR Planning, Inc. Local Best Practices for Solar: Planning, Zoning, and Permitting 1 Best Practices Webinar December 5, 2012.
What - How Does Solar System Work? Grid-connected projects can apply for Net Metering (utility meter spins backwards)
SOLAR BASICS. CONTENTS I.Introduction to Solar Technology II.Terminology: Solar Terms and Energy Terms III.Costs and Financing IV.Basics of Federal, State,
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
Low Carbon Energy Futures workshop Alison Lax Project Manager – Low Carbon Communities.
AZ APA Conference September 29, 2011 Solving a Solar Land Use Issue Bruce Plenk, City of Tucson Solar Energy Coordinator.
Solar America Showcases Activity Objective: Promote large-scale, high-impact solar installation projects via technical assistance Eligible Applicants:Businesses,
King County Wastewater Treatment Division What you need to know about WTD’s Technical Standards.
//plug-in ready michigan //powerpoint// made possible through the generous support of the U.S. Department of Energy plug-in ready michigan an electric.
Go SOLAR Broward Rooftop Solar Challenge. What is Go SOLAR Broward Rooftop Solar Challenge? U.S. Department of Energy Grant Broward County and 14 partner.
Keynote: Building a National Solar Market. Building a National Solar Market Tom Tansy Chairman of SunSpec Alliance and Program Manager of Solar 3.0.
Design Manual Update City of Tacoma Public Meeting April 10, 2014 Jim Parvey, P.E., LEED AP City of Tacoma Senior Principal Engineer.
Rooftop Solar Challenge II Planning Meeting What was accomplished in Phase I? What are the plans for Phase II? How can your municipality get involved?
Agenda 1.Welcome and Introductions 2.Go SOLAR Program Update 3.Go SOLAR Online Permitting System 4.Guide to Go SOLAR – for home owners and small business.
1 Brownfields Prevention Transformed Deborah Orr EPA Region 5 August 2008.
Go Solar Florida Spanish Delegation to Renewable Energy Forum, November 14, 2014 Matthew R Anderson, Outreach/Marketing Chair- Go Solar Florida 1.
JUNTOS CONSTRUIMOS UN PAIS DE CALIDAD HONDURAS RENEWABLE ENERGY 2012.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
EV Strategy: Process for Recommendations Joan Rohlfs MWCOG January 17, 2012.
CPUC Role in AB 32 Implementation LIOB – 2 nd June, 2010 San Diego, CA.
Session 12 Grid Tied PV Systems – Part 2 Design Considerations October 06, 2015.
Draft of Terms Of Reference For Hiring a Consultant “Study for establishing the regulation and tools in implementing of DG connection to distribution network”
Conference Session Wrap Up Reform of Minnesota Planning & Zoning Enabling Laws 2010 Upper Midwest Conference APA Minnesota Legislative Committee Andrew.
Agenda Welcome Go SOLAR Grant Mid-Year Status Update On-going Challenges – In-kind Exchange Agreement for Structural Designs Potential solutions from.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Community Development Department APPLICATION 2922 VARIANCE TO REDUCE LANDSCAPE BUFFER.
Edmonds Development Services Department. City of Edmonds  City of ~40,000  A record 1,559 building permits in 2015  Existing website, maintained by.
Transportation and Climate Initiative’s Cassie Powers, Georgetown Climate Center December 3, 2013.
Community Solar. Background Review of Electricity System mandated by Bill 1 – Nov “Our Electricity Future, Nova Scotia’s Electricity Plan” released.
Green Communities Grant Program Town of Lincoln March 8, 2010 icfi.com © 2006 ICF International. All rights reserved.
Airdrie Land Use Bylaw Presentation to City Council May 2, 2016.
Solar Energy Technologies Program Solar America Communities: Transforming the U.S. Solar Energy Market through Local Action April 4, 2011 Patty Kappaz.
Getting to Net Zero Taskforce March 4. Agenda Getting to Net Zero Task Force Meeting. March 4th, :00PM-9:00 PM Smith Campus Center 700 pm Welcome.
Solar Electricity Generation: Government Leading by Example in Solar Deployment Federal Environmental Symposium June 5, 2007 U.S. Department of Energy.
The Crash Course for Municipal Planning Commission Members in Cumberland County 1.
Development Permit System. Development Permit System 2 Disclaimer  The information presented is provided as background information to facilitate understanding.
AGENDA ITEM: DATE: PROJECT: APPLICANT: PRESENTOR: AGENDA ITEM: DATE: PROJECT: APPLICANT: PRESENTOR: 9.01CA3-05 January 17, 2006 City-initiated Code Amendment.
California Solar Permitting Guidebook
MULTIFAMILY PERFORMANCE PROGRAM
Mn Association of County Planning and Zoning Administrators
NC AWWA-WEA 97th Annual Conference
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Photovoltaic (PV) Inverter Market Price, Packaging Trends, Industry Outlook.
Photovoltaic Systems Engineering Session 19
Photovoltaic Systems Engineering Session 26
Low Impact Development: Stumbling Blocks or Stepping Stones?
Abuja Housing Show 18th July, 2018
Land Use Planning & Zoning for Solar
Focal Area and Cross Cutting Strategies – Climate Change
Photovoltaic Systems Engineering Session 12
Photovoltaic Systems Engineering Session 22
What are Solar America Cities?
Mayors’ Commission on Climate Change
Mayors’ Commission on Climate Change
DEVELOPMENT IMPACT FEES AB 1600 UPDATE
Presentation transcript:

Brian Ross, Principal, CR Planning, Inc. Local Best Practices for Solar: Planning, Zoning, Permitting 1 Solar Minnesota November 26, 2012

Minnesota Solar Challenge 2

Part of the U.S. Department of Energy SunShot Initiative PV Rooftop Challenge  Program Goal: To make solar electric generation (photovoltaic, or PV) widely cost- competitive with conventional grid sources of electricity by Minnesota Solar Challenge Initiative

U.S. DOE Rooftop Solar Challenge Source: U.S. DOE SunShot Initiative Creating a Self-Sustaining Solar Energy Market

Source: GTM Research, The Wall Street Journal Solar Panel Price Drops 5

Logarithmic Volume, Costs 6

Source: Solar Energy Industry Association, 2012 Downward Cost Trend 7

Source: U.S. DOE SunShot Initiative Focus on Cost Components 8

Source: Benchmarking Soft Costs for PV Systems in the United States, Ardani, NREL, 2012 Non-Structural Balance of System Costs 9

Source: us-at / In German 10

U.S. DOE Rooftop Solar Challenge Source: U.S. DOE SunShot Initiative Creating a Self-Sustaining Solar Energy Market

So, is everyone clear on that? Minnesota Solar Challenge Initiative

 Local governments are a critical partner in the task of creating a self-sustaining solar energy market in Minnesota If you remember just one thing Photo credit: Meet Minneapolis

U.S. Department of Energy SunShot Initiative PV Rooftop Challenge  Program Goal: To make PV cost-competitive with conventional grid sources by 2020  Minnesota Department of Commerce Focus: Improve solar access, zoning, development regs Streamline permitting and interconnection Improve net metering Improve financing options for solar Minnesota Solar Challenge Initiative

 Minnesota Solar Challenge Develop best practices consistent with Minnesota’s local government environment and laws Promote best practices to local governments through a variety of organizations and outreach efforts Provide direct assistance to local governments in adapting the best practices to local conditions and priorities Minnesota Solar Challenge Initiative

 Minnesota Solar Challenge Work with GreenStep Cities to incorporate solar energy best practices Adopt solar zoning best practices as a recommended action (#1). Adopt solar permitting best practices as a new action (#7). Complete the zoning and permitting best practices to successfully implement the Renewable Energy Best Practice (#26) Minnesota Solar Challenge Initiative

Renewable Energy in Planning and Policy 17

Renewable energy is an important local resource People in your community will want to take advantage of their renewable energy resources Communities will need to make decisions about how and where solar installations are done Planning Issues Summarized 18

Streamlining the permitting process Implementing Best Practices 19

Streamlining the permitting process  Reduce time spent on acquiring permits and conducting inspections  Ensure that the permit process is transparent to both staff and applicants  Establish a permit fee that covers issuing and inspection costs  Ensure the permit process is consistent with industry best practices Solar Market Transformation Tools 20

1. Identifies when the checklist is applicable 2. Collects basic information about the installation 3. Identifies required drawings and technical information to acquire a permit 4. Identifies when structural engineering review is necessary 5. Identifies criteria for other permit or process requirements Streamlining Permitting Solar Permit Checklist – Saint Paul

Before approval and issuance of permit(s) for solar installations, applicant shall submit the following minimum information... Building integrated solar installations, where the solar collector replaces or substitutes for a component of a building or structure such as roof, shingle, or awning, do not require completionof this checklist separately from the building permit application for the building, structure, or building modification. Streamlining Permitting Solar Permit Checklist – Saint Paul

Building Integrated Solar

Required Drawings and Plans 7. Provide construction drawings that include a building section detail and complete notation of method of fastening equipment to the roof of the subject property, including the following details: Streamlining Permitting Solar Permit Checklist – Saint Paul

Structural Assessment 11. The minimum structural threshold for installing a flush-mounted PV system is a roof structure with at least 2 x 4 rafters no more than 24” on-center spacing Non-flush-mount installations have different potential structural considerations. If the answer to question 10 (is the system flush-mounted?) is no, please provide the following additional information... Streamlining Permitting Solar Permit Checklist – Saint Paul

Ground Mount Submittal info Electrical Information Heritage Preservation 18. Legislative Code § provides that exterior work, including installation of solar energy systems, within city designated heritage preservation sites and districts is subject to review and approval by the Heritage Preservation Commission (HPC) prior to the issuance of city permits. Streamlining Permitting Solar Permit Checklist – Saint Paul

Best Practices on Permit Fees  Most communities charge a permit fee based on the value of the work being performed... Continue to use value, but exclude the cost of the solar panels Set a fixed fee for residential installations ($100 – 250) based on internal costs for review Consider an incentive fee to encourage investment in solar resources Streamlining Permitting

Solar America Board of Codes and Standards (Solar ABCS) ications/reports/expedited- permit/

Streamlining Permitting Photovoltaic on-line training (PVOT) for code officials Go to (Search for “photovoltaics” or PV)

Streamlining Permitting Structural engineering study on Minnesota residential rooftop solar installations. images/SolorRoofsReport.pdf

The Minnesota Solar Challenge offers free technical assistance to local governments Implementing Best Practices 31

Technical assistance to local governments to adopt or incorporate best practices for enabling solar energy development in their community. Best practices focus on:  Removing barriers in local permitting processes (building and electric),  Understanding and adopting reasonable permit fees charged to solar installations, and  Ensuring that land use regulation (including comprehensive plan language and zoning) treats solar energy resources fairly and consistently with other resources and land uses. Solar Challenge Technical Assistance 32

Technical assistance includes:  Workshops presenting local government best practices and how to adapt the best practices.  Working directly with city decision-makers and staff to explain the value of solar.  Presenting and discussing local best practices directly with commissions, staff, elected officials.  Helping individual local governments fit the best practices fit into existing processes and regulations.  Writing draft language or guidance documents for permitting and land use standards to fit the local conditions and circumstances of the individual city. Solar Challenge Technical Assistance 33

Thank You! 34 Minnesota Solar Help Hotline (855)

35 Principal, CR Planning, Inc Brian Ross Laura Cina Managing Director, Minnesota Renewable Energy Society Minnesota Solar Help Hotline (855)