Biggest Pitfalls and Best Practices in Emergency Management Healthcare Engineering Consultants Strategies for the 2011 Emergency Management Standards.

Slides:



Advertisements
Similar presentations
The Hospital Incident Command System
Advertisements

Museum Presentation Intermuseum Conservation Association.
All-Hazard Emergency Planning for Colleges and Universities
DISASTER PLANNING: Do it Before Disaster Strikes Community Issues Satellite Workshops Department of Commerce & Economic Opportunity.
Airport Emergency Plan - Overview
Local Emergency Management, Public Health Preparedness, & Hospital Emergency Management “A recipe for success.”
Emergency Management Planning Louis Stokes Cleveland, Department of Veterans Affairs Medical Center JCAHO Environment of Care Series Fiscal Year 2009.
Emergency Operations Activation Levels
Hospital Emergency Management
Public Health Seattle & King County Incident Command System Overview May 2004.
Emergency Preparedness Program Nursing Services Orientation April 2010.
Continuity of Operations (COOP) Planning McDonnell A Tuesday 1:30 – 2:45 Emergency Preparedness 101: Personal, Organizational, and Community Don Sheldrew.
Higher Education Pandemic Symposium November 2, 2007 University of Vermont Lessons from Operation Panflu.
Unit 3: Command & Control IC/IMT Interface
The Emergency Management Program
2008© COPYRIGHT 1 1 ATHN DATA SUMMIT DISASTER PREPAREDNESS JULY 31, 2008 PANEL MEMBER - JOY MAHURIN COMPREHENSIVE BLEEDING DISORDERS CENTER CONTINUITY.
Continuity of Operations Planning COOP Overview for Leadership (Date)
Legal Issues in Hospital Preparations for Disaster Response – “Operational Considerations” Knox Andress, RN, FAEN Designated Regional Coordinator Louisiana.
POD PLANNING GUIDE. INTRODUCTION This guide is intended to be a simplified step-by- step guide through the process of planning a Point of Dispensing (POD)
Incident Command System (ICS) for Home Care Kaleida Health Emergency Management and the Visiting Nursing Association of Western New York.
New York State Department of Health HANYS' Nursing Home Emergency Preparedness Webconference June 28, 2007.
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
The Survey Vulnerabilities in 2011 Healthcare Engineering Consultants 1. The Survey Planning Session 2. The Life Safety Specialist Document Review 3. The.
Introduction to Incident Command System (IS 100b)
POD 101 Introduction to Point of Dispensing Emergency Preparedness and Response Program & Community Health Services Version 1.1.
© SMS, Inc., “The Joint Commission ® ’s Standards related to Emergency Preparedness” Presented by: William M. Wagner, ScD CHCM CHSP CHEP Vice President.
Emergency Management CSHE Los Angeles Chapter 2013 Annual.
The Physical Environment Tracers How Should I Prepare for the Physical Environment Tracers? Healthcare Engineering Consultants  Will limit.
National Rural Transit Assistance Program. Learning Objectives Safety Safety Security Security Emergency Preparedness Emergency Preparedness.
Nursing Home Incident Command System
HRSA SURGE CAPACITY DATA SURVEY TECHNICAL ASSISTANCE California Department of Health Services Emergency Preparedness Office.
Risk Management, Assessment and Planning Committee III-4.
Part 7: Meeting the Standards Challenges Healthcare Engineering Consultants Strategies for the Standards Challenges.
: by: Robin A. Bleier, RN, LHRM-FACDONA President- RB Health Partners, Inc. Chair - FHCA Disaster Committee
Page 1 of 32 DMC Incident Command System Incident Command System for Hospitals Emergency Management Department Emergency Management Leadership Task Force.
The Emergency Operations Plan. Primary Reference Emergency Management Principles and Practices for Healthcare Systems, The Institute for Crisis, Disaster.
Presented By: Emergency Management Professionals Dee Grimm RN, JD MUTAL AID AGREEEMENTS FOR HOSPITAL EVACUATION.
Nursing Home Incident Command System Module 5 Implementing NHICS into Your Facility.
Through the Eyes of the Surveyor.  There are gaps!  Emergency Preparedness is now a focus!
Part 4: Preparing for the EC Interview Healthcare Engineering Consultants The EC Interview Session.
Office of State Fire Marshal Oregon State Police Creating Opportunities For Improvement In Preparedness And Response Community Capability Assessment.
Office of Emergency Management University of Houston-Clear Lake Business Continuity Planning.
Key Terms Business Continuity Plan (BCP) – A comprehensive written plan to maintain or resume business in the event of a disruption Critical Process –
Disaster Planning Workshop Hosted By: Pleasantview Fire Protection District.
Part 5: Meeting the Challenge of the “EC Tracers” Healthcare Engineering Consultants How Should I Prepare for the “EC Tracer” Part of the Survey?
1 Verizon Florida, LLC Hurricane Season Preparation PSC Workshop – May 6, 2009.
Writing an Emergency Operations Plan Why do we need to plan? Spring 2008.
Gloria Van Treese, Bureau Chief Florida Department of Agriculture and Consumer Services Food Distribution Bureau.
Business Continuity Disaster Planning
Disaster Preparedness Are you prepared?. Effective Disaster Plans  Your plan should outline the basic preparedness steps needed to handle the anticipated.
Management of Environment of Care. Overview Safety Fire Safety Security Management Hazardous Materials and Waste Management Emergency Preparedness Medical.
Lyle Moore Resiliency Officer Office of Emergency Preparedness and Response.
Emergency Preparedness Emergency Action Plan – EAP Emergency Operating Procedure - EOP Do you have a written plan? Yes – Retained in Human Resources.
1 HEICS IV: A New and Improved Version Coming to Your Hospital?
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
Strategic National Stockpile Points of Dispensing (PODs)
PHYSICIAN ROLES AT THE HOSPITAL IN A DISASTER. (Insert Facility Name) PHYSICIAN ROLES IN THE HOSPITAL IN A DISASTER OBJECTIVES: 1.Discuss the physician.
Community Health Centers of Arkansas Hazard Vulnerability Assessment Workshop August 11, 2017 Mark Fuller.
Randall (Randy) Snyder, PT, MBA Division Director January 27, 2016
[Exercise Name] [Date]
CMS Policy & Procedures
Emergency Operations Planning
Emergency Operations Plan
Emergency Preparedness
Disaster Preparedness
Emergency Management ESFs NIMS, ICS, and HICS Regulations and
Emergency Operations Plan (EOP) Review
Continuity of Operations Planning
Presentation transcript:

Biggest Pitfalls and Best Practices in Emergency Management Healthcare Engineering Consultants Strategies for the 2011 Emergency Management Standards

Emergency Management Healthcare Engineering Consultants The organization of the standards : EM : Plans for managing emergencies, including HVA EM : Emergency operations plan (EOP) developed – Direct Impact! EM : Establishes emergency communication strategies EM : Establishes strategies for managing resources EM : Establishes strategies for managing safety and security EM : Defines and manages staff roles and responsibilities EM : Identifies an alternative means for providing utilities EM : Identifies strategies for patient management EM : Privileges to LIP’s – Direct Impact! EM : Privileges to volunteer staff – Direct Impact! EM : Annual effectiveness review EM : Regularly tests the emergency operations plan

Emergency Management Healthcare Engineering Consultants Issue: Emergency Management Committee Best Practice: Dedicated EM committee not required, but suggested Leadership and physicians should be committee members and participate in planning The committee should perform the following functions: - Review the HVA annually - Plan for emergency drills - Evaluate actual emergencies and drills Plan for other emergency activities

Emergency Management Healthcare Engineering Consultants Issue: Hazard Vulnerability Analysis (HVA) Best Practice: A Hazard Vulnerability Analysis (HVA) is performed and documented, for each geographically separate location The HVA includes a numerical score The hazards are prioritized The HVA is used to define Mitigation and Preparedness The HVA includes the “disaster level” to determine how long the resource timeline charts must be for specific emergencies The HVA is reviewed and revised, as necessary, annually

Emergency Management Healthcare Engineering Consultants

Emergency Management Healthcare Engineering Consultants Issue: Create an Emergency Operations Plan (EOP) Best Practice: Written EOP developed with participation by leadership and physicians EOP describes response procedures for HVA determined events EOP describes procedures for 96-hour community non-support EOP describes the recovery phase of disasters based on HVA EOP identifies the individual(s) who have the authority to activate the incident command function and phases EOP includes descriptions of the six critical core areas: 1) communications; 2) resources and assets; 3) safety and security; 4) staff roles; 5) utility management, and; 6) patient management EOP “crosswalk” is completed to locate required elements EOP is reviewed and revised, as necessary, annually

Emergency Management Healthcare Engineering Consultants Incident Commander Public Info Officer Liaison Officer Safety Officer Med/ Tech Specialist(s) Operations Section Chief Planning Section Chief Logistics Section Chief Finance/ Admin Section Chief HICS Organizational Chart

Emergency Management Healthcare Engineering Consultants Issue: 96-hour Timeline Charts Biggest Pitfall: Stocking supplies for 96-hours Best Practice:  Create color-coded timeline charts that indicate how long utilities will be operational and how long consumable supplies will be available in the event of an emergency in which no re-supply is possible  Ensure that decisions are made to determine whether any utility or supply changes will be implemented to extend “green” or “yellow” zones  Create timeline charts for all of the Level 3 scenarios from the HVA; the timeline is dependent upon the Level 3 duration (how many hours?) Level 1: Supplies are available and are ordered and received Level 2: Internal supply shortages or utility failures require partial or total patient evacuation from the facility Level 3: Shortages and/ or utilities are not sufficient to continue normal patient care, although evacuation is not possible and outside assistance is not available

Emergency Management Healthcare Engineering Consultants

Emergency Management Healthcare Engineering Consultants

Emergency Management Healthcare Engineering Consultants Based on the duration of the Level 3 scenario, the timeline may only extend to 24 or 48 hours, rather than hours48 hours

Emergency Management Healthcare Engineering Consultants Issue: Emergency Communication Strategies Best Practices:  Create notification charts with phone numbers, addresses, etc.  Include for staff, external authorities, community, media, vendors  Determine what information will be shared with other health care providers in the area  Ensure that liaisons are established with government agencies  Verify that MOU’s for alternative care sites are updated  Establish and check operation of back-up communication systems, such as the internet, cell phones, two-way radios, emergency land lines, and amateur radio operators

Emergency Management Healthcare Engineering Consultants Issue: Resource and Asset Strategies Best Practice:  Plans should be in place to stockpile and reorder critical clinical and non-clinical supplies (supply inventory should be checked routinely)  Written procedures should describe how the needs of staff and families of staff will be met during an emergency  A plan to share community resources and assets should be in place  A practical patient evacuation plan that includes partial or total evacuation outside of the facility is required  Logistics for evacuation must include: 1) transportation; 2) staffing; 3) medications; 4) equipment, and; 5) the medical record

Emergency Management Healthcare Engineering Consultants Issue: Safety and Security Best Practices:  Security staffing plans during emergencies must be established  Expectations with outside police agencies should be identified  Plans to dispose of infectious and hazardous waste must be created  Procedures to treat contaminated patients must be written (radioactive, biological and chemical)  Methods to lock down the facility to prevent entry must be provided  Methods to minimize staff and patients from leaving the facility must be planned  Plans must be in place to control traffic accessing the facility

Emergency Management Healthcare Engineering Consultants Issue: Staff Roles and Responsibilities Best Practices:  Review and update as necessary, the ICS organizational chart and job action sheets (check after each drill)  Ensure that hospital staff have participated in NIMS training  Discuss emergency expectations with the independent physicians who have privileges at the hospital  Select the primary and back-up command center locations  Have a method to identify incident command staff (ID badges, vests, caps, etc.)  Make sure that decisions regarding staff and family support needs (house and feed family and pets?) have been determined and are in writing

Emergency Management Healthcare Engineering Consultants Issue: Utility Back-up Strategies Best Practices:  Complete the utility timeline chart for the Level 3’s on the HVA  Determine which utilities require additional supplies, especially water and fuel  Determine the feasibility of redundant systems or supplies Examples: Water – on-site well, water tower or nearby lake Electricity – additional generators installed Boilers – portable boiler “on a truck” Medical gas – low pressure external connection, manifold Fuel – additional on-site storage

Emergency Management Healthcare Engineering Consultants Issue: Patient Management Best Practices:  Identify which patients in the hospital are considered “vulnerable” (neonatal intensive, pediatric, geriatric, dementia, behavioral health, bariatric)  Consider plans to move vulnerable patients vertically without elevators  Plan for patient and staff hygiene and sanitation without water or sewer  Determine mortuary needs in the event of a pandemic  Evaluate back-up methods to track patient information in the event that the electronic information system fails

Emergency Management Healthcare Engineering Consultants Issue: Privileges to LIP’s During Disasters Best Practices: Privileges granted only when EOP has been activated Medical staff bylaws indicate to who and how to grant privileges, and policies will indicate how performance will be evaluated Minimum privileging requirements include: 1. Current picture ID and license to practice 2. Must be a member of a recognized disaster response group 3. Proof of government authority to provide services during a disaster Mentor must be provided to oversee LIP Hospital determines within 72 hours if privileges should continue

Emergency Management Healthcare Engineering Consultants Issue: Privileges to Volunteer Practitioners During Disasters Best practices: Hospital assigns responsibilities only when EOP has been activated Hospital identifies in writing who is eligible and how to assign disaster responsibilities to non-LIP’s Minimum requirements to assist during disasters include: 1. Current picture ID and license to practice professional specialty 2. Must be a member of a recognized disaster response group 3. Confirmation by hospital staff the individual is qualified Mentor must be provided to oversee volunteer Hospital determines a method to evaluate performance and decide within 72 hours if responsibilities should continue

Emergency Management Healthcare Engineering Consultants Issue: Emergency Drills Best Practices:  Two drills per rolling 12-month period should be performed, based on the HVA  At least one drill per 12 months for each business occupancy  At least one “influx” drill for a disaster receiving station  Community-wide and influx drills can be performed concurrently  Don’t forget about patient “surge” drills (IC ) and infant/ pediatric abduction drills (EC )  The community “non-support” drill can be a tabletop  Trained staff, including a physician and leadership, must evaluate the drill and must document the six core areas in the evaluation

Emergency Management Healthcare Engineering Consultants Issue: Emergency Drills (continued) Best Practices:  To count, drills and actual disasters must: 1) initiate the incident command system (ICS) 2) require additional internal or external resources, beyond what is normally available 3) the drill or actual disaster must be documented and include an evaluation of the six critical core areas  Tabletop simulations are permitted for the community and community non- support drills only

Emergency Management Healthcare Engineering Consultants Questions?