OP/BP 4.01 Environmental Assessment Zagreb, May 6-8 2009 Presenter: Natasa Vetma Presentation prepared by Ruxandra Floroiu.

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

1 Operational Strategy and Climate Change Operational Programs.
SEA & ETC Strategic Environmental Assessment and European Territorial Cooperation programmes Annual meeting with the Managing Authorities of the ETC programmes.
Training Workshop for Financial Intermediaries and Implementing Agencies Kiev, May 2011 Ruxandra Floroiu Senior Environmental Engineer, ECA Region, World.
Training Workshop for Financial Intermediaries and Implementing Agencies May 2011 Ruxandra Floroiu Senior Environmental Engineer, ECA Region, World Bank.
RELATIONSHIP between WB and NATIONAL REQUIREMENTS ENVIRONMENTAL ASSESSMENT Esra ARIKAN Environmental Specialist ECA Safeguard Training for PIUs, Ankara.
Environmental Auditing on the Yellow River Basin Liu Huibo from CNAO 5/7/2015 Penang, Malaysia.
USAID Africa Bureau EIA Procedures for Sub-Projects
Introduction to World Bank Safeguard Policies and Project Preparation
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
ENVIRONMENTAL MANAGEMENT PLAN
Potential for Belgian Companies in the Nepalese Environmental and Energy Sector Dr. S. Helsen Golden Jubilee Celebration Belgian-Nepal Brussels, Sept.
Results Monitoring – Second Sudan Consortium Government of National Unity, Northern States, Three areas. 1. Establishing core capacity  Basic financial.
Involuntary Resettlement 0P 4.12: Financial Intermediaries and Resettlement Planning Instruments.
04/2007 European Funds in Bulgaria Supported by the European Commission (DG ENV)
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Zagreb, May 6-8, 2009 Presenter: Natasa.
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies Johnson Appavoo Operations Analyst WB Safeguards.
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies.
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
Investing in the logistics necessary for Africa's Oil and Gas Industry.
Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov.
CEMEPE Skiathos island, June 2007 Business activities in the environmental sector in Greece: Current status and prospects E. Kondili 1 *, J. K. Kaldellis.
EIA Process, IEE, TOR Dr. Wesam Al Madhoun
Environmental Impact Assessment (EIA): Overview
BioCarbon Fund Projects and World Bank Safeguard Policies Jean-Roger Mercier September 12, 2005.
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
Robert Crooks ADFD/WB Project Preparation and Appraisal Workshop Abu Dhabi, April 2010 Environmental Assessment Category A and B Projects Compared.
Safeguards Training Ankara, Turkey May 17, 2011 Simplified Checklist EMP for Small Scale Civil Works – Introduction and Exercise.
TRAINING ON WORLD BANK SAFEGUARD POLICIES Agi Kiss, Regional Safeguards Coordinator, Europe and Central Asia Tashkent, November 2013 Introduction and Overview.
1 9/15/2015 Gogita Todradze National Statistics Office of Georgia Institutional Arrangements for Energy Statistics in Georgia.
USAID Environmental Procedures. EA Training Course Tellus Institute 2 USAID Procedures Overview  USAID environmental review requirements are:  A specific.
BORDER ENVIRONMENT COOPERATION COMMISSION Mitigating Impacts on Water Resources: Environmental Infrastructure Investment.
Integrating Environmental Management Plans into Project Operational Manuals Agi Kiss Safeguards Training Workshop, Chisinau, Oct 28-31, 2008.
National financing tools for local environmental infrastructure Emil Savov Deputy Executive Director National Association of Municipalities in Bulgaria.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
ECENA Exchange Programme First Plenary Meeting January, 2006 Zagreb, Croatia Update on strengthening the implementation and enforcement of EU environmental.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
Module 23 Environmental Safeguards Accreditation Training, January 21 – 25, 2013 Public Consultation.
ECENA First Plenary Meeting January, 2006 Zagreb, Republic of Croatia Forthcoming obligation related to implementation and enforcement of EU legislation.
ENVIRONMENTAL SCREENING AND CATEGORIZATION WB Safeguards workshop April-May 2012 Agi Kiss.
TOPIC 3.2 ENSURING ADEQUATED WATER RESOURCES AND STORAGE INFRASTRUCTURE TO MEET AGRICULTURAL, ENERGY AND URBAN NEEDS.
Safeguard Training Workshop Zagreb, Croatia May 7, 2009 Ruxandra Floroiu (Environmental Engineer)
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
ENVIRONMENTAL IMPACT ASSESSMENT: Managing Hydropower, Mining and Infrastructure Development Impacts on Natural Capital Iain Watson Senior Environmental.
Case Study – Preparation of an EMP Integrated Ecosystem Management of Sunshine-Moon River Basin (SMRB) Project.
BioCarbon Fund Projects and World Bank Safeguards Jean-Roger Mercier July 11, 2005.
Mini-Case / Quiz Topic: EA Categorization and EMP Requirements By Victor B. Loksha ECA Safeguards Team Europe and Central Asia Region The World Bank Discussion.
-Honesty-Cooperation-Responsibility-Respect  Established in 2003 by the Ministry of Economy.  Non – profit public institution.  Managing and administrating.
Intermediation of Small-Scale Carbon-Financed Clean Infrastructure Projects – The Development Bank of Southern Africa’s Experience and Prospects Rob.
ERT 319 Industrial Waste Treatment Semester /2013 Huzairy Hassan School of Bioprocess Engineering UniMAP.
Financial Intermediary Lending World Bank Safeguards Workshop May 2013.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
Involuntary Resettlement 0P 4.12 Principles and Objectives WB Safeguards Training Workshop Tbilisi, May 2013.
1 Third BERCEN Plenary Meeting Brussels, December 2004 Agenda item 13 Key achievements in environmental enforcement and compliance - discussion on.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Chisinau, October 28-31, 2008 Ruxandra Floroiu,
1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012.
0 National Inter-Ministerial Dialogue on Climate Change Cape Hotel Monrovia, Liberia June 25, 2009 Assessing and Developing Policy Options for Addressing.
TECHNOLOGY TRANSFER AND NATIONAL COMMUNICATIONS UNFCCC /UNDP EXPERT MEETING ON METHODOLOGIES FOR TECHONOLGY NEEDS ASSESSMENTS SEOUL, KOREA April.
Andres Liebenthal Sector Coordinator Environment and Social Development World Bank Office in Beijing The World Bank’s Environmental Assistance: From Policies.
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies Presenter: Johnson Appavoo Presentation prepared.
Strategic Environmental Assessment for the Operative Programmes Anita Gulam Ana Kovačević Ministry of Environmental and Nature Protection, Republic of.
Environmental Safeguards
CFAN 3 “Mid-Term Review and the Way Forward”
GCF’s Environmental and Social Safeguards
Relationship between World Bank and Romanian EA requirements
Strategic Environmental Assessment (SEA)
Day 1: Business Case and Concept for a Sound ESMS
Presentation transcript:

OP/BP 4.01 Environmental Assessment Zagreb, May Presenter: Natasa Vetma Presentation prepared by Ruxandra Floroiu

OP (Operational Policy) 4.01 – Policy Objectives To examine the potential environmental risks and benefits associated with Bank financed investments To support integration of environmental and social aspects of investments into the decision making process Consult affected people, involve NGOs, and provide opportunities for their participation in the environmental assessment aspects

OP (Operational Policy) 4.01 Possible impacts

OP (Operational Policy) 4.01 Principles cont’d EA is required by Bank-financed investments; The Borrower is responsible for carrying out the EA; The Bank advises the Borrower on Bank’s EA requirements; The Bank does not finance activities that will contravene national legislation or relevant international environmental agreements identified during EA

OP (Operational Policy) 4.01 Principles cont’d EA instruments used to meet OP 4.01: Environmental Impact Assessment (EIA) Regional or sectoral EA/SEA; Environmental Audit; Hazard or Risk Assessment; Environmental Management Plan /Checklist Environmental Framework

Environmental Screening in our countries – lists Based on: EU EIA (Directive 85/337/EEC as amended by 97/11/EC and 2003/35/EC SEA Directive (2001/42/EC) Several levels usually: A must list To be determined by relevant Ministry To be determined on regional or local government levels Some general measures in permits (location / construction / use

OP (Operational Policy) 4.01 Principles cont’d Environmental Screening Category A, B, C or FI Criteria for clasification include type, location, sensitivity, and scale of project as well as the nature and magnitude of potential impacts Projects with multiple components or sub- projects are categorized according to the component with the most serious potential impact

OP (Operational Policy) 4.01 Principles cont’d Category “A” -project likely to have significant irreversible adverse and sensitive environmental impacts; -impacts may affect an area larger than that subject to physical works; -EA compares project feasible alternatives and their related impacts (including “No action”); -EA recommends preventive/mitigation measures and their monitoring

OP (Operational Policy) 4.01 Category “A” examples large-scale conversion or degradation of natural habitats extraction, consumption, or conversion of substantial amounts of forest direct discharge of pollutants resulting in degradation of air, water or soil production, storage, use or disposal of hazardous materials and wastes risks associated with the proposed use of pesticides

OP (Operational Policy) 4.01 Category “A” examples cont’d Large-scale infrastructure: ports and harbor development, transport (rail, road and waterways), large- scale water resources management (river basin development, water transfer); dams and large reservoirs, hydropower and thermal power, extractive industries and oil and gas transport; Large-scale agriculture, irrigation, drainage and flood control, aquaculture; agro industries, and production forestry; Major urban projects involving housing development, water treatment, wastewater treatment plants, solid waste collection and disposal; Industrial pollution abatement, hazardous waste management, industrial estates, manufacture and large-scale use of pesticides; and Projects that, regardless of scale or type, would have severe adverse impacts on critical or otherwise valuable natural or cultural resources.

OP (Operational Policy) 4.01 Category “A” examples cont’d Plovdiza Dam, Bulgaria

OP (Operational Policy) 4.01 Category “A” examples cont’d Rijeka Port, Croatia

OP (Operational Policy) 4.01 Principles cont’d Category “B”  project has potential less adverse environmental impacts, mostly site-specific;  EA scope is narrower than the one for Category “A”;  EA examines the project negative and positive impacts  small scale irrigation and drainage projects  small-scale, relatively clean (gas or light diesel oil fired) thermal power plants, micro hydro power plants, and small sanitary landfills;  rehabilitating or maintaining an existing infrastructure (e.g., roads, power, transmission and irrigation networks)

OP (Operational Policy) 4.01 Category “B” examples cont’d Small-scale infrastructure projects: power transmission and distribution networks, rural electrification, mini (run of the river with no major water impoundments) or micro-hydropower projects, small-scale clean fuel fired thermal power plants, renewable energy (other than hydropower), energy efficiency and energy conservation, rural water supply and sanitation, road rehabilitation, maintenance and upgrading; telecommunications, etc.; Health care service delivery, HIV-AIDS, education (with limited expansion of existing schools/buildings), repair/rehabilitation of buildings when hazardous materials might be encountered (e.g., asbestos, stored pesticides); and Small-scale irrigation, drainage, agricultural and rural development projects, rural water supply and sanitation, watershed management and rehabilitation, and small-scale agro-industries, tourism (small-scale developments).

OP (Operational Policy) 4.01 Category “B” examples cont’d Rehabilitation of tertiary irrigation canal, Serbia

OP (Operational Policy) 4.01 Category “B” examples cont’d Hospital rehabilitation, Turkey

OP (Operational Policy) 4.01 Category “B” examples cont’d Wastewater Treatment Plant Rehabilitation

OP (Operational Policy) 4.01 Principles cont’d Category “C”  project with minimal or no adverse impact  technical assistance projects on institutional development, computerization, and training Education and Health projects not involving construction; Rehabilitation of a limited number of small buildings (e.g., schools or health clinics where health care waste is not an issue) – no changes in blueprint; and Institutional development, training and certain capacity building activities.

OP (Operational Policy) 4.01 Principles cont’d Category “FI” involve a financial intermediary; investments are done through sub-projects with different environmental impacts; the FI screens each subproject proposed for financing, and classifies it into any one of three categories: A, B or C; projects using community development driven approach and social funds; investments for which the final location / locations is / are not known at time of appraisal

OP (Operational Policy) 4.01 Principles cont’d Policy applies to emergency recovery projects processed under OP/BP 8.00 Rapid Response to Crises and EmergenciesOP/BP 8.00 the extent to which the emergency was affected by inappropriate environmental practices should be determined as part of the preparation of such projects; any necessary corrective measures be built into either the emergency project or a future lending operation

OP (Operational Policy) 4.01 Mitigation Measures What is incorrect in terms of environmental mitigation management?

OP (Operational Policy) 4.01 Mitigation Measures cont’d

OP (Operational Policy) 4.01 Responsibilities Project Preparation Borrower Familiar with Bank policy Understand the objective of the EA process Hire and manage EIA Consultants for EIA report preparation and disclosure Responsible for disclosure and consultation of draft EA Alocates costs for EA mitigation measures and EMP implementation Bank Ensures that Borrower fulfill Bank requirements with EA review; Responsible for screening and clasification of each investment/sub-project; Provides advice to Borrower on quality of EA report Guides the Borrower in proper EA preparation before project appraisal

OP (Operational Policy) 4.01 Responsibilities cont’d Borrower Compliance with measures agreed in EA; Implements the EMP; Reports the status of mitigation measures; Reports the findings of monitoring program Bank Carries out supervision missions; Ensures due diligence on implementation of Bank environmental policies; Provides advice to Borrower on enhancement of EMP implementation Conduct debriefing with borrower, review any noncompliance issues, agree on corrective actions Project Implementation

How to help yourselves Nominate a person in PIU for environmental matters that will be trained by the Bank and will closely work with the consultant Do not forget – this is your document – form it in the way that fits your institutional structure Use the project to educate your team and yourself Build on the national document: include water permits and EIA decisions into the document Remember that mitigation measures and monitoring can be part of the constructor contract and the supervision of the same can be part of the supervising engineers contract Include the monitoring cost in the budget and if responsibility of the contractor or supervising engineer in their contracts – require regular reporting