Canada vs. USA Environmental Regulation (Why Canadians are better known for hockey) Georgia Basin-Puget Sound International Airshed Strategy Meeting September.

Slides:



Advertisements
Similar presentations
Challenges in Finding and Connecting New Water Sources J. Tupling, P.Eng. June 22, 2009.
Advertisements

Effective Contract Management Planning
Structuring and Implementing a Truly International ERO Kevin Kelly Director, Policy Analysis and Rulemaking Office of Markets, Tariffs and Rates Federal.
Facility Lead Corrective Action Approaches Voluntary Agreements RCRA National Meeting August 13, 2003 Jennifer Shoemaker EPA Region 3.
Consultation Conference New Brunswick First Nations Training Seminar and Strategy Session The Legal Duty to Consult and Canada’s Approach to Aboriginal.
Tribal Permit Training Fond du Lac Reservation June 11, 2013.
29e CONFÉRENCE INTERNATIONALE DES COMMISSAIRES À LA PROTECTION DES DONNÉES ET DE LA VIE PRIVÉE 29 th INTERNATIONAL DATA PROTECTION AND PRIVACY COMMISSIONERS.
LNG USA 2005 IQPC Houston, Texas November 9, 2005 Bruce F. Kiely Baker Botts L.L.P. Washington, D.C.
Preparing an Essential-Use Nomination for CFC MDIs: The U.S. Experience Consultative Meeting on Essential Use Nominations Bangkok, Thailand 6 July 2008.
Environmental Impact Assessment Myriam Raiche November 8, 2007.
Lecture(2) Instructor : Dr. Abed Al-Majed Nassar
Opportunities for RAC Participation. Three Part discussion General presentation; Example of oil and gas decision making; and Panel Discussion of RAC involvement.
Safeguarding Animal Health 1 Proposed BSE Comprehensive Rule: A New Approach to BSE Rulemaking Dr. Christopher Robinson Assistant Director, NCIE BSE Comprehensive.
Romania’s Reporting Activities under the UNFCCC and Kyoto Protocol Mr. Vlad Trusca Head of Climate Change Unit, UNFCCC National Focal Point Ministry of.
DECENTRALIZATION OF ENVIRONMENTAL ENFORCEMENT IN SRI LANKA UDAYA P GAMMANPILA CHAIRMAN CENTRAL ENVIRONMENTAL AUTHORITY.
1 BC Health Act Renewal Project May 2005 Dr. Brian Emerson BC Ministry of Health Services gems1.gov.bc.ca Ph
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
IWRM PLAN PREPARED AND APPROVED. CONTENT Writing an IWRM plan The content of a plan Ensuring political and public participation Timeframe Who writes the.
1 Brace Centre for Water Resources Management McGill University, Sept. 25 François Boulanger, Regional Director The New Canadian Environmental Assessment.
Environmental Impact Assessment (EIA): Overview
Implementing the Second Pillar of the Aarhus Convention: Problems Identified in the National Implementation Reports Magda Tóth Nagy, Senior Expert Geneva,
D2.TTO.CL4.12 Slide 1. Subject Elements This unit comprises five Elements: 1.Describe the social and cultural impacts of tourism operations 2.Describe.
The Aarhus & Espoo Conventions Making implementation work for stakeholders.
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
John Neuner, Program Manager ASCLD/LAB-International CWAG January 28, 2010 Sacramento, California.
Rome Energy Meeting 2008 Rome, November 2008 Investments Opportunities and Project Finance in the Energy Market Luigi Marsullo President Finpublic.
1 UNDECLARED WORK IN CROATIA Executive Capacity of Governance and Underground Economy: The Case of Croatia Zagrebl, September 1, 2015.
Bill C-45 Deficiencies Concerns from Canadian Environmental Organizations Susanna D. Fuller, Marine Coordinator, Ecology Action Centre February 26 th,
Environmental Assessment at a Crossroads Stephen Hazell December 5, 2012.
1.  Policy Cycle  Government actors - incentives  Interest Groups  Interests  Resources  Strategies 2.
Agency Coordination: Fraser River Estuary Management Program [FREMP] Georgia Basin/Puget Sound Research Conference 3 April 2003 Vancouver,
Environmental Management System Definitions
Roundtable on Validation and Verification Issues in LULUCF Projects The World Bank, Washington DC August 24-25, 2009 Issues in Validation of A/R Projects.
UNEP Training Resource ManualTopic 2 Slide 1 The EIA process The EIA process comprises:  screening - to decide if and at what level EIA should be applied.
Dongmei GUO China-ASEAN Environmental Cooperation Center & Huang Mingxiang, Environmental Development Center of Ministry of Environmental Protection.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
USEPA REGION 4 Quality Management Plan ( For training purposes only)
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
Session 6: Summary of Discussion A. Institutional Barriers and Potential Solutions 1. Natural environment does not have national or institutional boundaries,
Planning schemes Statutory documents under s.20(2) of LUPAA –outline policies and objectives –regulate or prohibit use or development of land –reserve.
The Splendours and Miseries of Regulatory Impact Assessment in the Czech Republic Daniel Trnka Regulatory Policy Division, Directorate for Public Governance.
Regulatory Impact Analysis (RIA) in OECD countries: a policy tool to manage the flow of regulation Regional Capacity-Building Seminar on “Drafting Legislation.
APPROACHES TO REGULATORY AND ADMINISTRATIVE REFORM Regulatory Impact Assessments: Case study from Uganda.
Environmental Assessment in British Columbia Forum of Federations Conference September 14, 2009.
CAA Program Reporting Clarification Regarding Federally-Reportable Violations for Clean Air Act Stationary Sources (March 2010) (FRV Clarification Memo)
Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Water Services Training Group 13 th Annual Conference 10 th.
United States-Canada Regulatory Cooperation Council TBWG Fall Plenary November,
Cooperating Agency Status Presented by Horst Greczmiel Associate Director, NEPA Oversight Council on Environmental Quality Washington, DC September 14,
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
An overview of OECD Strategies for Improving Regulatory Performance Regulatory Reform and Building Governance Capacities – New Delhi 3 December 2009 Mr.
A Comparative Analysis of EIA Systems in Latin America Ernesto Sánchez Triana and Santiago Enríquez 27th Annual Conference of IAIA Seoul, Korea 3-9 June,
Special Meeting on Procedures for Information Exchange November 7, 2007 Geneva Session 1 Anne Meininger United States USA WTO TBT Enquiry Point.
Perspective on Contingency Mitigation Options Presented by John Annicchiarico, Senior Engineer August 17, 2015.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
Michael Kidd November  “Laws are good but their enforcement is inadequate”  Dernbach 2 November 2009: ‘The USA has a well-developed and reasonably.
C.H. Montin, Tbilisi 11 Tbilisi, 12 November 2014 Developing Regulatory Impact Assessment In Georgia Overview of the RIA process & methodology Charles-Henri.
ISO Session 3 Environmental Management and Ethics in Management.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
BLM Decision Making Process
Sample Fit-Gap Kick-off
I II Review areas Review criteria Weighted Rating Description of
EIA approval process, Management plan and Monitoring
New Comprehensive Zoning By-law December 12, 2016.
Session 2: Institutional arrangements for energy statistics
Setting Actuarial Standards
Tribal Roles in Minor NSR by: Joy Wiecks, Fond du Lac Band
Relationship between World Bank and Romanian EA requirements
Stakeholder Engagement: Webinar Part I: The Regulatory Development Process for the Government of Canada Part II: Making Technical Regulations Under.
Stakeholder Engagement
Presentation transcript:

Canada vs. USA Environmental Regulation (Why Canadians are better known for hockey) Georgia Basin-Puget Sound International Airshed Strategy Meeting September 23, 2009 Stephen O’Kane Levelton Consultants Ltd.

Overview Fundamental Differences in Regulatory Process Notification/Consultation Requirements Preparing for a Permit/Assessment Review

Must take into consideration: Money Resources Maturity of process and systems Scale of economy

Canada and USA Approach the Regulatory Approval Process in Fundamentally Different Ways

USA Prescriptive approval processes Careful legal and scientific interpretation Removes discretionary and political authority by design Considers capacity of receiving environment and requires continuous improvement Successful in improving environment with continued development Involvement of private enterprise and public (true consultation, more active electorate)

Canada Big on policy, lacking in detailed regulation Allows for discretionary decision making Endless processes with few boundaries Final authority rests with elected officials Relies heavily on other jurisdictions (USA) Lacking mandatory statutes for addressing and continuously improving state of environment Consultation efforts lacking (reg. development) or poorly defined (applications)

Design of Regulatory System Leads to Differences in Practice and Behaviour Litigious US system results in: –Effective consultation process –Lengthy process for new regulations –Limited, even fear of, alternative compliance mechanisms Centralized control and lack of specificity in Canada leads to: –Poor consultation efforts –Quick implementation of policy –Creative environmental solutions –Lengthy approval processes

Major Permit Approval or Modification USA PSD or NSR Major source or modification defined in absolute terms Prescriptive method of analysis Sets the minimum for baseline data Study boundaries defined Objective decisions Administrator holds authority Canada No federal equivalent Major modification defined in relative terms* Every project different Allows or requires dubious baseline data Moving target for study boundaries Subjective decisions, not always bound by standards Minister holds authority

Canada vs. USA Emissions test vs Director’s request BACT analysis Modelling Assessment of Impacts Cumulative analysis? Demonstration of compliance Decision

Environmental Assessment USA State Environmental Quality Agency US EPA, NEPA and General Conformity Regulatory process begins at submission of EIA Review period set by regulation Decision lies with Administrator Canada Provincial Ministry of Environment CEAA (Federal Decision or Money) Regulatory process begins before EIA is prepared Regulatory time period not set by regulation Decision lies with Minister

Environmental Assessment Regulatory Process USA Standard set of terms of assessment Review focuses on validity of science Stakeholders vs Public Administrator’s decision bound by objective standards Canada New set of terms for each project Review focuses on accommodation of interests No definition of stakeholder Minister not bound by recommendation

Consultation (Reg. Development) USA All regulations are subject to public consultation Use the process to help define the regulation Actively seeks public and industry input Canada Public consultation not required by law Public information sessions and not consultation Not viewed as a tool for preparing regulation

Consultation/Notification (Approvals Process) USA Public Notification required by regulation Stakeholders/Interveners are defined Federal, State and APCD regulators make decisions Rule of Law in defining adequate notification Canada Public Notification required by regulation First Nations Consultation Undefined Stakeholders/Interveners First Nations have a quasi- regulatory role Precedent and demonstration of potential impact used to define adequate consultation/notification

How to Prepare for a Review USA Who do you know? Early and lengthy engagement Moving targets Personal engagement Canada What do you know? Restrictive schedule Fixed criteria for review Conduct analyses

What can be done now? Protocol for engagement –Criteria for review –Delegation of authority –Communication protocol Education –Formal courses/seminars –Observers Development of review criteria

Thank You