Environmental Impact Assessment (EIA): Overview

Slides:



Advertisements
Similar presentations
CONSULTATION AND THE SAFEGUARD POLICIES ECA Safeguard Training for PIUs, May 17, 2011.
Advertisements

THE DIVERSITY OF INTERESTS IN ENVIRONMENTAL GOVERNANCE A CHALLENGE FOR THE RULE OF LAW By Professor D E Fisher.
Presentation by Cambodian Participants Phuket, Thailand February 2012 Health Impact Assessment Royal Government of Cambodia.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Scoping.
Scoping in the EIA process Proposal Identification Screening
Public Consultation/Participation in an EIA Process EIA requires that, as much as possible, both technical / scientific and value issues be dealt with.
HEADQUARTERS Strategic Environmental Assessment ”SEA is a systematic process for evaluating the environmental consequences of proposed policy, plan or.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Monitoring.
Environmental Impact Assessment Myriam Raiche November 8, 2007.
1 CEER How to balance the public’s concerns and critical infrastructure construction Matti Vainio, Deputy HoU DG ENV – C.5, European Commission.
AN INTRODUCTION TO STRATEGIC ENVIRONMENTAL ASSESSMENT
ENVIRONMENTAL MANAGEMENT PLAN
Topic 6 Environmental Impact Assessments. EIA – Introduction The start Effectiveness?
Secretariat to the Espoo Convention and its Protocol on SEA
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Policy Responses and Follow-up Session 4.
Involuntary Resettlement 0P 4.12: Financial Intermediaries and Resettlement Planning Instruments.
1. 2  Strategic – BC Hydro Long Term Planning  Project level  Environmental Assessment ▪ Federal - Canadian  Integration 3.
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Integrated Assessment and Planning for Sustainable.
1 Brace Centre for Water Resources Management McGill University, Sept. 25 François Boulanger, Regional Director The New Canadian Environmental Assessment.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
Life Cycle Overview & Resources. Life Cycle Management What is it? Integrated concept for managing goods and services towards more sustainable production.
Integrated Assessment and Planning
Energy Issues in Peru and the Andes: Environmental and Social Aspects George Washington University January 28, 2005 Dr. Robert H. Montgomery Head, Environmental.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
Tunis 17th May 2011 John Horberry Lead Consultant Environmental Resources Management INTERNATIONAL CONSULTATIVE MEETING ON BIODIVERSITY AND ECOSYSTEM SERVICES.
What If I Have to Go Beyond an IEE?. EA Training Course Tellus Institute 2 Environmental Assessments (EAs) & Programmatic Environmental Assessments (PEAs)
UNEP Training Resource Manual Topic 11 Slide 1 Aims of EIA implementation and follow up are to: F carry out conditions of approval F ensure they work effectively.
Consultant: CMDC Joint Venture Key principles and effectiveness of EIA.
What is Necessary to Ensure Natural Justice in EIA Decision-making? Angus Morrison-Saunders Senior Lecturer in Environmental Assessment School of Environmental.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
Energy, Environmental Impacts, and Sustainable Development Presented by Cat Shrier, Ph.D., P.G. Water Resources Planner (403)
INTRODUCTION TO ENVIRONMENTAL IMPACT ASSESSMENT Dr.Wesam Al Madhoun.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
UNEP Training Resource Manual Topic 10 Slide 1. UNEP Training Resource Manual Topic 10 Slide 2 EIA is a process to: F gather information necessary for.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
UNEP Training Resource ManualTopic 2 Slide 1 The EIA process The EIA process comprises:  screening - to decide if and at what level EIA should be applied.
SECTION IV: GENERAL DESCRIPTION OF STEPS TAKEN OR ENVISAGED BY NON-ANNEX I PARTY TO IMPLEMENT THE CONVENTION Workshop on the Use of the Guidelines for.
INTRODUCTION TO ENVIRONMENTAL IMPACT ASSESSMENT. EIA Procedures and Decision Making 2 Course Learning Objectives At the end of this course you should.
Implementation and follow up Critically important but relatively neglected stages of EIA process Surveillance, monitoring, auditing, evaluation and other.
Mitigation and Impact management
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Evaluation and Review of Experience from UNEP Projects.
SEA in the Czech Republic Prague, 24 September 2008.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
Introduction to Environmental Impact Assessment
Overview of Environmental Impact Assessment. Overview of EIA The Basics Who Sets the standards? Why do an E(SH)IA? Where does it fit in development planning?
1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012.
UNEP EIA Training Resource ManualTopic 14Slide 1 What is SEA? F systematic, transparent process F instrument for decision-making F addresses environmental.
Linking SEA and City Development Strategy (CDS) in Vietnam Maria Rosário Partidário, Michael Paddon, Markus Eggenberger, Minh Chau, and Nguyen Van Duyen.
1 Integrating Biodiversity Conservation Into Impact Assessment: The Experience of Uganda BERINA UWIMBABAZI.
IAIA Conference on international experience & perspectives in SEA, Prague, September 2005 IAIA Conference on international experience & perspectives.
Addressing Health in SEA for Healthy Public Policy An initial contribution from SEA development in Thailand Suphakij Nuntavorakarn, Nuntana Sabrum, Decharut.
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
ENVIRONMENTAL IMPACT ASSESSMENT: A TOOL FOR DECISION MAKING.
LECTURE 2 EIA/EIS. Proposed Undertaking (> 10 hectares) Determine whether there are environmental, health and safety impacts Application for environmental.
INTERNATIONAL AND TRANSBOUNDARY ENVIRONMENTAL ASSESSMENT LAW OCTOBER 29, 2012.
Special Meeting on Procedures for Information Exchange November 7, 2007 Geneva Session 1 Anne Meininger United States USA WTO TBT Enquiry Point.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE The role of EIA and decision-making.
ISO Session 3 Environmental Management and Ethics in Management.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
TOOLS FOR MINING DEVELOPMENT POLICY AND IMPLEMENTATION
Session 3 General RIA Training 6–8 July 2009 EuropeAid/125317/D/SER/TR
EIA approval process, Management plan and Monitoring
Stakeholder consultations
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
What is Necessary to Ensure Natural Justice in EIA Decision-making?
INTRODUCTION TO ENVIRONMENTAL IMPACT ASSESSMENT Dr.Wesam Al Madhoun
Involuntary Resettlement 0P 4.12: Planning Instruments
Strategic Environmental Assessment (SEA)
EIA- Concept and Practice
Environmental Impact Assessment EIA
Presentation transcript:

Environmental Impact Assessment (EIA): Overview Session Objectives: Explain what EIA is about Discuss the EIA process

Agenda EIA & its evolution EIA principles EIA process Benefits of EIA Discussions

What is EIA? US EPA National Environmental Policy Act (proclaimed in 1970) called for: public statement of environmentally significant consequences of all federal actions public input into project formulation informed decision-making This process became known as EIA

Purposes of EIA modify and improve design ensure efficient resource use enhance social aspects identify measures for monitoring & managing impacts inform decision-making provide justification for a proposal

Various Aspects of Environmental Impacts type and nature magnitude extent timing duration uncertainty reversibility significance

Integration within EIA The process of EIA has moved towards the consideration of all effects arising from a proposal. These can include: biophysical social health economic risk and uncertainty

Evolution of EIA Early 1970s - initial development 1970s to 1980s - trend to integration Mid to late 1980s - cumulative effects and policy integration Mid 1990s - towards sustainability (SEA- strategic environmental assessment, biodiversity)

EIA Developments in the 1990s: Major reforms to well established systems Implementation of EC Directive (1985) World Bank and other agencies introduce policies Convention on EIA in a Transboundary Context (1991) Conventions on Climate Change and Biological Diversity

EIA-Three Core Values Sustainability - the EIA process will result in environmental safeguards Integrity - the EIA process will conform to agreed standards Utility - the EIA process will provide balanced, credible information for decision-making Sadler, 1996

EIA - Eight Guiding Principles Participation Transparency Certainty Accountability Sadler, 1996 Credibility Cost-effectiveness Flexibility Practicality

EIA Operating Principles I EIA should be applied: to all development project activities likely to cause potentially significant adverse impacts or add to actual or potentially foreseeable cumulative effects as a primary instrument for environmental management to ensure that impacts of development are minimized, avoided or rehabilitated Sadler, 1996 so that the scope of review is consistent with the nature of the project or activity & commensurate with the likely issues & impacts on the basis of well defined roles, rules and responsibilities for key actors

EIA Operating Principles II EIA should be undertaken: throughout project cycle, beginning as early as possible in the concept design phase with clear reference to the requirements for project authorization & follow-up, including impact management Sadler, 1996 consistent with the application of 'best practicable' science & mitigation technology in accordance with established procedures & project-specific terms of reference, including agreed timelines to provide meaningful public consultation with communities, groups & parties directly affected by, or with an interest in, the project and/or its environmental impacts

EIA Operating Principles III EIA should address, wherever necessary or appropriate: All related & relevant factors, including social and health risks & impacts Cumulative and long-term, large-scale effects Design, locational and technological alternatives to the proposal being assessed Sustainability considerations including resource productivity, assimilative capacity and biological diversity Sadler, 1996

EIA Operating Principles IV EIA should result in: Accurate & appropriate info as to the nature, likely magnitude & significance of potential effects, risks & consequences of a proposed undertaking & its alternatives Preparation of an impact statement or report that presents this info in a clear, understandable & relevant form for decision-making, including reference to qualifications, & confidence limits in the predictions made Ongoing problem solving and conflict resolution to the extent possible during the application of the process Sadler, 1996

EIA Operating Principles V EIA should provide the basis for: Environmentally sound decision-making in which terms & conditions are clearly specified and enforced Design, planning and construction of acceptable development projects that meet environmental standards and resource management objectives An appropriate follow-up process with requirements for monitoring, management, audit & evaluation that are based on the significance of potential effects, the uncertainty associated with prediction & mitigation, & the opportunity for making future improvements in project design or process application Sadler, 1996

The EIA Process Screening Scoping Assessing Mitigating Reporting Reviewing Decision-making Monitoring & managing Public involvement

EIA Costs for Multipurpose Projects in Thailand

Delays are caused during EIA when: EIA is commenced too late in the project cycle TORs are poorly drafted EIA is not managed to a schedule EIA report is inadequate and needs to be upgraded Lack of technical data

Benefits of EIA include: more environmentally sustainable design better compliance with standards savings in capital and operating costs reduced time and costs for approvals avoids later plant adaptations reduced health costs increased project acceptance

Ensuring Fairness in the EIA Process register consultants' names and terms of reference name consultants and their expertise in the EIA report publish the terms of reference in the EIA report make EIA reports available to the public publish lists of screening and final decisions along with conditions for approval