Platform positioning during MDT construction Tool for the platform positioning Ph. Schune J.-Ch. Barrière P RAXIAL A LIGNMENT S YSTEM (barrel) positioning.

Slides:



Advertisements
Similar presentations
Alignment systems for GlueX GlueX Collaboration Meeting Bloomington, Indiana May 20-22, 2004 Courtesy of Dimos Sampsonidis, Aristotle University of Thessaloniki.
Advertisements

TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
Marcel Vreeswijk (NIKHEF) Assembly Station - general Introduction Tube placing + Gluing + test Summary: Status & Plans The.
BML chamber assembly Maria Curatolo LNF/INFN. Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Granite Table Granite table (on.
sTGC for ATLAS Small Wheel upgrade
Projective platforms gluing for ATLAS chambers J.-Ch. Barrière, V. Gautard, P. Ponsot, Y. Reinert, Ph. Schune for the Saclay muon hardware group CEA Saclay.
Marcel Vreeswijk (NIKHEF) The NIKHEF Muon Mission Drift tube wiring Chamber assembly X-ray scan of BOL-0 at CERN Status and Plans The Making of ATLAS Muon.
DESY Zeuthen 1 Precision drift chambers (MDT) for ATLAS muon system. G.Chelkov JINR (Dubna) DESY Zeuthen 10 September 2002.
ATLAS BIS MDT wiring facility D. Fassouliotis P. Ioannou C. Kourkoumelis V. Pancheluga D. Pappas E. Stefanidis V. Birioukov (engineer from Protvino) UNIVERSITY.
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
University of Athens ATLAS BIS MDT assembly HEP 2001 Presented by Heraklion, 6-8 April 2001 D. Fassouliotis D. Fassouliotis.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Pre-alignment solutions applied to girders 1/19 Sylvain GRIFFET, 06/07/2010.
Setup of laser tracker on DX side NOTE: X axis along M1s centers, towards SX Z axis along M1-M2 centers, towards M2.
Marcel Vreeswijk (NIKHEF) The Assembly of ATLAS Muon 2m 5m5m NIKHEF Muon Mission: 96 Barrel Outer Large (BOL) chambers Tube Production.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
PACMAN Workshop OUTLINE Introduction ESR 3.1 Challenges - Stability budget and Precision Mechanical Design - Precision Assembly of MBQ and BPM - System.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
The barrel reference system1 THE BARREL REFERENCE SYSTEM C.Guyot (Saclay) Goal: Provide a geometrical survey of the whole barrel muon spectrometer.
GE alignment- status, proposal N. Béni, Z.Szillási (ATOMKI, Debrecen, HU) G. Bencze, G. Endrőczi (Wigner RCP, Budapest, HU) GMM meeting 1.
The RASNIK Alignment System. Particle Physics CERN, Geneva, Swiss.
LASER AND ADVANCES IN METROLOGY
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
ATLAS Pixel Detector Discussion of Tolerances November 12, 1998 Pixel Mechanics D. Bintinger, LBNL E. Anderssen, LBNL/CERN.
Basic concept The NSW chambers are assemblies of Micromegas monolayers, TGC’s and spacer/stiffeners. In order to simplify the assembly procedures we propose.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Projective Praxial =Proximity+Axial In-plane bil bml bol Muon Chamber Alignment (Saclay) goal: absolute 30um on sagitta sofar: relative movements (better.
Freiburg 7/07/20001 laser beam lens CCD (long arm) screen + grid CCD (short arm) glass plates at  45° STAMP : Saclay Telescope for the Alignment of Many.
Marcel Vreeswijk (NIKHEF) AGENDA Xray tomograph -BOL0 results (Martin) BOL0 and BOL2 Features (Graziano) Discussion (All) Features and Mysteries of BOL.
BARREL ALIGNMENT PLATFORM POSITIONING Goal: Positioning of the platforms at their nominal position on the MDT chambers (No position measurement in a database).
The Mask-Sphere, M-S Is calibrated by setting it into the conical cup and recording the mask position with a fixed C- CCD. The M-S is rotated 4x by 90°
1998 IEEE Nuclear Science Symposium, Toronto, Canada High-Precision, Large-Volume Particle Tracking U. Bratzler* Outline (Example: Muon Tracking in ATLAS)
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Muon-raying the ATLAS Detector
Status of RICH mechanical design at PNPI E.Vznuzdaev for PNPI group: V.Dobyrn, A.Khanzadeev, E.Kormin, V.Lebedev, N.Miftakhov, V.Polyakov, V.Samsonov,
26/10/20051 BARREL ALIGNMENT: LIST OF PARAMETERS REQUIRED FOR THE POSITIONING AND THE CALIBRATION OF THE VARIOUS ELEMENTS Praxial system: - Platforms -
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
Analyzing Praxial Platform Positions on MDT Barrel Chambers Using X-Ray Tomograph Measurements Chris Hayward Advisor: Silvia Schuh August 14, 2003 UM CERN.
Precision Drift Chambers for the ATLAS Muon Spectrometer
November 11 SESAPS 2006 Samir Guragain 1 Calibration, Installation & Commissioning of Sensors for the Alignment of Muon Endcap Chambers in the CMS Experiment.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Calibration and production of PRAXIAL (*) sensors for the ATLAS muon spectrometer Optical Metrology - SPIE Optical Measurement Systems for Industrial Inspection.
Simon Calibration Instructions Main Antenna Jig Peter Karlsson V2.
THE H8 TEST STAND Conceptual Design Mechanical supports Status of preparation Project schedule 1 (Brandeis, CERN, MPI, Seattle - presented by Sandro Palestini)
1 ATLAS Muon Spectrometer Alignment LHC Days in Split, 5-9 Oct J.Krstic, M.Milosavljevic Institute of Physics, Belgrade D.Fassouliotis,C.Kourkoumelis,
VEA’s proposal of automated assembly system WP6 meeting, 16/01/14.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
Marcel Vreeswijk (NIKHEF) The NIKHEF Muon Mission Chamber assembly Assembly QA Assembly QC Summary, Status and Plans The Assembly of ATLAS Muon chambers.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
HIE-ISOLDE Workshop: The Technical Aspects – Alignment and Monitoring System – November 28 th 2013 G. Kautzmann, J-C. Gayde, Y. Kadi, F. Klumb, S. Rokopanos,
Fork Calibration Barrel Muon Alignment 9 April 2003, Z. Szillási Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 1 Calibration.
TE-MSC. 07/04/2016 Jose Ferradas TE-MSC-MDT Alejandro Carlon TE-MSC-MDT Juan Carlos Perez TE-MSC-MDT On behalf to MSC-MDT section and Coil working group.
Pierre-François Giraud, Muon Alignment Meeting1 Status of the barrel alignment system Pierre-François Giraud CERN.
Lab 2 Alignment.
Update on Pavia MM mechanical prototype
Stave 4008 Z rubyballs coordinates
Recent developments on micro-triangulation
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
nSW Alignment Installation
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
LumiCal mechanical design, integration with LDC and laser alignment
Production & QA of BOL chambers
Overview of the Frascati Production Facilities
Simplified Procedure Draft
Presentation transcript:

Platform positioning during MDT construction Tool for the platform positioning Ph. Schune J.-Ch. Barrière P RAXIAL A LIGNMENT S YSTEM (barrel) positioning calibration calibration of P RAXIAL part A TLAS Align. PDR Ph. Schune (Saclay) QA/QC: in production site and at the CERN X-ray tomograph calibration of A XIAL part conclusion P RAXIAL active optical elements 1

Principle : The P RAXIAL system is used to unite a layer of chambers (about 6 MDT) to form a single “rigid” layer. It is composed by two systems. The precision on the positioning of both systems are: ±25  m (y,z), ±200  m (x), < 80  rad (x,z), ±200  rad (y). Goal (for the positioning) : Positioning of the (four) platforms at their nominal position on the MDT chambers (no position measurement in a database). The calibration of the active optical elements is done elsewhere Method : Use four precisely adjusted template squares (precision < 20  m) to hold the platform at their nominal position, during the glue curing, w.r.t. the end plugs (2 pts) and the outer tube surface (or on the jig, BOS only) at the level of the first comb. P RAXIAL A LIGNMENT S YSTEM Tool for the platform positioning P RAXIAL Platform Template squares calibration (CMM) A TLAS Align. PDR Ph. Schune (Saclay)  J.-Ch.B., C.G. and H.v.d.G. presentations red = proj. blue = praxial green= ref. 2 Y Z Atlas axis X 3D view.

The platform is glued at its nominal position during the glue curing of the first MDT layer. A TLAS Align. PDR Ph. Schune (Saclay) Flat surface on MDT end plugs Half sphere on MDT end plugs 6 adjustable (on CMM) balls for the platform positioning (  < 20  m) Half sphere on the MDT tube outer surface (or on the jig, BOS) Template square P RAXIAL A LIGNMENT S YSTEM Platform positioning during MDT construction P RAXIAL platform template square with its precise positioning sphere end-plug of the tube (circularity:  < 20  m) jig glue Gluing of the platform (detail) 3

A TLAS Align. PDR Ph. Schune (Saclay) P RAXIAL A LIGNMENT S YSTEM QA/QC: in production site and at the C ERN X-ray tomograph Goal: Control the chamber mechanical deformation (sag  angular displacement of the platform) coming from the assembly of the different layer (e.g. BIS-Thessaloniki). Method: Use four control tower (one on each platform) each equipped with 4 LED and 2 CCD (  two crossed BCAM). The towers calibrate (relative) platform position:  x,  y and  z. Special software distributed to all labs. mrad Rotation angle vs step (BIS-0): sag. of the chamber Calibration bench of the tools (in each lab., if possible) CCD image of the 2 LED from the opposite tower:  ~ 0.5 pixel < 100  rad  J.B. Control tower in position distance adjusted to ± 2 mm CCD LEDs marble table Platform angle ~ (X/Y(pixel) - X 0 /Y 0 ) * pixel_size / f 4

A TLAS Align. PDR Ph. Schune (Saclay) P RAXIAL A LIGNMENT S YSTEM QA/QC: in production site and at the C ERN X-ray tomograph 4 W/Au wires (Ø = 100  m) microscope spheres for the positioning 2D table support only needed during the calibration X Z Y After the calibration (“optical CMM”) of the four masks, we know the wires and spheres position with the following precision: wires (4):  = 100  m  2  m straightness < 5  m positioning spheres (6):  = 8 mm  5  m RO side MASK 3 MASK 1 MASK 6MASK 2 BML chamber HV side Optical CMM Chamber on tomograph (top view) Goal: Verify the final platform position w.r.t. to MDT wires. Method: Use four masks (one on each platform) equipped with wires. The masks wires are precisely located w.r.t. to the positioning spheres (< 10  m). Four X-ray tomo scans ( ) are needed for measuring the platforms position. These masks calibrate absolute platforms position:  x,  y,  z and  y,  z. Mask with its 4 wires 5

Y of the mask wires w.r.t. the platform: ~ 5  m  < 11  m Z of the mask wires w.r.t. the platform: < 1  m  < 6  m These measurements include errors from: repositioning, X-tomo measurement error and uncertainty from local frame (  m) (  m) P RAXIAL A LIGNMENT S YSTEM QA/QC with the X-ray tomograph (with BML-0) top view B M L Z X Atlas axis A TLAS Align. PDR Ph. Schune (Saclay) 6 exchange of masks position Difficulty in interpreting X-tomo results but more generally difficulty of the alignment: muons are measured using the wires but alignment elements are positioned on the tubes.  we have to understand the tube sag w.r.t. wire sag with a precision < 30  m in all conditions:  position in the exp., flexo, T gradient… (see A TLAS -TDR) platform 2) C ERN X-tomo or A TLAS conditions: 1) Lab. conditions: (marble table, T=cte) X-tomo results (sag. compensation up to 600  m): Y sag. comp. -Y no sag. comp ~ 40  m marble table tube Y

P RAXIAL A LIGNMENT S YSTEM Positioning precision Positioning tool (CMM):  < 20  m Platform quality + repeatability of the positioning:  ~ 10  m (special tools will be designed/made to help for the positioning) End-plug circularity:  < 20  m Mask for X-tomo (absolute):  trans.  < 10  m and  rot.  < 100  rad (first complete measurement: BML-1, April 2001)  optical sensor calibration  J.-Ch. B. presentation Positioning Control Control tower (relative angular movement):  < 100  rad A TLAS Align. PDR Ph. Schune (Saclay) 7