6th RCC Meeting – Region South-South East 30th March 2007, Milano.

Slides:



Advertisements
Similar presentations
Classification: Internal Status: Draft Statoils view on the ERGEG GRI Secondary Capacity work Helga Franse – EU & Regulatory Affairs Stockholm – 26 November.
Advertisements

XVII Madrid Forum January 2010 ERGEG Gas Regional Initiatives P rogress and future work Peter Plug NMa, Director.
Vienna, 8 April th IG Meeting Meeting Guide.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
Jose Braz, ERGEG Conference on Implementing the 3rd Package 11th December 2008 The Agency for the Cooperation of European Energy Regulators.
Erik Sleutjes (Ofgem) GRI NW Government Meeting The Hague, 6 May 2010 Pilot framework guideline on gas balancing – ERGEG initial steps.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Is the regulatory toolset right or is there a need for enhanced regional regulatory oversight? The Regional Initiatives: Europe’s key to energy market.
Madrid, 16th February th IG Meeting South Gas Regional Initiative.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Achieving a sound investment climate – the role of regulators Boaz Moselle Joint-Chair, CEER Gas Working Group Managing Director – Corporate Strategy Ofgem.
1st RCC Meeting – Region South-South East June 1, 2006, ROME.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Creating a Single European Energy Market – the Regulatory Perspective London, 30. January 2007 ERGEG Electricity Regional Initiative Central-East Europe.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007 Mr Walter Boltz ERGEG Gas Focus Group Chair Status Report of the Gas.
TSO progress towards ENTSOG IFIEC Energy Forum 22 Sep 2009 Jacques Laurelut GTE President & GTE+ Transition Manager.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
9th RCC Meeting – Gas Regional Initiative (GRI) Region South-South East 22 January 2008, Prague, Czech Republic.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
DEVELOPMENT OF GAS HUBS South Gas Regional Initiative Madrid, 29th October 2007.
Madrid Forum, 17 October 2007 Gas Regional Initiative Coherence and Convergence.
Virtual Platform for Education Cooperation in the Americas Webinar Technical Secretariat of the Inter-American Committee on Education-CIE Department of.
XIV th Florence Forum 24/25 September 2007 Tahir Kapetanovic / Nicolas Bonnesoeur Chairmen of the CEER Electricity Security of Supply TF C07-SOS-03-03a.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Nigel Sisman,
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Bonn Workshops 8 and 9 Feb Balancing workstream.
3rd SG Meeting – Gas Regional Initiative (GRI) Region South-South East 22 January 2008 Prague, Czech Republic.
Joint Workshop EFET and GRI REM SSE 21 January 2008, Prague, Czech Republic.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
3rd IG Meeting – Region South-South East 9th October 2007, Maribor, Slovenia.
Greater Essex County District School Board Regulation: School Councils Reference NO: R-AD-03 Principal Chris Mills.
Regional Initiative Progress and Next Steps Graeme Steele.
7th RCC Meeting – Region South-South East 5th July 2007, Krakow, Poland.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
1st Implementation Group Meeting – Region South-South East 13th 2006, Vienna.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
New approach in EU Accession Negotiations: Rule of Law Brussels, May 2013 Sandra Pernar Government of the Republic of Croatia Office for Cooperation.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
Improved communication to better reach Regional Initiatives stakeholders Ms Una Shortall CEER Deputy Secretary General The Regional Initiatives: Europe’s.
7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.
Licences for Europe Introductory meeting, 4 February WG 4 – Text and data mining.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Region South-South East
Gas Regional Initiative South South-East
FlorenceForum November 2008
2009 TSO Transparency Gas Regional Initiative North-West
Logo(1.00”:3.33”) Font is Rotis Sans Serif however font may have to be embedded as it is important that this does not change on any presentations Size.
Achieving the Internal Gas Market The view of gas suppliers
29th April 2014 Teleconference
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
Gas Regional Initiative South South-East
Incentives for electricity infrastructure – ERGEG view
REFIT Platform 20/02/2019 Diversity Europe Group.
Gas Regional Initiative South South-East
Presentation transcript:

6th RCC Meeting – Region South-South East 30th March 2007, Milano

2 Agenda Agenda TopicsRapporteur Opening Approval of the agenda Approval of minutes 5 th RCC Update on new CEER rules Co-chairs 9:152. Preparation of the Stakeholder Meeting and Development of the GRI in the SSE regional market after the 2nd Stakeholder Meeting: regulatory harmonisation and promotion of OSS services AGEN, AEEG, E-Control 10:303. ClosureCo-chair

3 New CEER rules – General Framework (1) Invitations to all stakeholders in the stakeholder’s Group  engage governments in the stakeholder’s group  engage implementation groups Annual Report important basis for dialogue with stakeholders  ERGEG Chair to present report to EU Parliament, ITRE Committee  Lead Regulators present report to National Parliaments and their regions  Individual Regulators pursue further contacts with Ministries on content of Annual Report

4 New CEER rules – General Framework (2) Annual Conference  Ensure wide participation of those invited to Madrid and Florence Fora  Organization through CEER Secretariat  Chairmanship by ERGEG

5 New CEER rules – Lead Regulator’s Tasks in GRI TASK 1 Internal Organization of the Region TASK 2 Communication with CEER Secretariat TASK 3 External Communication TASK 4 Cooperation+Information Exchange with GRI-TF/GFG/GA/ERGEG Invitation to Meetings, Agendas, Minutes, Organization of Meetings, monthly update (by 15th of the month) of website key achievement, general update of website Inform about new public consultations and press releases on website, scheduled meeting dates within the 5 first days of the quarter Present Annual RI Report to Nat. Parliaments and their regions; Strong involvement in organization of Annual Conference Provide input for quarterly report and presentations on each region for GA

6 New CEER rules – Communication Policy Jan FebMarAprMay Jun JulAugSeptOctNovDec Annual Report Letter by ERGEG chair to the EU Presidency on progress regarding the Regional Initiatives (twice a year) Correspondence with Ministries, outlining progress in the region by Lead Regulators (quarterly) Correspondence with Key Stakeholder’s organizations on progress of particular topics (regularly) Annual Conference

7 Five steps to become an online subscriber 1.- Point your browser to (or to Click on “Create new Login” 3.- Fill in your personal data 4.- Select regions you are interested in 5.- Register To subscribe, you first need a login. If you want you can edit your user profile to be automatically notified of news of the Regional Initiatives.

8 Internet users can subscribe to public areas

9 You can: - Change your password - Edit User and modify personal data - Subscribe to one or more sections Internet users can modify his/her subscription or unsubscribe

10 Agenda Agenda TopicsRapporteur Opening Approval of the agenda Approval of minutes 5 th RCC Update on new CEER rules Co-chairs 9:152. Preparation of the Stakeholder Meeting and Development of the GRI in the SSE regional market after the 2nd Stakeholder Meeting: regulatory harmonisation and promotion of OSS services AGEN, AEEG, E-Control 10:303. ClosureCo-chair

11 Route Assessment – Regulators’ conclusions (1) Addressing contractual congestion Proposed solution:  platform for re-trading transmission capacity  standardised bulletin board for secondary market capacity trading Proposed action:  TSOs are invited to set up an Enabler Group to establish a best- practice standardised bulletin board (e.g. Trac-X, OMV Gas platform)

12 Route Assessment – Regulators’ conclusions (2) Addressing long-term physical congestion Proposed solution:  information sharing between market participants and TSOs on planned investments and demand forecasts in the region  aggregation of information on transmission capacity development in order to identify future bottlenecks Proposed action:  TSOs are invited to set up an Enabler Group to establish a summary of planned investments in the region

13 Route Assessment – Regulators’ conclusions (3) Addressing remaining obstacles to implementation of IPA/OBA Proposed solution:  coordination among TSOs for implementation of IPAs/OBAs  “common voice” when negotiating with GazExport Proposed action:  TSOs are invited to set up an Enabler Group to coordinate on installation of IPAs/OBAs

14 Regional OSS service – Regulators’ Conclusions (4)  Step 1 outlined that an OSS service would facilitate network access for new shippers Proposed action:  TSOs are invited to set up an Enabler Group to establish a framework for the provision of a OSS service

15 REETS – Regulators’ Conclusions (5) Proposed action:  ???

16 Hub as balancing point – Regulators’ Conclusions (6)  How can hubs bring liquidity to the regional market? Proposed action:  Hub operators are invited to set up an Enabler Group to establish a regional balancing market

17 APOutputChairMembersResult until 1 Best-practice standardised bulletin board 2 Summary of planned investments in the region 3 Removing remaining obstacles to implementation of IPA/OBA 4 Best practice provision of OSS service 5REETS ??? 6 Hub development as regional balancing market Actions to be taken forward by Enabler Groups