COBRA Magnet 2002200320042005 Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.

Slides:



Advertisements
Similar presentations
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
Advertisements

P.-R. KettleMEG-Review February MEG Beam Line Studies  E5 Z-Branch NOW !!! NOW !!!
Line Efficiency     Percentage Month Today’s Date
A. Baldini PSI July 04 General Introduction Work done in the past 4 months presented in the individual sub-detectors talks: highlights Construction is.
1 Timescales Construction LCR MICE Beam Monitoring counters + DAQ My understanding Jan 07 Feb 07 Mar 07 Apr 07 May 07 Jun 07 Jul 07 Aug 07 Sep 07 ISIS.
Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Timing Counter july 2004.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
A. Baldini PSI 18 July 2007 MEG Overview Cobra (W. Ootani) LXe calorimeter (S. Mihara) Calibrations (G. Signorelli) Drift Chambers (J. Egger) Timing counter.
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
Satoshi Mihara ICEPP, Univ. of Tokyo Feb MEG Review Meeting 1 CEX beam test at piE1 Satoshi Mihara.
Liquid Xenon Photon Detector Feb MEG Review Meeting Liquid Xenon Detector Part I CEX beam test at piE1 Oct-Dec/03 –Hardware operation status –Analysis.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
Timing Counter Report of Feb. 14 th, 2007 P.W. Cattaneo.
MEG DC (report June 04) DC report june_04,J.E. a)Foil stability and quench related problems b)How to get more stability c)Frame design d)Measurement of.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
The MEG Experiment T. Mori for the MEG Collaboration.
Update on the GRINCH Detector SBS meeting, 21 Oct 2015 T. Averett, W&M JLab, NC A&T, JMU, Glasgow Timing-based gas Cherenkov detector PMT array-510 tubes.
Overview of the experiment Collaboration (about 30 physicists at this meeting) Budget Realistic schedule and general status (few words) of each sub-detector.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Xenon Detector Installation schedule Satoshi MIHARA.
1 COBRA Magnet Status W.Ootani MEG Experiment Review Meeting, Jul W.Ootani MEG Experiment Review Meeting, Jul
Xenon Delivery Japan 1 MCHF 575 kCHF granted Additional grant 656 kCHF Last 50l subject to negotiation.
Preparations for Run 6 Don Lynch February 13, 2006.
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
g beam test of the Liquid Xe calorimeter for the MEG experiment
Jan 2016 Solar Lunar Data.

ITI Portfolio Plan Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Current Date Visibility of ITI Projects ITI Projects.
Liquid Xenon Detector for the MEG Experiment
Q1 Jan Feb Mar ENTER TEXT HERE Notes
CLAS12 First Experiment Workshop Report

Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall
Preparation of the CLAS12 First Experiment Status and Time-Line

Laboratory Directed Research and Development (LDRD) Proposal
2017 Jan Sun Mon Tue Wed Thu Fri Sat

Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE

Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16

Step 3 Step 2 Step 1 Put your text here Put your text here
Jan Sun Mon Tue Wed Thu Fri Sat

Electricity Cost and Use – FY 2016 and FY 2017
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
MEG Summary T. Mori for MEG Collaboration February 9, 2005.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE


Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Calice Tile-HCal and Tail-catcher/Muon Tracker
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun

Globus-M2 will be constructed by the end of 2015
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Presentation transcript:

COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device Final field mapping during shutdown DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device Final field mapping during shutdown

Beam Test Milestone AssemblyDesignManufactoring Studies Solenoid BTS Triplet I + II Target Part 1 New Separator Beam Line Commissioning Sep+BTS+COBRACOBRA+Target GottaPrak. Pi beam? Studies Solenoid BTS Triplet I + II Target Part 1 New Separator Beam Line Commissioning GottaPrak.Gotta ? Pi beam?

Test Milestone AssemblyDesignManufacturing Drift Chamber Full Prototype Charge division & Cosmics Foil Medium Prototype Full Detector (18 DC) outside inside COBRA Full Size Prototype Full Prototype Charge division & Cosmics Medium Prototype Full Detector (18 DC) outside inside COBRA Inside COBRA Full Size Prototype ??? Construction

COBRA Test Timing Counter Test Milestone AssemblyDesignManufactoring Beam Test Design PMT EvaluationPMT procur. Procur & Manuf. APD EvaluationTestAPD procur. Mechanical matching BG test Full installation APD procur. New APDs COBRA TestBeam Test Design PMT EvaluationPMT procur. Procur & Manuf. APD EvaluationTestAPD procur. Mechanical matching BG test Full installation APD procur. New APDs Frascati

Photon Detector

Test Milestone AssemblyDesignManufacturing Large PrototypeBeam Test Cryostat Vessel PMT Refrigerator Liq. Purification Assembly Test Engineering runs Neutron Shield? Large PrototypeBeam Test Cryostat Vessel PMT Refrigerator Liq. Purification Assembly Test Engineering runs Neutron Shield Tests

Test Milestone AssemblyDesignManufactoring Trigger Full System Prototype Board Final Prototype part. inst. full. inst. Prototype Board Final Prototype partial installation full install. Full system 1st lot of components ordered 2nd lot of components

DRS (DAQ) Test Milestone AssemblyDesignManufactoring DRS2 test board DRS3 VME boards 400 chn 3000 chn Tests DRS1DRS2 Full System DRS2 DRS2 test board DRS3 VME boards 400 chn 1600 chn 3000 chn DRS1 Full System installation DRS2 production 1600 chn

Test Milestone AssemblyDesignManufactoring Offline Framework Prototype Minifarm Computing Model Data Challenge Farm

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec PMT Liquid-phase purification test Xenon supply system PMT install + Studies Vacuum/pressure Cooling Liquefaction Manpower Photon Detector

Manpower summary [FTE incl. students and some engineers] Item Cobra 11 Beamline + Target Drift Chamber Timing Counter Photon Detector 15 Trigger DAQ MC Offline 

Xenon Delivery Japan 1 MCHF 300 kCHF missing 265 kCHF Unexpected VAT/import tax (10%) Switching from $ to € (30%) New Russian export regulations Price increases from 30 % of WM price to 50%

PSI Budget ’03 – ’05 kCHF Granted Left R & D annual basis Xenon DC Beamline Electronics Infrastructure OK -500 ~OK

Running costs estimate kCHF / year Beam Electr. Power: 240 LN2 / LH2 Central computing Chamber gas: 5 Data storage: 38 *) (tapes) Repairs, extensions… PSI General Budget Laboratory Budget ~100 *) 200 GB LTO tape for 75 CHF

2004 JFMAMJJASOND Beam Time MEG Prac MEGGotta COBRA Calibration (Wed) Beam Line Commiss. Part 1 Platf. Drift Chamber Proto type Timing Counter Test Mechan. Matching LPT Neutr. BG PM + Src Inst Pi- Beam Test Liq. Purif. Full Calorimeter Trigger DAQ Test

JFMAMJJASONDJFMA Beam Time ShutdownMEG Shutdown COBRA Tests Platf. Field Map Beam Line BTS Test Commiss. Part 2 Target Full Test Drift Chamber Proto Inst Full Installation Timing Counter BG Test TstI nst Full Installation LPT PMT testing + calibration Full Calorimeter Cryogenics Installation Assembly + Test Trigger Inst DAQ DC Electr. Inst