Update on Monitoring, Modeling & Data Issues Region 4 Air Pollution Control Agencies Fall 2012 Meeting Raleigh, NC October 23, 2102 Richard A. “Chet” Wayland,

Slides:



Advertisements
Similar presentations
Update on Regional Haze November 15, 2012 Michele Notarianni EPA Region 4 1.
Advertisements

Rider 8 Technical Workgroup Development. Introduction - Rider 8 Program for Ozone 74 th State Legislative Session authorized and budgeted to assist areas.
Status of 8-Hour Ozone NAAQS Program in Clark County Presentation to Air Quality Forum May 10, 2005.
Ongoing Model Updates and Related Activities for NAAQS Compliance 2012 Region 4 Modelers Workshop Region 4 Office, Atlanta, GA George M. Bridgers OAQPS-AQAD-Air.
Update: National Ambient Air Quality Standards Association of California Airports September 15, 2010 Phil DeVita.
What options do states have? What is Georgia planning to do? What are some of the other states doing? What are the possible implications to permit fees?
National Ambient Air Quality Standards for NO 2 and SO 2 – New Modeling Challenges August 4, 2011 Air & Waste Management Association – Southern Section.
How Ozone is Regulated under the Clean Air Act Darcy J. Anderson AZ Dept. of Environmental Quality.
1 An Update on EPA Attainment Modeling Guidance for the 8- Hour Ozone NAAQS Brian Timin EPA/OAQPS/EMAD/AQMG November 16, 2005.
Air Quality Beyond Ozone and PM2.5 Sheila Holman North Carolina Division of Air Quality 6 th Annual Unifour Air Quality Conference June 15, 2012.
National Ambient Air Quality Standards (NAAQS) and State Implementation Plan (SIP) Updates October 30, 2013 Lynorae Benjamin, Chief Regulatory Development.
Tribal Benefits from State Implementation Plan (SIP) Process Involvement Rosanne Sanchez New Mexico Environment Department Air Quality Bureau.
A&WMA Georgia Regulatory Update Conference Current State of the Air in GA Jac Capp, GA EPD, Branch Chief, Air Protection Branch April 16, 2013.
EPA Update- Bob Judge Maine Air Quality Monitoring Committee April 18, ) NAAQS schedule 2) Budget 3) Technical Systems Audit.
2015 FTIP/FSTIP Workshop Transportation Conformity Wade Hobbs FHWA CADO January 15, 2014.
IOWA Department of Natural Resources Air Quality Program Development Jim McGraw Environmental Program Supervisor  8 hr Ozone and PM2.5 NAAQS Implementation.
Elfego Felix Air Quality Analysis Office EPA Region 9 1-Hour NO 2 Near Roadway Monitoring April 12, 2011.
GA EPD Air Protection Branch AWMA Southern Section August 2015.
Ozone Regulation under the Clean Air Act Darcy J. Anderson AZ Dept. of Environmental Quality.
| Philadelphia | Atlanta | Houston | Washington DC SO 2 Data Requirements Rule – A Proactive Compliance Approach Mark Wenclawiak, CCM |
Oil and Gas Workgroup Summary October 21-23, 2009 Denver.
Timely Policy-Related Monitoring Issues 2013 NACAA Spring Meeting May 6-8, 2013 Richard A. “Chet” Wayland Air Quality Assessment Division U.S. EPA OAQPS.
Environmental Protection Division Air Quality Update Georgia EPD Jimmy Johnston Georgia Environmental Protection Division August 5, 2010.
1 MOBILE6 -Input and Modeling Guidance -SIP and Conformity Policy North American Vehicle Emission Control Conference Atlanta, April 4, 2001 Gary Dolce.
Recent Developments in Transportation Conformity Beverly Chenausky Multimodal Planning Division – Air Quality Breakout Session: Transportation Conformity/Air.
Proposed Revisions to Ambient Air Monitoring Regulations, and Proposed FY2007 Air Monitoring Guidance WESTAR Spring Business Meeting March 28, 2006.
Early Action Compacts Presented by Karen Borel EPA Region 4 March 25, 2003.
Inventory Needs and Legal Requirements Martin Johnson Emission Inventory Workshop Air Resources Board March 13, 2006.
Sound solutions delivered uncommonly well Understanding the Permitting Impacts of the Proposed Ozone NAAQS Pine Mountain, GA ♦ August 20, 2015 Courtney.
EPA’s DRAFT SIP and MODELING GUIDANCE Ian Cohen EPA Region 1 December 8, 2011.
National Ambient Air Quality Standards and Current Status of Air Quality Laura Boothe North Carolina Division of Air Quality MCIC Workshops March 2012.
EPA Chesapeake Bay Trading and Offsets Workplan June 1, 2012.
Designations for 24-Hour PM2.5 NAAQS: Overview and Guidance Amy Vasu PM2.5 Workshop June 20-21, 2007.
Final Clean Air Fine Particle Implementation Rule Briefing for NTAA EPA Office of Air Quality Planning and Standards April 17, 2007.
Ambient Monitoring Update NACAA Fall Meeting Chet Wayland, AQAD Division Director Office of Air Quality Planning and Standards 1 October 3-5, 2011 Cleveland,
1 Mississippi Air Quality Update Mississippi Dept. of Environmental Quality Air Division August 5, 2011.
WESTAR National Air Monitoring Steering Committee Update Spring Business Meeting 2010 Denver, CO Bruce Louks, Idaho DEQ.
1 Exceptional Events Rulemaking Proposal General Overview March 1, 2006 US EPA.
Proposed Revisions to the Guideline on Air Quality Models
Joelle Burleson Planning Section, Rules Development Branch Division of Air Quality Periodic Review and Expiration of Existing Rules per Regulatory Reform.
NAAQS and Criteria Pollutant Trends Update US EPA Region 10.
CALIFORNIA’S AIR TOXICS PROGRAM: IMPROVEMENTS TO ASSESS HEALTH RISK Update to the Air Resources Board July 24, 2014 California Environmental Protection.
ESEA Consolidated Monitoring Office of Federal Programs December 10, 2013.
1 Modeling Under PSD Air quality models (screening and refined) are used in various ways under the PSD program. Step 1: Significant Impact Analysis –Use.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Exceptional Events and Fire Policy Presented by Don Hodge, U.S. EPA Region 9 Interagency Air and Smoke Council meeting May 2, 2012 Disclaimer: Positions.
PM 2.5 Continuous FEMs; Update and Assessments For NESCAUM Monitoring Meeting April 29, 2011 Tim Hanley – US EPA, OAQPS 1.
SO 2 NAAQS Modeling MassCAIR Stakeholder Meeting December 13, 2011.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
1 The Exceptional Events Rule (EER) Overview Tom Link EPA – OAQPS Geographic Strategies Group Westar Meeting, San Francisco, February 25, 2009.
OAQPS Update WESTAR April 3,  On March 12, 2008, EPA significantly strengthened the National Ambient Air Quality Standards (NAAQS) for ground-level.
N EW Y ORK S TATE D EPARTMENT OF E NVIRONMENTAL C ONSERVATION Short Term Ambient Air Quality Standards and The Effect on Permitting Margaret Valis NESCAUM,
NAAQS Status in GA & PSD Inventory Update James W. Boylan Georgia EPD – Air Protection Branch Manager, Planning & Support Program AWMA Regulatory Update.
OAQPS Update NESCAUM PMC Meeting New London, CT May 30, 2007.
1 National Monitoring Committee Report Bruce Louks WESTAR Fall Meeting Portland, OR September 28, 2010.
New Ozone NAAQS Impacts: What Happens Next with a Lower O3 Standard? Nonattainment Designation and Industry’s Opportunity to Participate New Ozone NAAQS.
Air Modeling Updates 2015 Region 4 Grants/Planning Meeting May 19-21, 2015 Atlanta, Georgia 1.
Final Rulemaking: 25 Pa. Code Chapters 121 and 139 Measurement and Reporting of Condensable Particulate Matter Emissions Environmental Quality Board Meeting.
North Carolina Council on Developmental Disabilities
WESTAR Increment Recommendations
Preparing A Useful 5-Year Network Assessment
Department of Environmental Quality
Exceptional Events Rulemaking Proposal
SDWA Collaborative Efforts Overview
Exceptional and Natural Events Rulemaking
North Carolina Council on Developmental Disabilities
TCEQ AMBIENT Air Monitors in Corpus christi
Sulfur Dioxide 1-Hour NAAQS Implementation
Air Update, Georgia EPD Karen Hays Chief, Air Protection Branch
Water Quality Planning Division Monitoring & Assessment Section
Presentation transcript:

Update on Monitoring, Modeling & Data Issues Region 4 Air Pollution Control Agencies Fall 2012 Meeting Raleigh, NC October 23, 2102 Richard A. “Chet” Wayland, Director Air Quality Assessment Division

Monitoring CONO2O3SO2PM2.5Pb 2011 No changes at this time 0.5 TPY source monitors; NCore (urban) monitors, Airport study (all by 12/27/11) Area-wide sites in CBSA’s > 1M; RA40 sites PWEI sites 2014 First near-road site in CBSA’s > 1M 2015 Near-road monitors in CBSA’s > 2.5M Second near-road site: CBSA’s > 2.5M; CBSA’s with AADT segments > 250K Near-road monitors in CBSA’s > 1M Near-road monitors in CBSA’s > 1M First near-road site in CBSA’s > 500K Ambient Monitoring Deployment Schedule (Final or Proposed ) All deployment deadlines by January 1 unless otherwise noted

1 st Monitor Jan 2014; 2 nd Monitor Jan 2015 January 1, 2014 January 1, 2017 Near-road NO 2 Monitoring Proposed Deadlines for Near-road NO 2 Monitoring

CBSA Name 2010 PopulationNear-road NO 2 Proposed Monitoring Deadlines Atlanta-Sandy Springs-Marietta, GA Metro Area5,571,5831st Monitor - 1/1/2014; 2nd Monitor - 1/1/2015 Miami-Fort Lauderdale-Pompano Beach, FL Metro Area5,421,1711st Monitor - 1/1/2014; 2nd Monitor - 1/1/2015 Tampa-St. Petersburg-Clearwater, FL Metro Area2,768,3081st Monitor - 1/1/2014; 2nd Monitor - 1/1/2015 Orlando-Kissimmee-Sanford, FL Metro Area2,099,9771/1/2014 Charlotte-Gastonia-Rock Hill, NC-SC Metro Area1,792,9141/1/2014 Nashville-Davidson--Murfreesboro--Franklin, TN Metro Area1,599,4891/1/2014 Jacksonville, FL Metro Area1,341,0611/1/2014 Memphis, TN-MS-AR Metro Area1,296,0671/1/2014 Louisville/Jefferson County, KY-IN Metro Area1,263,9891/1/2014 Raleigh-Cary, NC Metro Area1,157,5681/1/2014 Birmingham-Hoover, AL Metro Area1,130,5781/1/2014 Columbia, SC Metro Area746,9791/1/2017 Greensboro-High Point, NC Metro Area721,4761/1/2017 Knoxville, TN Metro Area707,3791/1/2017 North Port-Bradenton-Sarasota, FL Metro Area697,9721/1/2017 Charleston-North Charleston-Summerville, SC Metro Area665,5031/1/2017 Greenville-Mauldin-Easley, SC Metro Area643,6221/1/2017 Cape Coral-Fort Myers, FL Metro Area611,6291/1/2017 Lakeland-Winter Haven, FL Metro Area598,4271/1/2017 Augusta-Richmond County, GA-SC Metro Area543,2391/1/2017 Jackson, MS Metro Area542,3411/1/2017 Palm Bay-Melbourne-Titusville, FL Metro Area540,6651/1/2017 Chattanooga, TN-GA Metro Area525,3571/1/2017 Durham-Chapel Hill, NC Metro Area506,7171/1/2017 Deltona-Daytona Beach-Ormond Beach, FL Metro Area500,2721/1/2017

10 th Conference on Air Quality Modeling Presentations posted immediately after conference: – Full transcription posted on June 21, 2012: – (Follow Links) Summary of Comments document including an overview of next steps and action items posted on October 5, 2012: – y_of_Comments-Revised_ pdfhttp:// y_of_Comments-Revised_ pdf Response to Comments document projected for delivery at the end of the calendar year U.S. Environmental Protection Agency10/17/2012 Modeling

10 th Conference on Air Quality Modeling Formal plan for updates to Appendix W: –Goal to have a draft plan available in early –Discussion at A&WMA specialty conference and the 2013 RSL Modelers’ Workshop in spring 2013 (Information on these meetings on next slide). –Revised draft plan based on engagement and feedback available soon thereafter. –Rulemaking proposal for language amendments and updates to Appendix W released for public comment and response in connection with the 11 th Conference on Air Quality Modeling (late 2014 / early 2015). 6U.S. Environmental Protection Agency10/17/2012

Upcoming Conferences / Workshops 2013 A&WMA Specialty Conference: –“Guideline on Air Quality Models: The Path Forward” –March 19-21, 2013, Sheraton Raleigh Hotel, Raleigh, NC. – content/uploads/2012/09/AQ_Models_CFA.pdf content/uploads/2012/09/AQ_Models_CFA.pdf 2013 Regional, State, and Local Modelers’ Workshop: –April 22-25, 2013, EPA’s Region 6 office in Dallas, TX. –Open (regulatory, industrial, consultant / contractor, environmental, public) participation day on Tuesday, April 23. –Workshop information will be posted on EPA’s SCRAM website in December 2012 or early January U.S. Environmental Protection Agency10/17/2012

AERMOD Modeling System Updates Updates based on comments received through the 10 th Modeling Conference along with other previously identified needs and ongoing feedback from the regulated modeling community. Near-term (updated release in early to mid November) : –Addition of a minimum wind speed threshold option and a few bug fixes to AERMET. –Interim addressing of "low wind speed" issue based on review of 10th Modeling Conference comments and published literature. “Beta option" with EPA evaluations demonstrating appropriateness for use in PSD permitting 8U.S. Environmental Protection Agency10/17/2012

AERMOD Modeling System Updates Near-term – Continued: –Considering updates incorporating EPA's Office of Research & Development (ORD) development of enhanced line-source characterization and algorithm. ORD delivered drafts to the Air Quality Modeling Group on 9/19/12. Longer-term: –Reviewing issues with building characterization and downwash algorithms, seeking ORD support for wind tunnel and related research. –Consider other necessary updates based on 10th Modeling Conference comments. 9U.S. Environmental Protection Agency10/17/2012

CALPUFF Modeling System Updates EPA’s regulatory CALPUFF version 5.8 Modeling System updated to include newer version of the post processing program, CALPOST, on August 27, 2012: –CALPOST version (level ) includes the "Method 8" IMPROVE equation revision per the Federal Land Managers' Air Quality Related Values Work Group (FLAG) revised October 2010 Phase 1 Report. – Updates to the regulatory CALPUFF version 5.8 to address known bug fixes –Met with Federal Land Managers and working to modify and test code updates for provision to TRC by the end of U.S. Environmental Protection Agency10/17/2012

SO2 NAAQS Activities Reviewing 09/2012 beta release of EPRI funded variable emissions tool, EMVAP, and related programs for consideration as part of future state attainment demonstrations in determining enforceable limits: –Planning discussions with EPRI immediately following the CMAS conference in October – Updating SO2 SIP modeling guidance for attainment demonstrations (late 2012 / early 2013) for use by areas to be designated nonattainment. 11U.S. Environmental Protection Agency10/17/2012

SO2 NAAQS Activities Review and comments on evaluations of AERMOD modeling of current SO2 sources, ongoing with updated reports by states and/or EPA presentations in future. –EPA review of recently reported AERMOD evaluations by IDEM have uncovered issues with representativeness of meteorological inputs and input errors that once addressed significantly improves model performance for 1-hour SO2 concentrations with model to monitored ratios of 1.15 to 1.3. –EPA will continue to pursue opportunities to evaluate AERMOD modeling system to ensure appropriate use for SO2 implementation by state and local agencies. 12U.S. Environmental Protection Agency10/17/2012

NO2 NAAQS Activities Released NO2 In-Stack Ratio (ISR) database on EPA’s SCRAM website on August 30, 2012: –Completed through small workgroup of EPA, state, and local agency modelers. – Continue working with API and their contractors on ARM2 as a modified NO2 Tier 2 method: –Reviewing documentation and evaluations, awaiting updates with specifics on how to formally implement within AERMOD. –Upon full receipt, EPA will independently verify evaluations and, as appropriate, write a guidance memorandum on how ARM2 may be used for permitting applications. 13U.S. Environmental Protection Agency10/17/2012

NO2 NAAQS Activities Engaging with stakeholders on evaluations of NO2 Tier 3 approaches of OLM and PVMRM. Continue to advocate for new field studies to allow more full model performance evaluation so these Tier 3 approaches could be characterized as refined methods as part of the planned regulatory update to Appendix W. –As discussed at 10 th Modeling Conference, EPA will need support from the community to fund, design and conduct such field studies so looking for partners for collaboration and/or willing to consult on external efforts. 14U.S. Environmental Protection Agency10/17/2012

PM2.5 NAAQS Activities As part of proposed PM2.5 NAAQS, completed technical memorandum demonstrating basis for surrogacy policy to address PSD requirements of potential secondary visibility index standards. Completing draft PM2.5 Permit Modeling Guidance for public release (mid/late-October) : –Comments will be accepted on the draft guidance document throughout the remainder of –Final PM2.5 Permit Modeling Guidance (early 2013) Planning discussions on SCICHEM and CMAQ-APT with EPRI and contractors (Sage Management & Environ) during CMAS conference in October U.S. Environmental Protection Agency10/17/2012

Data 2012 Ozone Data: Region 4 States follow the nation-wide trend

2012 generally produced more exceedances but not necessarily higher concentrations on peak days

Analysis of Ozone and Meteorology Atlanta, Charlotte, Chattanooga, Louisville, and Memphis June – July, 2012 Preliminary Analysis – Please Do Not Quote or Cite

From June 26 to July 1, 2012, high ozone was measured across the southeast During this time period, the region also experienced a record heat wave Analysis of meteorological data indicates that the following conditions were present during this period: –High temperature (several all-time high temperatures were recorded) –Low humidity –Low cloud cover (therefore high solar intensity) These conditions are all conducive to ozone formation Background

Annual Monitoring Network Plan Reviews

States are required to submit Network Plans to EPA by July 1 Prior to July 1:  EPA develops/updates tools that the agencies can use to evaluate their network to determine if it is meeting the minimum requirements.  EPA encourages questions throughout the drafting phase.  When provided drafts, EPA tries (if time allows) to review and provide comments on them. After July 1:  Once the final Network Plan is received EPA meets with the states via phone or in person regarding questions EPA has about the plans.  Approval letters are drafted by state contacts and are reviewed by section chief, branch chief and signed by the Division Director. EPA’s Network Plan Approval / Disapproval Process

Approval authority for Network Plans was delegated this year from the RA to the APTMD Director. Letters with many requested changes generally require more analysis and time. Some changes (e.g., shut downs) may require more analysis and time. EPA has 120 days to approve Network Plans. No formal appeal process is outlined in the regulations; however, EPA is willing to discuss at any time any issue and review any additional information that a state would like it to. EPA’s Network Plan Approval / Disapproval Process (cont.)

EPA Network Plan Reviews: Take Away Messages EPA will discuss adverse responses with you and/or your staff. Monitors and sites are evaluated on a case by case basis. Statistical test found in 40 CFR Part 58.14(c)(1) is applied to every SLAMS monitor, every year, using the previous 5 years of design values.

Proposing to discontinue the highest monitor in an area is rarely approved, even if it is a single pollutant site. If EPA finds the discontinuance of a monitor will not compromise data collection needed for implementation of a NAAQS, and if the other requirements in Appendix D continue to be met, then EPA is more likely to agree with closing a monitor (or site). EPA Network Plan Reviews: Take Away Messages (cont.)

Any monitor listed as SLAMS requires EPA approval for any change associated with that monitor. –Regardless of whether the monitor is in a MSA/CBSA or whether there are more than the federal minimally required monitors in a MSA/CBSA EPA Network Plan Reviews: Take Away Messages (cont.)

Budget constraints are not the best reason to cite for closing a monitor or site. If siting criteria and/or site access is an issue, we will be happy to complete a site evaluation with you. If a SLAMS monitor is not eligible for removal under any of the criteria listed in 40 CFR Part 58.14(c)(1) through (c)(5), and logistical problems beyond the state’s control make it impossible to continue operation, then the monitor may be moved to a nearby location with the same scale of representation. EPA Network Plan Reviews: Take Away Messages (cont.)