Ministry of the Environment Certificates of Approval Anaerobic Digestion Facility Pre-Construction DIGGING INTO BIOGAS DETAIL WORKSHOP April 5, 2008.

Slides:



Advertisements
Similar presentations
Veolia Environmental Services Rolling Hills Mixed Municipal Solid Waste Landfill Project Rolling Hills Mixed Municipal Solid Waste Landfill Project Wright.
Advertisements

The Process of Siting and Approving a New Landfill in Ontario
CONFIDENTIAL DRAFT Modernization of Approvals Project Update July, 2010.
The BC Oil & Gas Commission Proactively Participating in Project Decision Making Processes James O’Hanley Deputy Commissioner.
Planning Permission Process and Procedures
Presented by Fred Barker, P.E., MassDEP Boston Massachusetts Department of Environmental Protection Drinking.
Notice & Appeal: Ontario’s Environmental Bill of Rights Jennifer Danahy Associate, Toronto Office Gowling Lafleur Henderson LLP.
BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.
1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.
Sector Planning Process Alachua County Commission July 8 th,
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
Environmental Assessment in Newfoundland & Labrador Environmental Assessment in Federations: Current Dynamics and Emerging Issues Conference Current Dynamics.
FUNDED BY THE EUROPEAN COMMISSION S ustainable and C leaner Production in the Manufacturing I ndustries of Pak istan SCI-Pak Mar Feb 2012.
Keeyask Generation Project Environmental Assessment Process Tracey Braun, M. Sc. Director, Environmental Approvals Branch Conservation and Water Stewardship.
The Basics on Capital Project Financing Presented by: Mark Brewer November 2012.
How Do You Write the Next Generation Climate Action Plan?
Ministry of the Environment Certificates of Approval for an Anaerobic Digestion Facility Post Construction DIGGING INTO BIOGAS DETAILS WORKSHOP April 5,
Developing Final Phase II WIPs and Milestones Katherine Antos Chesapeake Bay Program Office Jenny Molloy Water Protection Division DC Draft Phase II WIP.
High Performance Building Standard Regulations An Introduction.
Is an environmental assessment required? November 15, 2012.
GEF IN TAJIKISTAN Dr. Neimatullo SAFAROV CBD and CPB National Focal Point Republic of Tajikistan.
1 Palestinian Integrated Rural Environmental Protection Plan By Hossam Zaqoot June 2005 European Commission LIFE Third Countries Palestinian National Authority.
Office of Sustainable Initiatives Florida Clean Marina Program Brenda Leonard Program Administrator September 15, 2015.
Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic.
INTRODUCTION The 1987 Philippine Constitution lays down the basic framework for our policy on the environment. Section 16, Article II states that “The.
1 Enabling environments for technology transfer under the UNFCCC Daniele Violetti Programme Officer, Technology Climate Change Secretariat (UNFCCC) UNFCCC.
Consultant: CMDC Joint Venture 1 The Polish Experience and Possibilities of a Future EIA Centre Beata Wiszniewska EIA Expert, Poland June 8 th 2004.
1 LAFCO Staff Workshop Crowne Plaza Hotel, San Jose Executive Officer Bob Braitman Legal Counsel Scott Browne.
Environmental Impact Assessment in the Slovak republic.
PUBLIC MEETING Application for Zoning Amendment 60 – 80 9 th Street East Ontario Inc. in accordance with Section 34 of the Planning Act 6 May 2013.
Jessica Montanez Environmental Protection Agency NEW SOURCE REVIEW (NSR) PROGRAM.
Developing Proposals for a System of Indicators on the Nation’s Environment (the SINE) H. Theodore Heintz, Jr. Indicator Coordinator White House Council.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Environmental Protection and Permitting Nurhan IZAIRI Minister of Environment and Physical Planning Republic of Macedonia CONSTRUCTION PERMITS FOR A COMPETITIVE.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Office of Sustainable Initiatives Florida Clean Marina Program Brenda Leonard Program Administrator June 30, 2015.
Mackenzie Valley Environmental Impact Review Board Presentation of Technical Submission Avalon Rare Metals Inc. Thor Lake Rare Earth Element Project February.
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
High Performance Building Standard Regulations. Topics Covered Today What are they? What projects do they apply to? How does it affect a project?
1 Public Workshop to Discuss Amendments to the AB 2588 “Hot Spots” Emission Inventory Criteria and Guidelines Regulation California Air Resources Board.
1 Planning 4A7 Design & the Built Environment Dept. of Civil, Structural, & Environmental John O’Connor.
MODULE 1: INTRODUCTION TO PLANNING & ROLE OF THE PLANNER INTRODUCTION TO THE IRISH PLANNING SYSTEM 24 TH MARCH 2015 Please note this is an information.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
Lecturer: Lina Vladimirovna Zhornyak, Associate Professor.
Haldimand County DFA Infrastructure International Inc. Presentation to Committee of the Whole January 11 th, 2016 & Water O.Reg 453/07 Financial Plan 1.
Virginia Energy Conservation and Environmental Standards May 19, 2009 Capital Outlay & Facilities Manager Forum.
Development Permit System. Development Permit System 2 Disclaimer  The information presented is provided as background information to facilitate understanding.
Climate: ANPR, SIPs and Section 821 WESTAR October 2, 2008.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Municipal Class Environmental Assessment
GENETICALLY MODIFIED ORGANISMS ACT
Environmental Evaluation of Projects in Greece
Introduction to dep manure management plan
Legislation and Mapping
NATIONAL ENVIRONMENTAL MANAGEMENT LAWS AMENDMENT BILL [B14 – 2017] PORTFOLIO COMMITTEE ON ENVIRONMENTAL AFFAIRS MEETING OF 30 JANUARY 2018.
SMA ENVIRONMENTAL FORUM 2018
Chapter 21 Water Pollution and Treatment
National Environmental Policy Act of 1969 (NEPA)
Pesticides Dashboard and ECHO
The Dirt on Dirt in Ontario
Excess Soil Management in Ontario
Relationship between World Bank and Romanian EA requirements
37th Drainage Engineers Conference Guelph, October 2005
30 JANUARY 2019 PRIVATE HEALTH ESTABLISHMENTS
Presidential Permits Implementing EO 13337
Introduction to dep manure management plan
28 NOVEMBER 2018 PRIVATE HEALTH ESTABLISHMENTS
UNEP’s Global Environmental Outlook 6
1.8 Area-based regulations
Enabling environments for technology transfer under the UNFCCC
Presentation transcript:

Ministry of the Environment Certificates of Approval Anaerobic Digestion Facility Pre-Construction DIGGING INTO BIOGAS DETAIL WORKSHOP April 5, 2008

2 Outline Introduction Required Certificate of Approval (CofA) for Anaerobic Digestion Facility CofA Application Process

3 Ministry Business Overall –To provide for the protection, conservation and wise management of Ontario’s environment –Air, land and water Water –Protect drinking water and fresh water resource and for their efficient and sustainable use

4 Required Cs of A for Establishing an Anaerobic Digestion Facility (AD) Approval under Part V of the Environmental Protection Act (EPA) –AD uses only agricultural waste → exempt –Regulated mixed AD → exempt –AD that is not in the above two categories → requires C of A Approval under the: –Environmental Assessment Act (EAA) –Ontario Water Resources Act (OWRA); and, –Section 9 of the EPA (air approval)

5 Application and Review Process Stage 1 Pre-consultation with District Office (Recommended) Stage 2 Application Preparation Stage 3 Application Processing and Screening Stage 4 Posting on the EBR Registry Stage 5 Technical Review Stage 6 Approval Decision Stage 7 Appeal Provisions If Environmental Assessment does not apply Submit registry proposal file Post on EBR (min. 30 days) Post Decision 3rd Party Appeal Provisions Submission