Report from Superintendent Board of Education Meeting January 15, 2014.

Slides:



Advertisements
Similar presentations
Fullerton College Bond Fund Projects Update Fullerton College Athletics Project Scope Overview Schedule Parking.
Advertisements

Cost Total cost is up to $8,645,000 $500,000 from Capital Reserve Fund $8.145 million bond for the balance.
Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
2013 Budgets Lower Paxton Township
Date ▪ Educational Program - Update Automotive Options ▪ Practice Fields - Additional Options Agenda – Rebuild Stafford High School.
Tuesday, February 1,  Both are extremely important!  Both allow flexibility to plan for our growing student population.
Bond Proposal May 12,  I.E.Clark Fine Arts Center – Problem – Consistent separation of walls and foundation over the years. Summary – The Fine.
COUNCIL WORKSESSION DECEMBER 11, AGENDA a.PROJECT SUMMARY RECAP. a.SCOPE. b.BUDGET. b.FINANCING UPDATE. a..5% GENERAL SALES & USE TAX. b.1.5% LODGING,
Proposed Budget Presentation APRIL 21, 2015.
Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,
Board of County Commissioners 9/27/2011.  Minor Amendment to Existing Special Use Permit for Oak Hall Private School to modify conditions relating to.
APRIL 2, Superintendent proposes to consider construction of new administration building to Board May 2010 Board gives approval to begin search.
Capital Project 2016 Members of the Bloomfield Facilities Committee Frank Young – BOE Jim Spelman – BOE Pam Nakoski - BOE (at large) Ian Caspersson – Community.
2007 & 2012 BOND PROGRAM UPDATES San Antonio Military Engineers Market Research Conference Presented by: Mike Frisbie, P.E., City Engineer & CIMS Director.
Debt Management Overview Presentation to Board of Estimates August 29, 2011.
Independent Review of FY 2008 Proposed Rates D.C. Water and Sewer Authority Public Hearing June 13, 2007.
Client Logo Panther Creek Pool October 4, Annual Meeting President’s Report.
Faculty Meeting Monday, April 4, Deferred Maintenance.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Facilities Steering Committee Meeting 6 Welcome!
1. Maintenance Alignment with District ‘s Mission and Board and Superintendent’s Goal 2. Impacts of recent budget reductions 3. Review Energy Grant 4.
SAM RAYBURN INDEPENDENT SCHOOL DISTRICT B OND E LECTION I NFORMATION 9363 East FM 273 Ivanhoe, Tx (903)
Fiscal Year 2016 Cape Elizabeth Municipal Budget.
Presented by: Servus Place – A Plan for the Future Report on Public Consultation and Revised Plans Diane Enger Director Servus Credit Union Place March.
Mott Community College Board of Trustees Committee of the Whole Meeting June 27, 2011 BUDGET RESOLUTIONS.
Transportation Asset Management PM Peer Exchange Section 3 Overview: Additional Asset Management Classes Connie Sorrell Chief of System Operations.
FY12 and FY13 Budget Development Special Board Meeting Alachua County Office of Management and Budget August 30, 2011.
Keyport Public Schools Facility Planning 12/02/15.
Aquatic Facility Concept Design. “Every Dog has its Day” Park Valley Pool Pool is 28 years old and nearing the 4-9 years of identified life expectancy.
0 Soil Management Screening of all soil to be re-used or disposed of Re-use or disposal of excess soil Utility Corridor and Roadway Relocation Project.
Worksession Overview Orange County Budget – FY July 13, 2015.
City of Burbank Burbank Unified School District. Examples of Joint Projects:  Baseball field lighting.  Tennis court lighting.  Resurfacing of tennis.
2007 DSISD School Bond Program DRIPPING SPRINGS INDEPENDENT SCHOOL DISTRICT Bond Election: November 6, 2007.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
State of the School Presentation Monday, March 21, 2011 Monday, March 21, 2011.
U TILITIES 2013 BUDGET OVERVIEW Electric Department – Fund 520 Water Department – Fund 525.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
Norris Public School District Outdoor Activity Facility Planning Report August 16, 2012.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
Tumwater School District Facilities Advisory Committee October 24, 2012.
1 Capital Improvement Program FY To download this presentation, visit our website:
Cuba-Rushford CSD Capital Project
Landen Meadows HOA Annual Meeting 2016 Calendar Year Summary
Cornwall Central School District
Proposed Infrastructure & capital projects
Suwanee Station Master HOA
Capital Construction Bond Program
VCSD Capital Project Community Forum
2017 Annual Program Evaluation Update
Concept Plan for Proposed Park Near Hopewell School
Capital Metro Long-Range Financial Forecast ( )
Springfield Utility Board Proposed 5.0%
2012 and 2014 Bond Update Citizens’ Bond Oversight Committee
Joshua Basin Water District Revised Rate Recommendations
Dana Heiberg, Senior Planner February 5, 2018
Administrative Services Manager
Operating Budget Overview
1300+ High School Seats School Board Work Session May 15, 2017
Annette M. Wells Business Administrator February 9, 2016
Middle/Wildcat Field Enhancement Update
Garden City Public Schools Capital Reserve
PROPOSED FACILITIES REFERENDUM
Annual Homeowner Association Meeting
PUBLIC INFORMATION SESSION
Hinsdale CSD Revised Capital Project ,
Proposed Facility Capital Project List
Budget work session may 20,2019
Welcome Financial Recovery Advisory Committee
Presentation transcript:

Report from Superintendent Board of Education Meeting January 15, 2014

January 8, 2014 Field Facility Project Forum

Review of Proposals

Reynolds Field Proposal Meter Track 6 Lanes (2 inner lanes) Lower Reynolds stays the same

Reynolds 400 Meter Track 6 lanes (2 inner)

Reynolds Field Proposal Meter Track 6 Lanes, relocate tennis courts

400 Meter 6 lane track at Reynolds – Relocate tennis courts

Costs – Reynolds Proposal 1 - $2.68 Million Proposal 2 - $2.4 Million (not including tennis court relocation $440K ) **Both proposals include sidewalk at Chauncey Optional Considerations Walking Lights (6)$ 48,000 Storage Building$120,000 (Cost considerations for every $100K added equals $1.63/year/average house) In-Kind Reynolds $ -750,000 (Savings Approx. $12.23/year/average house)

Burke Field Proposal 1

Burke – Proposal 1

Burke Field Proposal 2

Burke Option 2

Costs - Burke Proposal 1 – Upper Burke expansion (3 level fields) = $1.06 Million – Lower Burke Tennis Courts =$ 440 K Proposal 2 -Upper Burke Expansion (3 tiered fields) = $1.7 Million -Lower Burke Tennis Courts = $ 440 K Optional Considerations Increase Baseball Right Field$ 60,000 Bathrooms$ 143,000 Landscaping$ 50,000 Aerate, Topdress, Overseed lower field$ 36,000 New Roadway, turnaround and handicapped parking$108,000 (Cost considerations for every $100K added equals $1.63/year/average house)

Cost Summary Proposal 1 Reynolds 1$2.68 Million Burke1$1.06 Million Total Fields$3.74 Million Total Buildings$4.05 Million Total $7.79 Million $- 500K (Reserve) Total Bond$7.29 Million Total Annual Cost – Average House $

Cost Summary Proposal 2 Reynolds 1$2.68 Million Burke2$1.7 Million Total Fields$ 4.38 Million Total Buildings$ 4.05 Million Total $8.43 Million $- 500K (Reserve) Total Bond$7.93 Million Total Annual Cost – Average House $

Cost Summary Proposal 3 Reynolds 2$2.4 Million Burke1$1.5 Million Total Fields$3.9 Million Total Buildings$4.05 Million Total $7.95 Million $- 500K (Reserve) Total Bond$7.45 Million Total Annual Cost – Average House $

Cost Summary Proposal 4 Reynolds 2$2.4 Million Burke2$2.1 Million Total Fields$4.5 Million Total Buildings$4.05 Million Total $8.55 Million $- 500K (Reserve) Total Bond$8.05 Million Total Annual Cost – Average House $131.21

Cost Recap Proposal Total Bond (using $500K from Capital Reserve) 1 (Reynolds 1; Burke 1)$7.29 Million 2 (Reynolds 1; Burke 2)$7.93 Million 3 (Reynolds 2; Burke 1)$7.45 Million 4 (Reynolds 2; Burke 2)$8.05 Million Options ReynoldsStorage Building $120,000 Walking Lights$ 48,000 BurkeIncrease Baseball Right Field$ 60,000 Bathrooms$143,000 Additional Landscaping$ 50,000 Aerate, Topdress, Overseed lower field$ 36,000 New Roadway, turnaround and handicapped parking$108,000 (Cost considerations for every $100K added equals $1.63/year/average house)

Budget Calendar

Next Board of Education Meeting January 22 at 7 PM