TPC–Energy TPC-Energy September 2008. TPC–Energy HP Dell Sun IBM Unisys AMD Microsoft Intel Oracle (No Vote) FSC (No Vote) TPC-Energy Membership.

Slides:



Advertisements
Similar presentations
Anthem Blue Cross and Blue Shield Hospital Assessment Fee [Insert image of members] January 2015.
Advertisements

January 2012 Monday Tuesday Wednesday Thursday Friday Sat/ Sun / /8 14/15 21/22 28/
JAVAPOSTM Java for POS Devices
N. K. SHETH & COMPANY1 THE CHAMBER OF TAX CONSUTANTS Welcomes all Participants to Seminar on e-Filing of Service Tax Returns Subject : E-Filing of Service.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSATURDAYSUNDAY WEEK WEEK WEEK WEEK WEEK CALENDAR PROJECT.
Employment and Training Administration DEPARTMENT OF LABOR ETA Reporting and Data Validation Updates Presenters: Wes Day Barbara Strother Greg Wilson ETA’s.
Maintaining Windows Server 2008 File Services
Step 6: Consult Fall/Winter Session Registration Instructions and Timetable ‘H’ indicates 0.5 credit ‘F’ section code indicates course takes place in First.
General Election Planning  Calendar and key events  Changes since 2005  Campaign finance for general election.
Research Support Services UCH Facility Use Approval Workflow Management Update Jennifer Holcomb.
Annie Griffith Infrastructure Programme Manager July 2007 UK Link Technology Refresh.
District District Administration District District Administration 1 Yap Boon Liang ACS/ALS Administration Manager designate HP:
Module 2 Part I Introduction To Windows Operating Systems Intro & History Introduction To Windows Operating Systems Intro & History.
Staff Updates Regional Technical Forum September 17, 2013.
University of Maryland Compiler-Assisted Binary Parsing Tugrul Ince PD Week – 27 March 2012.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
DWINSA 2007 Website. Website Purpose Allow states to track status of questionnaires Allow systems >100K or states to upload project data.
Objectives: Upgrade Siebel to a supported application Upgrade Oracle database to current version Deliver all existing user functionality with no degradation.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
Object-Oriented Software Engineering Using UNIX groups and CVS Estimated Time: minutes.
Doc.: IEEE /0395r1 Submission July 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
© 2008 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Introduction to HP Availability Manager.
The Collection Process in Medical Billing Francie Walters Jennifer Randall.
Guide to Linux Installation and Administration, 2e1 Chapter 10 Managing System Resources.
Lead from the front Texas Nodal 1 Registration Market Call Apr 10, 2009.
1 Changes to electoral law Bill 42 – an overview.
Meet and Confer Rule 26(f) of the Federal Rules of Civil Procedure states that “parties must confer as soon as practicable - and in any event at least.
Marcelo R.N. Mendes. What is FINCoS? A Java-based set of tools for data generation, load submission, and performance measurement of event processing systems;
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
Objectives: Upgrade Siebel to a supported application Upgrade to Oracle 9i database Deliver all existing user functionality with no degradation in performance.
Targets for project progress 2015: graduation review – clear documentation and PoC implementation specify general framework and API requirements gap analysis.
Icecube DOM Main Board Status and Development Plans R. Minor October 2003.
PR50121_07 Retail Business Processes (RBP) Project Update Retail Market Subcommittee November 8, 2006 Adam D. Martinez Mgr, Market Operations DPO.
Module 2 Part I Introduction To Windows Operating Systems Intro & History Introduction To Windows Operating Systems Intro & History.
TGDC Meeting, July 2011 Voluntary Voting System Guidelines Roadmap Nelson Hastings, Ph.D. Technical Project Leader for Voting Standards, ITL
Doc.: IEEE /0252r1 Submission May 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Software Development and Deployment PDS Management Council Face-to-Face Los Angeles, California August 26-27, 2014 Sean Hardman.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
TX SET Update to RMS Wednesday, November 7, 2007.
Objectives: Upgrade Siebel to a supported application Upgrade Oracle database to current version Deliver all existing user functionality with no degradation.
Software Development and Deployment PDS Management Council Face-to-Face Berkeley, California November 18-19, 2014 Sean Hardman.
Doc.: IEEE /0792r0 Submission July 2008 Adrian Stephens, Intel CorporationSlide TGn Editor Report July 2008 Date: Authors:
DEX Publication Project OASIS PLCS TC Face to Face meeting 10 March 2008 Trine Hansen.
Marcelo R.N. Mendes. What is FINCoS? A Java-based set of tools for data generation, load submission, and performance measurement of event processing systems;
Generate Reports. Generate Result Slips Assessment Report End of Year Report Year 7 & Year 8 SBA Report Year 8 Final Report Year 7 and Year 8 Reporting.
CMPE 226 Database Systems April 19 Class Meeting Department of Computer Engineering San Jose State University Spring 2016 Instructor: Ron Mak
The September 2011 MLS statistics will be released on Tuesday morning, and here are some quick takeaways: September sales of single-family homes climbed.
T Project Review Sotanorsu I2 Iteration
LEARNING AGREEMENT. This is the result of the agreement between the outgoing student and his/her academic tutor at the University of Murcia on the subjects.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting September 12, 2011.
PearsonAccess EOC Training
Code Governance Review UNC Modification Proposals
UBL Naming and Design Rules Subcommittee
IEEE 1914 NGFI IEEE RoE TF Opening Report
Time Revision.
At the polls on Election Day
October 15 October 30 by 5:00 p.m. November 3 by 5:00 p.m. November 6
NEPSI Online Reporting System
Logo Calendar – January 2012 TO DO LIST 01/04/2012 Example TO DO LIST
SPR&I Regional Training
Revised engagement approach for draft GTAC
Geo Units Formation Dates In China
April May April May June July July June August Sept August
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
TGn Editor Report Sept 2008 Date: Authors:
Joint Office UNC Elections
Joint Office UNC Elections
RCM TIG Agenda Date: June 2019 Author(s): Name Affiliation
Joint Office UNC Elections
Presentation transcript:

TPC–Energy TPC-Energy September 2008

TPC–Energy HP Dell Sun IBM Unisys AMD Microsoft Intel Oracle (No Vote) FSC (No Vote) TPC-Energy Membership

TPC–Energy Meetings Had 10 Conference Calls since Germany GC Meeting Had 3 day Face-to-Face Meeting in Houston 8 Active companies out of 10 Members

TPC–Energy Previous TPC-Energy Schedule April 14 face to face: 1.Target all sections to be 50% ready 2.Over 50% of Spec wording is formulated (Version 0.2.0) 3.Still difficult subject matter to be worked. June 2 face to face: 1.Target all sections to be 85% ready 2.Assess the timeline for going to public review 3.Many details to fill in during the next several months August – Additional face-to-face meeting: 1.Denver or Houston August 5 – 9 (Tues – Friday) 2.Tues – Thurs Spec Work 3.If Houston - Friday 8/9 – Lab Testing of code on all TPC Benchmarks September 8 face to face: Go to Public review November 17 face to face: Go to mail ballot – February 2009 Mail Ballot if slip from November.

TPC–Energy Current TPC-Energy Schedule September face to face: 1.Target all sections to be 80% ready 2.Over 60% of Spec wording is formulated (Version 0.4.2) 3.Almost all difficult subject matter has been worked. November face to face: 1.Target all specifications sections to be 99% ready 2.Assess the timeline for going to public review 3.Many details to fill in during the next several months 4.All necessary code functional February 2009 face to face: Go to Public review April 2009 face to face: Go to mail ballot –

TPC–Energy Status as of September 11, 2008 SPEC – TPC Agreement in place to use the SPEC Power and Temperature Daemon (PTD) Still working on SPEC – TPC NDA Energy Specification –Reorganized Clause Sections –Reformatted most of wording –List of unresolved issues has no major issues remaining Coding in beginning stages

TPC–Energy Scheduled Meetings ConCalls – Tuesdays 1:00PM PDT –Sept 22 – 1:00 PM PDT –Sept 29 – 1:00 PM PDT –Oct 6 – 1:00 PM PDT –Oct 13 – 1:00 PM PDT –Oct 20 – 1:00 PM PDT –Oct 27 – 1:00 PM PDT –Nov 3 – 1:00 PM PDT –Nov 10 – 1:00 PM PDT November 2008 – General Council –Nov 17 – Dana Point 9:00AM – 5:00PM –Nov 18 – Dana Point 9:00AM – 5:00PM (May need to end earlier for TAB) –Nov 19 – Dana Point 9:00AM – 3:00PM (If PR does not meet will go to 5:00PM)

TPC–Energy Software Design Delivering 4 binaries: EMF – Energy Measurement Facilitator Does not drive the benchmark. Be independent of benchmark. How to pick-up benchmark events. Time sync with benchmark driver – Mark this time from the benchmark driver. Register an event. Mark this time with “string” Single instance Create separate thread for display? PTD Manager Need to define command set to PTD Connect to PTD – one per PTD Read current measurement (poll) Call back… for display (send measurements at a defined period) Local logging –store in binary format for small file size. Time Sync PTD SPEC version will likely require some modifications Utilities Report Generator Standardize output Use in FDR Uploaded zip file

TPC–Energy Benchmark Status Report The TPC Energy sub-committee has developed methodology to add energy metrics to all the existing TPC Benchmarks. This will utilize the existing TPC benchmarks as the workload and during the running of the benchmarks, measure the energy being consumed by the System Under Test. The new metrics will be of the form: Watts/Performance. The TPC-Energy Specification wording is approximately 60% complete. There remains significant work in developing procedures and measurement methodologies which require testing prior to finalization of the specification. The TPC-Energy subcommittee is developing code which will interface to the power analyzers and temperature probes.. This code will collect the energy and temperature data of the components of the System Under Test and create a uniform log for reporting the results. The TPC will use the SPEC consortium Power and Temperature Daemon code as part of this benchmark. These programs will be available to Test Sponsors who will run the TPC-Energy option of the TPC Benchmarks.